Document wgE5VVr7NJXJ5X9VRvQMpQ2n6

INTERNAL CORRESPaNDENCE UNION CARBIDE CORPORATION te chnical cm j u h ' po ROx a . ' suuI'h :i lAfii : c'Cf.j. wv JO h H. E. Rucker 512/2009 B. H. Avashia, M.D. - 23 J. W. Barna - 2009/6 W. L. Browning - 2009 T. L. Collins - 740/2318 C. P. Maxwell - 701/2 B. R. McMakin - 2009 F. R. Sunderland - 2009 January 13, 1987 EM&TS - HS&EA Industrial Hygiene Asbestos Exposure Monitoring at the Institute Plant Attached are the results of the asbestos monitoring performed while the Construction Department insulators stripped insulation from a 2-inch pipe, located in the pipe rack between Building 9 and the Number 1 powerhouse of Plant 512. An insulator was also monitored while stripping asbestos insulation from miscellaneous lines on a colander near Building 12. There were a total of six insulators and one laborer on the pipe rack job, one of each on the colander job. A11 employees were equipped with either an AOR57-A or Willson R12 HEPA cartridge, half-face respirator. They were also equipped with boots, gloves, head sock and 2 pair of coveralls. Each employee indicated that they were wearing no street clothes under the coveralls, and that each showered or would shower before leaving the work place. The results indicate that all' but one sample exceeded, or could have statistically exceeded, the 0.2 fiber/cc Permissible Exposure Level, established by 0SHA for an 8-hour workday (TWA3). The sample that did not exceed the PEL was well above the 0.1 fiber/cc Action Level, also established by 0SHA. The employees indicated that the working quarters, in the pipe rack, was more restricted than the previous monitoring on this job. Since the insulators are working in tighter quarters, you may want to consider taking extra precautions and using more water before, during and after removing the insulation, to keep the airborne fibers at a minimum. UCC 011331 Asbestos Monitoring - continued -2- January 13, 1987 Please notify all employees of their exposure monitoring results as soon as possible. Please have them sign and date this report and return to M. A. Patel at Building 701-330. If we can be of further assistance, please feel free to call us on extension 4779 or 3750. WORK BY: APPROVED BY: VES:MAP:rab 2023P Manhar A. Patel UCC 011332 ASBESTOS EXPOSURE MONITORING Coup. ref. W2109 W2110 Date 1-6-87* Sairple Type/ Employee Name Sampling Time 7hrs 3min Air Cone Fibers/cc 0.147 TWg Fibers/cc 0.130 1-6-87 6hrs 48min 0.459 0.390 1-6-87 1-7-87* 1-7-87 6hrs 37min 0.224 0.185 6hrs 52nin 0.219 0.188 6hrs 43min 0.242 0.203 *Water was used as wetting agent. Job Classification Insulator Insulator Laborer Laborer Insulator _COMUNTS Monitored while stripping approx. 20 feet of asbestos from miscellaneous lines on colander near Building 12. Monitored while stripping approx. 120 feet of asbestos insulation from a 2" pipe located in pipe rack between Bldg 9 and No. 1 powerhouse. Cleaned loose asbestos that fell to the plastic, etc., under pipe rack. Cleaned loose asbestos that fell to the plastic, etc., under pipe rack. Monitored while stripping approx. 120 feet of asbestos insulation from 2" pipe located in pipe rack between Bldg 9 and No. 1 powerhouse. ASBESTOS Permissible Exposure Level -----------------------------------Action Level 0.2 fibers/cc 0.1 fibers/cc OSHA 2023P UCC 011333