Document wKRQoZrv322gR3qkVz92w118D
REQUIRED PROJECTS AT S. CHARLESTON PLANT (PC-381) TO MEET EPA AND OSHA VCM REGULATIONS
PROJECT
1 . VC Rectifying Col. Modifications
2. VC Vent Collection System
3. Modify VC Feed System
it. VC Vapor Recovery System @ N .C.
5. Portable Vacuum Compressor
6. Replace A VCM Transfer Pumps
7- Vent Compressor for 261)0 Col , Vent
8. Scrubber Vent Line to Powerhouse
ENG. ORDER NO. (SHOP ORDER NO.)
938-5708 (79511) 938-5728 (79507) 933-5753 (7*388)
938-5374 (20753)
9. Vent Line from VCM Compressor to Scrubber
10. Revise Packing of Autoclave Piston Pumps
estimated
COST, $ 110,000 0976$)
500,000
300,000
300,000
48,000 (1976$) 24,000 (1976$) 24,000 (1976$) 60,000
I ,000 (1976$)
STATUS Process Study in progress
Nothing being done Nothing being done Nothing being done Nothing being done Nothing being done Nothing being done Eng. & Constr. in progress
Nothing being done
In progress
ii. determine Weed for
Back-up VCM Compressor ya.IOouble distance pieces
* ' for existing compressor
, r (not; installed)
5,000
0976$)
Nothing being done
CM
CO O
O O
=>
REMARKS Estimated to be required in about 3 yrs,(?)to meet proposed EPA regulations. Same as item I.
Same as item 1.
Same as item 1.
Same as item 1.
Same as item 1.
Same as item 1.
Estimated completion date 3/15/76. Required to meet OSHA regulations effective 4/1476, and proposed EPA regu1 at ions. Same as item 1.
Presently evaluating revisions in 1 and B-6 pumps. B-I and B-2 need to be done. Required for OSHA and pro posed EPA regulations.
Same as item 1.
r
^ PROJECT
ENG. ORDER NO. (SHOP ORDER NO.)
b. New reciprocating com pressor (not installed)
c. Mew siid i ng vane compressor (not insta1 led)
12. 2708 Tank Vent (Wash Acetone) with Compressor
13- Revise Packing of Dilution Tank Pump and Spare.
14. Portable Vacuum Com pressor for N.C.
15. 1 nsta11 Line from VCM Sphere to Tank Car for Venting back to car at N.C.
16. Install Valves in VCM Transfer Line from T/C to Sphere to Unit to be Able to isioate Line in 50-gal. segments
17. Install Rupture Disks Under All Safety Valves in VC Service.
18. Replace Dilution Tank Agitator Packing with Double Mechanical Seal
19- Dynatrols for Autoclaves
20. Ventilation System on Bldg. 153
21. Replace Liquid Filled Pressure leads with transmi t ter.
ESTIMATED COST, $ 150,000 (1976$)
65,000 (1976$)
48,000 (1976$)
13,500 (1976$)
13,500 (1976$)
STATUS Nothing being done Noth Ing being done
Nothing being done
Nothing being done
Nothing being done Nothing being done
Nothing being done
REMARKS___________ Same as item 1 . Same as itern 1.
Same as itern 1. Project hasn't been scoped. Required for OSHA and proposed EPA regulat ions Same as item 1. Same as itern 1.
Same as item ].
In progress In progress
Same as itern 1.
(
Same as itern f.
2 installed and calibrated 2 being calibrated 1 on strip, varnish not complete Required for OSHA Essentially complete Required for OSHA Required for OSHA
UCC 103122
UCC 103123
PROJECT___________________________
22. Install Vent Hoods Over Sampling Stations
23- Install Dumpster
Loading for R s 0
2k. Instal1 Two VC Micro
Computer - Gas Chronatograph Monitor Systems
ENG. ORDER NO. (SHOP ORDER NO.)
ESTIMATED COST. $
STATUS Complete
In progress
In progress.
REMARKS Required for OSHA
R & D project. Required for OSHA
Required for OSHA
AJR
2/26/76
1
/gf