Document wgm08En9d5ENxo5zoNeLX0Djo
Monsanto
MMkM |N*Mt a kOCaTlOk'V, C. Engman,* W. 0. Krummrlch
*u April 19, 1972
tVMd mmNCi
HC1 DISTRIBUTION
SYSTEM ALTERNATIONS
TO :
A. E. Leisy
COMPANY CONFIDENTIAL
" D. C. Armstrong
E. R. Blllen
G. L. Bratsch
H. C. Carder
- B2NH
P. E. Helsler
G. A. Hippe
P. J. Holzapfel - B3NA
D. B. Hosmer
- B2NA
R. M. MeCutchan
S. McWilliams
J. R. Savage
' - B2SE
In order to meet the objective of eliminating drowning HC1 gas from the Aroclor Department, modifications will have to be made to the HC1 distribution system. At present, HC1 from Aroclor can be drowned at Dept. 236. This cannot be prevented safely at this time.
C/S and Aroclor Departments will be shut down Saturday (b/22)
for a c/S department turnaround. Shut-down will last a
week to 10 days. In.that time modifications will be made to positively prevent sewering HC1 gas from Aroclor any where except at the Aroclor department drowning jet. A recorder and alarm will be installed in the control room to alert the operator to cut back rate or shut down before gas is sewered. This will support the present verbal communications between C/S and Aroclor operators.
Blanking off of the drowning facilities at the Aroclor department is not recommended as it would create an unsafe condition. Excessive pressure in the HC1 off-gas will cause failure of one or more chlorinator rupture discs. This would result in enveloping the Aroclor department and surrounding area in HC1 and Chlorine gases. In addition, substantial quantities of PCB droplets could be airborne outside the Aroclor curbed area increasing the potential for PCB sewer losses.
/
O'-1/ '7
/!7-
r.-'S
/
W. C. Engman
Technical Services Department
/tm
MONS 098950