Document wgGqD816jr35e9zmYYO9X6MVB
SP-L-16 PAINT & INSULATE STORAGE TANK FB-141
REVISION 1
KOCH REFINING COMPANY CORPUS CHRISTI REFINERY
CORPUS CHRISTI, TEXAS
)
AFE 1389 AUGUST 1986
K019265
1
INDEX 1. SCOPE OF WORK 2. JOB INSTRUCTIONS 3. JOB SPECIFICATIONS 4. TANK OUTLINE DRAWING
)
K019266
2
SPECIFICATION SP-L-16 KOCH REFINING COMPANY
1.0 SCOPE OF WORK
1.1 DESCRIPTION OF WORK
A. This specification covers the painting and insulation of items and equipment as described in attached- Tank Outline Drawing.
1.2 DIVISION OF WORK
A. The Contractors shall furnish all labor, equipment, tools, and qualified supervision as spelled out to do a complete job more fully described in attached specifications.
B. All paint and insulation material is to be furnished by
the Contractors.
Material for cleaning contract
equipment shall be furnished by Contractors.
1.3 BIDS
j A.
The Contractor shall submit a LUMP SUM PRICE for the performance of work as described herein.
1.4 JOB SCHEDULE
A. The Contractor shall submit his bid to Mr. Leland Glasgow no later than September 26, 1986.
B. The Contractor shall start work upon award of the contract to meet the field construction starting date. All work shall be completed in a minimum number of days. Expected starting date is October 27, 1986. All work shall be complete by December 22, 1986.
3 K019267
2.0 JOB INSTRUCTIONS
2.1 BUSINESS REQUIREMENTS
A. Correspondence
1. All correspondence to the Company concerning technical matters shall be addressed to the Project Supervisor as follows:
Koch Refining Company P.0. Box 2608 Corpus Christi, Texas 78403 ATTENTION: Mr. Bradley W. Breuer
2. All correspondence to the Company concerning contractual or financial matters shall be addressed as follows:
Koch Refining Company P.0. Box 2608 Corpus Christi, Texas 78403 ATTENTION: Mr. Leland Glasgow
Purchasing Manager
B. Bids
1. Sealed bids will be submitted to Mr. Leland
I
Glasgow.
Bidder shall return his bid in the
enevelope provided by Koch Refining Company, which
is marked "SEALED BID".
2. Contractors shall visit the plant to familiarize
themselves with the job site and working
conditions,
and submit a firm
proposal
comprehensively covering the project so that all
proposals may be properly evaluated.
Proposals
should be based on conditions set forth in these
specifications and attached drawings and be free
of provisions contradictory to the intent of
either.
For job site visit, contact the Project
Supervisor.
3. The Contractor shall return all specifications and documents issued to him under this' Exhibit with his bid.
C. Contract
Koch Refining Company's Purchase Order No. _______________ will be issued to cover the work as specified herein.
K019268
Billing
1. Invoices for the work performed under this Purchase Order shall be clearly identified with the Job Title, Job Number, and Purchase Order Number.
2. Charges shall be broken down as directed by the Purchase Order.
Working Hours
The Contractor's working hours shall be 8:00 a.m. to
4:30 p.m., Monday through Friday. The Contractor shall
not perform any work on Saturday or Sunday, or any
holiday observed by Koch Refining Company.
Any
deviation from these hours will be cleared with Koch
Refining Company's Project Supervisor.
1986 Holiday Schedule
Thanksgiving Day Floating Holiday
Thursday, November 27, 1986 Friday, November 28, 1986
Security
1. The Contractor shall be responsible for the security of his materials, tools, and equipment.
2. Care, safeguard, and protection of material received from the Company becomes the Contractor's full responsibility after his acceptance and will not be replaced by the Company if lost, damaged, or stolen.
3. Plant entrance points, parking lot, and work and/or storage areas for the Contractor employees will be designated by the inspector.
4. All of the Contractor's employees shall be
required to wear an identification badge.
The
badge shall be worn and displayed openly by the
employees at all times while they are on the
Company's
property.
It shall bear the
Contractor's name along with an employee number.
This number shall be recorded by the Contractor
with the employee's name.
This record shall be
made available if requested by Koch Refining
Company at any time during the progress of the
job. This badge is furnished by Contractor.
5. Each vehicle entering this plant must
have
identification of company.
Each vehicle and rig
welder truck must have a vehicle pass. The
Contractor will make the request for these passes
K019269
5
to the Project Engineer.
The number of vehicles
used on the job shall be kept to a minimum. These
passes shall be returned to the Project Engineer
upon completion of the job.
Payment shall be
withheld until said passes are returned.
G. Utilities
Temporary restroom facilities, Skid-O-Kan or equal, shall be provided by the Contractor in -locations approved by the Company. The Contractor shall maintain such facilities in a sanitary condition and, upon completion of the job, repair the area acceptable to the Company.
H. Miscellaneous
1. All material to be furnished by the Company will
be transferred to the Contractor on a "Request for
Material Transfer" approved by an authorized
representative of Koch Refining Company Warehouse.
The
Contractor shall be responsible for the
preparation of such request.
Any deviation from
this procedure should be cleared with Koch
Refining
Company's
Refinery
Engineering
Department.
2. Subcontractors shall be subject to approval by
Koch.
Subcontractors shall conform to the
regulations as specified by the specifications and
attachments.
' kv
K019270
6
3.0 SPECIFICATIONS
The following specification is attached to and made a part of the Job Instructions:
3.1 Painting
A. General
The intent of this standard is to provide guidance in achieveing protection for the equipment against atmospheric corrosion and deterioration, to provide a uniform paint system that has a pleasing appearance, and to assure application in a workmanshiplike manner.
B. Preparation of Surface
1. All surfaces to be painted shall be cleaned and freed of all grease, oil, rust, dirt, loose mill scale, and other foreign material.
2. All surface preparation shall be inspected by a representative of Koch Refining Company prior to painting.
3. Surfaces shall be primed the same day prepared.
4. Bagged sand shall be used on surfaces to be blasted.
C. Pre-Painting Instructions
1. Paint shall not be applied to exterior surfaces before the morning dew has dried, during rainy or threatening weather, during periods of high wind, blowing dust or sand, when the relative humidity is above 85%, when the temperature is below 40`F or at such time that it will be exposed to freezing temperature before it dries, or when operating temperature of steel to be painted is above 125'F.
2. All paints shall be thoroughly stirred to insure
uniform consistency.
No pigment shall remain in
the bottom of the container.
Skins shall not be
stirred into the paint under any circumstances.
3. No portion of the paint shall be transferred to other containers for applicaiton until the entire contents of the container is uniformly mixed.
4. Moisture in paint brushes or containers shall be avoided, thus avoiding coagulation of paint.
K019271
7 T^v'r-^w'y
avoided, thus avoiding coagulation of paint.
D. Painting Schedule
1. Sandblast to white metal (SSPC-SP-5) (roof, shell, & appurtenances)
2. 3 DMT Amercoat Dimecote D-4 or Briners 565 (roof, shell, & appurtenances)
3. Roof & appurtenances only - 2.5 DMT Briners #4817 Tan Versatile Primer 3 DMT Briners #4801 White Versatile
3.2 INSULATION
A. Insulation material shall be 2" thick fiberglass board secured with .020" thick x 3/4" wide stainless steel bands on 12" centers.
B. Jacket shall be .024" thick corrugated (1 1/4" deep) aluminum secured with .020" thick x 3/4" wide stainless steel bands on 24" centers.
C.
i '
Jacket sheets shall be supported on the horizontal seam
by the lower course with S-type clips spaced on 12"
centers.
Sheets shall overlap a minimum 2" at
horizontal seams. Vertical seams shall be spaced a
maximum 15'. Sheets shall overlap a minimum 3" at
vertical seams. All jacket seams shall be secured with
SS sheet metal screws on 6" centers.
D. T-bar supports shall be welded to the tank shell at a
maximum 40 ft. spacing around the circumference. All
insulation and jacket bands shall be secured to the T-
bars.
In addition, jacket bands shall be supported
with V-type clips that are riveted to the jacket.
E. Mastic weatherproofing shall be applied at all openings through insulation such as nozzles, manuals, stairways, supports, etc.
F. Breather springs are required on all insulation and jacket bands.
* NOTE:
Appurtenance defined as all nozzles, stairways, windgirders, etc. which protrude through the insulation.
K019272