Document wb5RKXvB09G31gRRa3LZkneJ

201.142. shall be combined with the requirements . of this Subpart. (Source: MnM at 12 111. tcj.'jilll. .effective March 22. 1988) Section 203.201 Construction PqnH Requirement. and' Application a) ,-* construction permit is required prior to . actual'-construction of a major new source or. . major .mUdlflcatIon. b) applications for constructleh permits . required under this Section, shall contain . . sufficient Information to demonstrate ca^ltence lth IS Ill.Ajhi. code HI and .the requirements^ of this Subchaptef including.' ' but. not limited to. Subpart C. - c) the permit shall Include conditions specifying the manner In which the requirements of Subparts 9 and t of this fart are satisfied. d) No permittee shall violate any condition contained In a construction permit Issued for - a new major stationary source or, major modification which Is. subject to this Part. (Source: Amended it 12 111. Reg, 6118. effective March 22. 1984) #v Section 203.204 Ouratlon of Construction Penult (Repealed) (Source: Repealed at 12 111. Reg. 6118. effective March 22. 1988) Section 203.205 Effect of Permit's The Issuance of a permit for a source subject to the requirements of this Part shall not relieve any person of the 'responsibility to comply folly with applicable provisions of the Environmental Protection Act (Act) (111. Rev. Stat. 19SS. ch. Ill 1/2. pars. 1001 et seq.). this Chapter, and any other applicable requirements under local, state, or federal law. (Source: Amended at 12 1T1. Reg. 6118. effectlye March 22.-1988) Section- 203.206 . Major Stationary Source a) The.following constitutes a major 'stationary source: 1) Any stationary source.of air pollutants which emits, or has the potential -to emit. 100 tons per year or more of any pollutant for which pollutant the area Is a nonattatnment area. 2) Any physical change that would occur at a stationary source not qualifying under paragraph I as a major stationary source.. If the change would constitute a major stationary-source by Itself. b) A major stationary source that is ma;;r ror volatile organic compounds shal' be considered major for ozone. c) The reconstruct ton-'of a-major stationary source will be treated as the construction of . a new major.stationary source If the fixed : capital dost of new components exceeds approximately half of the fixed capital cost of. an cutTfbTy'new'stationary source. .. Determining whether reconstruction will occur Is based On the following: 1) -Fixed, capital cost-shall .mean the capital needW tb 'provlde'aTl -thq depreciable . cowQowtnts; - 2) lh rtied c*pltal cost for the repTacementS-hfcoaqwlsem-Hrthe- llmd capital cost that would be required to construct a comparable entirely new source;. 1) Ihe estimated life of the source after the replacements compa'red to the life of a comparable entirely new source: and V. '- - :* ' ........ ' , ,4) The-eitent to which, the components being. I replaced cause-or contribute .to the emissions from the'-source:' d) Tor purposes of-thlr-fart.- the fegttive ......... emissions of a stationary, source shall not be . Included-1n'.determin1hg-'''whethef It is a-major Stationary source. unlsir tlW~source belongs - : to one of the following categories of .= stationary sources: : 1) Coal cleaning plants (with thermal dryers);' 2) Rraft: pulpmills: ' .1) fortland-eemeht plant-sr" .......... 1 4) Primary zinc smelters; r`S) Iron and steelallTs; . .6) . Primary aluminum-ore reductium-pVants; 2) Primary copper smelters: . ' 8) Municipal Incinerators capable of chai^t^ more' thair-lSb -toifr ef-reFw*e-per .. day; .9) Hydrofluoric:-sulfuric. or'nitric acid plants:- ' 10) Petroleum refineries: 111) Lime plants; 112). Phosphate rock processing plants: >13) Coke oven batteries; !14) Sulfur recovery plants; ., IS) Carton black plants (furnace process)^-.- '16) Prtmary lead smelters:' 17) Fuel conversion plants; 18) Sintering plants: 19) Secondary metal prcrductTon'plahtsr ' - 20) Chemical process plants; 21) Fossil-fuel -boilers (of combination thereof) totaling more than 2S0 million Btu per hoof heat-Input;22) Petroleum.storage and transfer units with . a total storage capacity exceeding 300.000 barrels; 23) Taconlte ore processing plants: 24) 6tjrss"ftber~prucess'tigrprlafitT; - .25) Charcoal production plants: - 28 - I I