Document wgVw5pr8abGya19OpvrkxXq4D

INSTALLATION INSTRUCTIONS ARCOFLAME OIL BURNERS Models MF and M--S MODEL M-S PEDESTAL TYPE MODEL MF FLANGE TYPE ARSS KHS (6-41-3M) American ^ c$tai?dai>d Radiator ^ ^aititaifg cfttwcl/iyJ< CORPORATION ^Puuiwujl, Part 73524 09951 2 09952 ARCOFLAME OIL-BURNER installations must be made to comply with: (a) National Board of Fire Underwriters regulations, (b) Local regulations or codes, (c) Commercial Standards CS-75-39. For detailed information, consult the "ARCOFLAME INSTALLATION & SERVICE GUIDE", available from your wholesaler. OIL TANK GENERAL: Use copper tubing lor all oil lines. For threads use a good OIL-PROOF joint compound. Use only ONE OIL LINE (suction) on all basement tanks when connection is made to outlet at bottom of oil tank. Bottom of tank should be above center line of pump. USE TWO OIL LINES (suction and return) on all underground tanks. Burners come from factory with pump arranged for ONE PIPE HOOK-UP. For TWO PIPE HOOK-UP see pump drawing, Page 8, Fig. 12, and instructions attached to pump. When connecting more than one burner to a single tank, separate suction lines shall be run to each burner. Return lines may be manifolded. Whenever a new burner is installed to replace an old one, a new suction line must be installed, or else, the old one must be thoroughly tested for leaks, to avoid serious operating difficulties in the future. Never fasten oil lines along basement ceiling. BASEMENT TANK INSTALLATION (See Figures 1 and 2). ONE PIPE 1. Erect tank on an iron stand or iron pipe legs with floor flanges about 10" high. Never rest tank on the basement floor. 2. Find a suitable spot, and cut a single or two holes in foun dation or framework through which Fill and Vent Pipes pass. 3. Install the Fill and Vent Pipes. Make sure all joints are tight, and that they pitch to drain to the tank, with no traps. 4. Neatly plug hole in foundation or wall with suitable water proof material. 5. Screw a Vi" nipple and the required shut-off valve into the lower outlet of the tank. 6. Screw another Vi" nipple and a valve into the pump inlet opening. See Fig. 11. 7. Run a piece of heavy walled soft copper tubing between the valves. Provide a loop or a swing joint at the burner con nection. UNDERGROUND TANKS: (See Figure 3). TWO PIPE 1. Insert by-pass plug "B" into pump as per instructions attached to pump. Also see Page 8, Fig. 12. 2. Locate the tank at least 4 feet from the foundation, with the suction lines as short as possible, and to be convenient for filling. 3. The depth shall be such that the top of the tank is below the frost line. In general this is a minimum of two feet, unless local regulation requires more. 4. Install Fill, Vent, Cleanout or Measuring Pipe, and Oil Gauge as shown in Fig. 3. 5. SUCTION LINE SHALL BE ONE PIECE from inside the wall and reach within 3" of bottom of tank. Use Vi' O.D. for runs about 30 feet from tank to wall, O.D. for longer runs. Pitch line from wall back to tank. 6. To inside end attach an approved shut-off valve. 7. Into the valve, screw a short nipple. 8. Screw a `Tee" with a Vi" side outlet to the above nipple, pointing down. 9. To this side outlet, secure a "Detroit CRC-415 Fuel Storage Gauge." 10. Next install a Horizontal Ball Check Valve (or an Anti- Syphon Valve if required). 11. Run a one piece copper tube suction line from the Check Valve to the required valve at the burner. This tubing may be one size smaller than the outside line. Provide an expansion loop at the burner connection. 12. RETURN LINE must be used. It must be same or one size larger than the suction tine. 3 09953 fig. 4--Flange Type Burner (MF) Mounted on Boiler tttttttttctt FIG. 7--Pedestal Type Burner (M--S) Installed with a Pre-Cast Chamber 4 09954 ERECTING BOILER Erect the boiler as outlined in the "Erecting Directions" fur nished with the boiler. It must be set on a solid concrete floor or preferably a concrete slab about 3'' high. COMBUSTION CHAMBER--STEEL--(See Fig. 6) The steel combustion chamber "C" is fastened to the oil burner mounting plate "B" as depicted in Figure 6. This is completely assembled at the factory. NOTE: If a Pre-Cast Refractory Combustion Chamber is furnished, follow installation instructions found with the chamber, OIL BURNER INSTALLATION--FLANGE TYPE--MF--(See Fig. 4) 1. Bolt the mounting flange "A" to the burner mounting plate B. 2. Slide burner into opening for the Air Tube. 3. Tighten burner to mounting flange with short hexagon head plug "D'\ See Figs. 4 and 8. OIL BURNER INSTALLATION--PEDESTAL TYPE--M--S--(See Fig. 7) 1. Regulate the Burner height by loosening lock nut "Y" and turning adjusting nipple "X" to be in exact center of Air Tube Sleeve "V". Tighten lock nut "Y'\ 2. Slide Burner thru opening in the Pre-Cast Combustion Chamber until end of Air Tube "W" projects about W beyond the inside of the chamber. 3. Be sure Burner is centered, not touching heater, and at right angles to the heater. 4. Seal thoroughly the space "Z" between Air Tube "W" and Sleeve "V"--also between Sleeve "V" and the chamber, with wet asbestos cement. This is done within the heater. ELECTRICAL WORK Wire the burner and controls exactly as shown in the diagram found in the control package. CONTROLS Insert controls in openings shown on drawing in "ERECTING DIRECTIONS''accompanying Heating Unit. Connect the Controls as per wiring diagram found in control package. NOTE: Constant ignition is provided for the M--S and MF burners, DRAFT REGULATOR--See Fig. 5 Install the automatic Draft Regulator "F" as outlined in the instructions furnished with the Regulator. It must be located between the stack control and the chimne'y, and at least 12" from the stack control. The closer to the chimney the better. The draft regulator may be located in the chimney, below or above the smoke pipe connection. 5 09955 6 09956 STARTING THE BURNER 1. Remove the Oil Pipe Assembly as follows (see Figs. 8 and 10): (a) Disconnect the copper tube fitting "H" at the pump. (b) Remove the two screws "C" which hold the transformer in place. (c) Pull the transformer *T" out as far as it will go, about 2 inches. The transformer will swing down, out of the way. See Fig. 10. (d) Remove the slotted head screw "B" (Fig. 10) which is located to the right of the steel Oil Pipe *'P". (e) Pull out the Oil Pipe Assembly. 2. Install the proper size nonle "K" required to carry the load. See Fig. 8. NOTE: Remove the strainer from the nozzle and see that the swirl pin is tight. Replace strainer and screw noale "K" into the adapter "L". MAKE SURE THIS IS TIGHT. IMPORTANT: Hold nozzle adapter "L" with wrench while attaching or removing nozzle "K1'. 3. Check Electrodes "M". Use a ruler to make these measure ments. See Fig. 9. Gap to Electrodes are set approxi mately x/%' in front of nozzle, and above the noale center. Bare Electrode Wires shall clear all metal parts by at least M" . 4. Replace Oil Pipe Assembly, and Transformer. Spring Connectors "N" automatically make connection between Transtormer and Electrodes "M". 5. Open all Oil Valves. 6. Swing open observation port or fire door of heater. 7. See that the proper fuses are in place, set thermostat above room temperature. 8. Purge the air irom the pump assembly by removing the lower plug ,lG" on front of pump. See Figs. 8 and 11. Close burner switch and run burner until oil flows from this opening. Catch this in a can or jar. When no further air is evidenced and a steady oil stream appears then: 9. Stop the burner and replace the plug "G". See Figs. 8 and 11. Or, insert PRESSURE GAUGE at this point- 10. Start Burner. Make Air Adjustments at "R" (Figs. 8 and 10) to produce a clean flame, by loosening screw "R" and shift ing pointer. 11. Inspect all joints and fittings for oil leaks. FINAL ADJUSTMENTS 1. Adjust the Draft Regulator "F" (Fig. 5) to provide about .02" draft over the fire. Use a DRAFT GAUGE. 2. Close the Air Adjustment "R" (Figs. 8 and 10) until the flame becomes a trifle smoky. Then open it carefully to the point where a smooth clean flame is procured, and tighten screw. NOTE: The burner comes with the tip of the nozzle back of the air tube opening "S". See Figs. 8 and 9. This position is proper for most installations. However, in some special cases a better and quieter flame is obtained by shortening or increasing this distance. This may be done by loosening the two nuts "A" (Fig. 10) on each side of the Oil Pipe, where the Oil Pipe comes through the cast iron blower housing. Push the Oil Pipe for ward, with the fire going, as far as it will go. Now pull the pipe back very slowly and by careful observation the best location is readily determined. Tighten the two nuts "A". 3. With a Flue Gas Analyzer determine the actual amount of COj. Adjust for final CO* reading approximately 10%. 4. Check the operation of all controls as outlined in the pamphlets found with each control carton. 5. Oil the motor at both oilers, with a good grade of electric motor oil. 6. Hang Operating Instruction Card and Oil Burner Cer tificate if an FHA installation, in vicinity of burner. Fill in com pletely data requested. CAUTION If the boiler room is all enclosed, provide adequate ventilation to furnish sufficient air supply to burner for complete combustion. Provide a minimum of 10 sq. in. of air opening for each gallon of oil burned per hour. FIRE EXTINGUISHER: If required by local ordinance, install approved type. FOLLOW-UP SERVICE: Inspect installation 2 or 3 weeks after placed in operation, and recheck the control system, electrodes and their setting, change in flame characteristics, COj draft stack temperature, as well as oil lines for leaks. 7 09957 FIG. 10--Transformer Pulled Back and Out of the Way PUMPING MEMBERS FIG. 11--Fuel Unit-Pump ALLEN SET SCREW WRENCH (NOT FURNISHED) THREADED HOLE BAG TIED TO FUEL UNIT (INSERT FOR 2 PIPE SYSTEM ONLY) FOR PLUG "B" FIG. 12--Pump with Cover Removed. Illustrating How to Insert Plug for Two-Pipe Installation 8 09958