REQUIRED PROJECTS AT S. CHARLESTON PLANT (PC-381) TO MEET EPA AND OSHA VCM REGULATIONS PROJECT 1 . VC Rectifying Col. Modifications 2. VC Vent Collection System 3. Modify VC Feed System it. VC Vapor Recovery System @ N .C. 5. Portable Vacuum Compressor 6. Replace A VCM Transfer Pumps 7- Vent Compressor for 261)0 Col , Vent 8. Scrubber Vent Line to Powerhouse ENG. ORDER NO. (SHOP ORDER NO.) 938-5708 (79511) 938-5728 (79507) 933-5753 (7*388) 938-5374 (20753) 9. Vent Line from VCM Compressor to Scrubber 10. Revise Packing of Autoclave Piston Pumps estimated COST, $ 110,000 0976$) 500,000 300,000 300,000 48,000 (1976$) 24,000 (1976$) 24,000 (1976$) 60,000 I ,000 (1976$) STATUS Process Study in progress Nothing being done Nothing being done Nothing being done Nothing being done Nothing being done Nothing being done Eng. & Constr. in progress Nothing being done In progress ii. determine Weed for Back-up VCM Compressor ya.IOouble distance pieces * ' for existing compressor , r (not; installed) 5,000 0976$) Nothing being done CM CO O O O => REMARKS Estimated to be required in about 3 yrs,(?)to meet proposed EPA regulations. Same as item I. Same as item 1. Same as item 1. Same as item 1. Same as item 1. Same as item 1. Estimated completion date 3/15/76. Required to meet OSHA regulations effective 4/1476, and proposed EPA regu1 at ions. Same as item 1. Presently evaluating revisions in 1 and B-6 pumps. B-I and B-2 need to be done. Required for OSHA and pro posed EPA regulations. Same as item 1. r ^ PROJECT ENG. ORDER NO. (SHOP ORDER NO.) b. New reciprocating com pressor (not installed) c. Mew siid i ng vane compressor (not insta1 led) 12. 2708 Tank Vent (Wash Acetone) with Compressor 13- Revise Packing of Dilution Tank Pump and Spare. 14. Portable Vacuum Com pressor for N.C. 15. 1 nsta11 Line from VCM Sphere to Tank Car for Venting back to car at N.C. 16. Install Valves in VCM Transfer Line from T/C to Sphere to Unit to be Able to isioate Line in 50-gal. segments 17. Install Rupture Disks Under All Safety Valves in VC Service. 18. Replace Dilution Tank Agitator Packing with Double Mechanical Seal 19- Dynatrols for Autoclaves 20. Ventilation System on Bldg. 153 21. Replace Liquid Filled Pressure leads with transmi t ter. ESTIMATED COST, $ 150,000 (1976$) 65,000 (1976$) 48,000 (1976$) 13,500 (1976$) 13,500 (1976$) STATUS Nothing being done Noth Ing being done Nothing being done Nothing being done Nothing being done Nothing being done Nothing being done REMARKS___________ Same as item 1 . Same as itern 1. Same as itern 1. Project hasn't been scoped. Required for OSHA and proposed EPA regulat ions Same as item 1. Same as itern 1. Same as item ]. In progress In progress Same as itern 1. ( Same as itern f. 2 installed and calibrated 2 being calibrated 1 on strip, varnish not complete Required for OSHA Essentially complete Required for OSHA Required for OSHA UCC 103122 UCC 103123 PROJECT___________________________ 22. Install Vent Hoods Over Sampling Stations 23- Install Dumpster Loading for R s 0 2k. Instal1 Two VC Micro Computer - Gas Chronatograph Monitor Systems ENG. ORDER NO. (SHOP ORDER NO.) ESTIMATED COST. $ STATUS Complete In progress In progress. REMARKS Required for OSHA R & D project. Required for OSHA Required for OSHA AJR 2/26/76 1 /gf