r*ROGRL$S REPORT
TECH SIC AL SERVICES DEPT. - W.G. KRUMMRtCH PLANT
W.G. KRCMM RICH PLANT
joe no. _91370:1716
r.iJ REPORT NO,
RESEARCH
GENERAL OFFICE
DAT E
pcJ H.C. CARDER [ | J.M. CONNAUGHTON [ | T.W. OALTON
fjl W.G.Kramper ii. J .R. Savage ti D.E. Harris
(K| P.E. MEISl ER
f.X V. Brawley
*[ ] W.. PAP AG EORG E
n
jj^j H.. PATRICK
u
*PC|J.R. McClain n
*Bcl D.C . Armstronf n
*(^j D. UANNA
(J P.W. EDWARDS
G C8R.E. Soden fjtC.E. ANAONOSTOPOLUS [7} H.L. MINCKL ER
fr] J.E. SMITH ITIIO
(jt| W.. KELLOGG
*tX) L.C. FUHRMEISTCR
Oc H.L. Hubbard (2 A. MULLENDORE O H.W. Bucknei: Q L.E. KLEIN
*(xJ Efltunnmgsosnion e .unsoTi.r
P.G.Benignus
J . Mol1oy
*&) R.G. Moody
klJ.J. Luecken 1:1 n n MO MCCCIVK OH .It lie TI ON
.... ..........
XT J.G. Bryant,
title: AROCLOR: PROCESS IMPROVEMENT PLAN
personnel: d. r, Middleton (J. R. Savage)
problem: Report status of present work and present future plans.
summary: The status of the previous Process Improvement Plan published 7/29/64, is as follows:
Long Range Target UQ, 66)_____
Status
Rate
39. OM #/yr.
Yields (Bi#) 98.0% Theory
Manufacturing $5.985/cwt
Cost
Quality
0.40 ppm Thermal
Chemical Chlorides (TCC)
36.OM #/yr. only need 26.4 through 1969. 98.5$ of theory through June, 1965. $5.859/owt through June, 1965.
Present average 0.50 ppm TCC. New target les3 than 0.15 ppm.
Presently targeted quality improvements are: Recommend facilities required to make Aroclor 1242 with a Thermal Chemical Chloride (TCC)
of less than 0.15 opm Cl by January 1966 and determine how to consistently ship.P/raiols with a power factor of loss than 5% at 100C and 60 cycles by June 1966.
The capacity of Dept. 246 (Aroclor) is sufficient to meet forecasted sales plus 25# through 1969. The capacity of Dept. A-246 (Pyronols) will be increased to meet forecasted sales by up-grading the blending facilities (6/66) and providing storage for TCB, 1260 PPO, and 1254 PPO (1/67). To meet forecasted sales in Dept. B-246 (Pydraul), storage for one of the two product (Pydraul 200 and 280) will be provided by using the present TCB underground storage when it becomes available In 1/67.
MOMS 057628
CONFIDENTIAL INFORMATION Thia document la (tie properly of Monsanto Company and the recipient Is responsible for its safekeeping and disposition. It comsina confidential
infoimation of Monsanto Company which must not be reproduced, revealed to unauthorized parsons or tent outside the company without proper
authorisation. Either retain in secure files or destroy.
91370:1716
Pg. 2
9/17/63
High speed drumming facilities will enable a reduction of 1 man, $10,000/yr. in 1/67. A work force evaluation will be made by 1/67 to determine feasibility
of further reductions.
D. R. Middleton
/Jd
HONS 057629
91570:1716(1)
Fg. 1
9/17/65
DETAILS
Synopsis of Process
The Aroclor Process consists of the following steps:
Chlorination
Batoh chlorination of biphenyl (Biff) with Snlft Oas (contains approximately 86 mole % Cla)at 150C produces crude Aroclor. The by-product Is hydrogen chlorine (H<)1) gas.
Blowing
Crude Aroclor, from chlorlnators, is blown with air to remove excess HC1 before distillation.
Distillation
Crude Aroclor which has been air blown Is continuously fed to the stills. These stills are straight-take-over type with no fractionation.
Earth Treatment & Filtration
The distilled Aroolor Is earth (Attapulgus) treated, filtered, and transferred to storage.
Blending & Loading
The finished produot from the storage tanks is loaded into cans, drums, tank trailers, and tank cars, or used for making blends (Electrical and Non-
Electrlcal).
The principal Aroclors which are produced at WOK are 1242, 1248, 1254, and 1260. The last two digits Indicate the weight plus % chlorine contained In the chlorinated biphenyl mixture (Aroclor).
QUALITY
Aroclor
The two main quality measures of Electrical Grade Aroclor are resistivity and stability. Presently the major portion of quality work 1b aimed at improving Aroclor 1242 stability to less than 015 ppm 01 by the Thermal Chemical Chloride (TCC) method.
HONS 057630
91370:1716(1)
Pg. 2
9/17/&5
The questions to answer concerning Aroclor stability are:
1. What factors effect stability of Aroclor?
a) Raw Material Impurities b) Chlorination Techniques cl Distillation Techniques d) Earth Treatment and Filtration
2. What combination of factors are necessary to produce desired quality at
the. least cost?
.
a) Impurity free raw materials
b; Chlorination Technique: temperature, feed rate, catalyst, geometry
of chlorinator, etc.
'
c) Distillation Techniques: stripping and/or rectifying
d) Earth Treatment and Filtration
e) Chemical Treatment
Chlorination:
Chlorination techniques (in present WGK Plant Equipment) affect the amount of over and under chlorinated Bibut not necessarily the final stability of the product. The variables which have been measured were: amount of catalyst, method of catalyst addition, chlorinator, chlorination rate, chlorination temperature. The first three were the most significant variables.
Distillation:
Laboratory distillations, in which low & high boiling fractions (chemical
nature of these are not known) were removed from plant crude, produced
Aroclor with less than 0.2 ppm TCC. Due to variability of plant crudes
the size of the fractions varied from 1-3/6 for low boilers and 10-15% for
high boilers. It may or may not be feasible to recycle these fractions
to noh-electrlcal Aroclor production.
.
Future Aroclor Quality Work
1) .Organic Research is presently running continuous distillation tests to determine column design and operating conditions needed to refine
present WGK and Anniston Plant crudes to less than 0.15 ppm TCC.
Start: 6/65 EDC: 9/30/65
2) Run plant test using revaporlzed CI2.
Start: 8/65
EDC:
10/65
HONS 057631
91370:^716(1)
Pg. 3
9/17/65
Future Aroclor Quality Work (continued)
3) Investigate Earth Treatment. On two different tests, material earth
treated in plant was 0.1 ppm Cl higher than laboratory treated material.
Current work at Anniston will be followed.
.
Start: 9/65
EDC:
10/1/65
By: TSD , PR & D
.
*1) Preliminary evaluation of Chemical Treatment of ^rude Aroclor to remove unstables.
Start: 7/26/65
EDC:
9/30/65
By: PR & D
5) Vapor Phase chlorination for 1242,
Start: 10/65
EDC:
12/65
By: TSD
6) By 12/1/66 recommend facilities needed to produce Aroclor 1242 at various
TCC levels between 0.5 and 0.1 ppm.
,
Pyranols
The quality of VIOK pyranols (Transformer Blends) must be improved to meet
the market's power factor requirements. The target is to consistently ship material with a power factor of less than 5% at 100C and 60 cycles, and have little or no deterlatlon during transit. Future work in this area is
as follows:
1) Initiate studies to define the power factor problem.
Start: 4th Q of 65
EDC: 6/66 By: TSD
2) From above information take appropriate action.
Start: 6/66 EDC: 6/67
By: TSD
3) Studies to determine effect of exposure to various metals is presently underway.
EDC: 10/65
HONS 057632
91570:1716(1)
Pg. 4
9/17/65
CAPACITY
Dept. 2-46 - Aroelor
Capacity of Dept. 246 (92# On-Stream Time) Demonstrated
I9G6 Forecaat* 1969 Forecast* 1965 Extrapolated
Potential
Yearly'
27.W
31.6 fl#
29.9n#
56.OW#
Monthly
2.3ft#
2.64H#
2.6ft#
3.0ft#
Monthly pluo
2.9ft#
5.5 ft#
25# Surge Capacity
H.J Day'a forecast dated 5/12/65 multiplied by 1.2
-
-
The potential capaolty of Dept. 246 is sufficient to meet the needs of future forecasted eales. The department bottlenecks are:
Produot
Bottleneck
1242
Distillation
1248) 1254) 1260)
' Chlorine Availability
The Ole bottleneck oan be relieved by oleanlng or replacing the snlft gas line from the Cla Dept.
lfie distillation bottleneck oan be relieved by furnace burner alterations and demonstration of high oapaolty still pump with 3" furnaoe ooll.
The only active work In the oapaolty area Is the above demonstration. EDC 11/65.
Dept. A-246 - Pyronals
Oapaolty of Dept. A-246
1260 PPO 1254 PPO A1#B*B Total for Year Avg. Monthly
Avg. Monthly 4 25#
Present Capaolty
1966
1969
Debottlenecked
1965 Extrapolated Foreoaft Foreoast
Capacity
6.32ft#
6.1 ft#
7*. 5 ft#
4.6lft#
4.3 ft#
4.5 ft#'
l.o4ft#
1.15B#
1.15ft#
11.97ft#
11.55ft# 13.15ft#
25.on#
1.0 W#(Max.) 0.96ft#
-- 1.20ft#
1.1 ft# 1.5THIS
2. on#
MQNS 057633
91370:1716(1)
Pg. 5
9/17/65
For flexibility in Dept. A-246 it 1b desirable to have sufficient capacity to meet 25!* surges and sufficient storage for 200,000# of each 1254 and
1260 PPO.
The present capacity of A-246 is 1.0M# (when making the 3 blends). No storage is available for these blends.
A design premise has been submitted for facilities to increase capacity to 2.0H#/month. ($25, - 30,000). This Increase can't be realized until the following Btorage is available:
New 20,000 gallon tank for 1254 PPO New 20,000 gallon tank for 1260 PPO New 20,000 gallon tank for TCB (R/M)
Estimated cost of these storage facilities is $105,000. Design premise will
be out 9/65. Installed January 1967.
Dept. B-246 - Fydrauls
A-200 '
Capacity of B-246
'
1966 " I967
1969 Demonstrated
Forecast Forecast Forecast Capacity
4 .7 M# 5.22H#
5.26 W#
6.0 fl#
Future Capacity
A-280
0.7 M# 1.0 W#
1.5 M
Total Yearly Total Monthly
5.4 14#
O.45W#
6.22W#
0.52H#
6.75 W# 0.56 H#
6.014# .5014#
Meet Forecasted Sales
Monthly 4- 25J*
0.56M# 0.65M#
0.70514#
-
Presently A-200 is the principal blend which is made in the No. 1 Mix Tank.
The capacity is limited by sales, because the product is Btored in the Mix
Tank. The blending capacity will be increased to at least 1.0M#/month (if
Bales are available) as part of the $25-30,000 up-grading Job for A-246.
As A-286 sales materialize storage for one of these blends will be needed to
attain flexibility. For short range No. 6 underground storage (present TCB) oan be used following installation in New TCB Storage.(January 67). Presently there are no long range (thru 1969) plans for Pydrauls storage.
YIELDS
The raw, materials for manufacturing Aroclor are Chlorine Snirt Oas and Biphenyl. The Snift Oas usage is not measured, it is calculated. The Biphenyl yields are bb follows:
1964 BijZf Yield
1965 B10 Yield (through June) 1965 Standard Bi(2f Yield
96.57!* 98.5!* 95.5%
HONS 057634
91370:1716(1)
Pg. 6
9/17/65
The B10 yield losses are as follows: Chlorinator Off-Gas (Collected in Brink and discarded)
Still Bottoms Still Vacumm System Unknown
TOTAL
0.4#
0.5# 0.1# 0.4# l'.lt#
On the average, the Aroclor produced is about 50# Cla, therefore the Cla loss 1b alBO approximately 1,4#. In a 29H# year the yield losses, based on raw mater ial costs, amount to the following:
Cla hi.0
TOTAL
$4,300 6,400
$10,700
The chlorinated B10 and B10 which 1b collected in the Brink ($3,200/yr.) are presently not recycled because Its effect on stability is not known.
The still bottoms are profitably sold as Montar. Presently no extensive
1 future work is planned In this area.
HC1 off-gas recovered by Dept. 217 and F-21 Is 83.4# of theory, through
June 1965. The loss amounts to about $45,000/year of Muriatic Acid credit.
COSTS
Dept. 246 - Aroclor - Baals Jan-July 1965
Cost/100# Aroclor
Cost for 29ffl#/year
Materlal Costs
Cla 810 Mlsc. HC1 (Credit) Handling
Sub-Total
2.0Q0
3.088
0.015 0.730
0.033
(-)
4.496
. 606,000
896,000
, . 4'550 ( -)211,000
9,560
$1,300,000
MOMS 05763S
91570:1716(1)
Pg. 7
9/17/65
COSTS (Cont'd)
Direct Conversion
Steam Labor Salaries Supplies Laboratory TSD Prod. Process Res. Mech. Expense Others
Sub-Total
CoBt/100# Aroclor
0,098 0.223 0.042 0.080 0.082 0.069 0.08l 0.337
.097
1.109
Coat for 29M#/yr
28,700 64,600 12,200 23.200
23,800 20,000 23,500 92,800 28.200
$321,000
Indirect
Dep FIE
Sub-Total
0.122 0.152
0.274
35,400 44,100
$79,500
TOTAL PRODUCT COST
5.879
$1,700,000
In 1966 TSD and Prod. Prooess Res. costs should decrease after answers to quality (stability) problems are found.
In the first quarter of 1967 when blending facilities (Dept. A & B-246) are
Installed there will be a work force evaluation and possibly a reduction.
Extrapolated labor costs for Dept. A & B-246 In 1965 are:
Dept. A-246 (Pyranol)
$14,850/12,000,000#
Dept. B-246 (Pydraul)
$14,900/4,370,000#
In the first quarter of 1967 high speed durmming facilities should also be Installed (TSD Job No. M5007) which will enable work force reduction of one man ($10,000/year savings).
STREAM AND AIR POLLUTION
The principal stream pollutants from Dept. 246 are B10, chlorinated B10, and HC1. None of these are presently considered a problem. In the future approximately 150#/day of B10 chlorinated B10 can be removed from the sewers by sending all off-gas brink collections to the toxic dump.
The principal air pollutant is HC1 gas. This can be minimized by drowning the blow tank vapors and gases with the existing water Jet.
HONS 057t>36
91370:1716(1)
Pg. 8
9/17/65
ACKNOWLEDGEMENTS
Much of the Information and ideas in this plan were obtained from D. E. Harris V. Brawley, J. J, Luecken, W. G. Kramper, and others.
/Jd
D. R. Middleton
HONS 057637
*tkjry '* PT,''T(W ~;q. CS.'SCPIVS
519
Aroclor: Improve
Electrical Grade
C,,uaIIty
3229
Aroclor: l:vtall 3" col?. In '* . 2 still furnace
1IST C? CVP.HZNT AID PROPOSED I03S
SAvurc-s
CAPITAL
"vj
COMPLETION yjyy.yn^r^s
^>g
'"SCtT,*"*CA- * SUCCESS --Sim*rA^ 7ACT0R
Protect Market Position
?
6 1/66 10055 (2v?.l.;
Increase still capacity None coil to be comratable with new low maintenance still pump
V* 10/65 50*
3287
3362
Aroclor: Improve
lr,r.'*i:T2 and o.lending
^."llities
Capacity (to minimum or 2.
Capacity increase needed to meet sales, Possible work force reduction
Meet sales in first half of 1965
$25 $30,000
None
2 6/66 9055 1/2 10/65 10055
M50O7
fa
UOVid: high
$!0,0C0 savings from
labor reduction
1
?
3/67 80*
Provide
Irv.:capacity to
$105,000
k
1/67 . 90*
for .125 " '!>
mne:- sales, flexibility
0 and TC'3
M503*1
V'M
O
Aroclo- .
-'c noof
above !?.! ' ' /! mg
dock
A.roo
-
and ,;'2 j :.n
Aroclor; Provide exhaust fan for r>rv-"--'.: ng Area
Prc'enr, shiur-1' 't delays; s.'.ve $.1,200/jr demurrage
'-'p-'cv'' oua':''1. ' ions y.o oof5 ' 'a savings
Safety - Pxane inhalation
1/4 7*
50* 1/66 50*
O u>
LIST OF CURRENT AND PROPOSED JOSS (Cont'd)
. -i --..
?g. 2 9/17/65
rT*TrT>Ti5^ OHISC^VS
SAVINGS BENEFITS
Pyranols: Investigate
high power factor
problems
.
Needed to meet the industries future requirement
Aroclor: Increase safety of sSJ.I! but toms dronolns ooeratlcn
Safety
Pyranols: Determine
suitable material for
shipment of Transformer
Siends
*
$10-520,000/year customer reimbursement
CAPITAL
TSD TIT'S TO
COMPLETION NAN-MONTHS
EDC
SUCCESS Ptv.SgAj'' '3, CCMM FACTOR
1/2 1/3
1/66 9055 10/66 90/
: >;.
.fcaJSU TcilerirIs Sect!on *nt i.y working on.
- `'r f 4-
; Vr .