RESEARCH LABS. 236-7743 February 16, 1976 Possible Substitutes for Asbestos
i !
i
i
Ta EAST PITTSBURGH
I
LRA-Devl Engrg Mr. P. R. Heller, Mgr.
i*
4cc: R E Fox, Res. Dir.,
ustry Products, Research Labs.
1 i
Russ Fox, ResearchfDirector for Industry Products, seat me the attached letter for information. As far as I know, we have no program either for the ftftcarta Division or LRA to find a substitute for asbestos laminates. If the problem is as urgent as indicated in the attached letter, it would be. desirable to establish such a program as soon as possible. Please let me know your thoughts on this subject.
Attch.
/'
y
'J/"i Cl. LUaj.^\
.Geor.^ W, Wiener
Research Director
Power Systems
!
I
HHBO-B$06757
1
-
<.
) EAST PITTSBURGH - LRA
H.imptor.-Micarca Civ: r-s 422-6320 !U January 26, 1976 SUkcci Asbestos---
44141-AA. AB. AJ. AX
Mr. H. Elliot :
fcl *
(SB
cc: East Pittsburgh/LRA
- Mr. J. Botts
cc: East Pittsburgh/LRA
- Mr. R. Sexton
ce: East Pittsburgh/LRA
- Mr. S. E. Kris*
cc: Piccsburgh/Chatham Center - Mr. W. A. Hiee
v/cc: West Mifflin Headquarters - Mr. E. G. Bittner
*
Confirming our discussion of January 22, 1976.
! '
'
The more restrictive law governing exposure to asbestos fibers bcesnes effective July* 1, 1976. This will reduce the permitted exposure from 5 fibers per cub*ic centimeter to 2 fibers per cubic centimeter. There is a proposed standard which, if implemented, will reduce the exposure level to 0.5 fibers per cubic centimeter*.
I do not believe that Hsmpter. ccr. meet the requirements effective in
July and it i& my understanding that LRA would have great difficulty and
probably coul< not reasonably comply. If we both could comply, I have
no assurance chat our raw tuceriaL supply will be continued and your
Division has received contracts which specifically prohibit the use of
asbestos.
Ocher divisions use asbestos laminates but the corporate impact is by far more pronounced in your slot-vedge application. Since the asbestos problem effects several divisions! Mr. Bittner has requested corporate sponsorship of a R & D program to eliminate its use.
Potential substitute reinforcing materials are available and perhaps some existing laminates would be satisfactory. I believe che major problem at this time is the ability to determine the exact characteristics required of a substitute material.
A
R & D could be most helpful in determining required parameters, testing and identifying potential replacement materials but we cannot wait to see if a R & D program will be established. Messrs. Botts and Sexton are generating a sec of characteristics which t-hey feel are critical. LRA and Micarca will evaluate as best we can to determine desirable limits on these parameters and to evaluate candidates.
03114783
r
HHBB-0006758
East Pittsburgh/LRA - Mr. H. Elliot Page 2 - January 26, 1976
.!
Ve must be prepared to begin using substitute material by July 1, 1976. Obviously, we must generate as much onfidencc as possible to substitute a new material with little, if anyT pplicatlon testing or life testing. Z don't believe we can over-emphasis the urgency or critical nature of this situation.
A. Harrington, General Manager MICARTA Division