Document wDrDVxrJKRErRDB993w80G1bV
INTERNAL CORRESPONDENCE
UC 14
CHEMICALS AND PLASTICS
P. O. BOX 471, TEXAS CITY. TEX^S 77590
TO vNAMSi COMPANY LCOA TION
Mr. J. H. Barrett Mr. T. 0. Blum Mr. D. L. Engle Mr. J. S. Knight Mr. W. P. Nickles Mr. F. S. Provenzano Mr. D. R. Reem Mr. R. Ritchie
Copy to
*V
& %
Mr. 0. H. Cunningham Dr. D. H. Glenn Mr. 0. C. Jones Mr. J. B. Leverton Mr. R. A. Ream - 511 Mr. H. Schulz Mr. R. J. Taylor Ms. A. P. Yalcir.kaya
DATE
October 13, 1979
SUBJECT OSHA Investigation on 10-16-79
bcc: Mr. R. E. Graebert - 511 Mr. R. Van Mynen - 501 (21) Mr. J. W. Whittlesey - 501 (46)
Gentlemen:
On October 16, 1979, Mr. Richard Miller, OSHA Industrial Hygienist, conducted an investigation into potential employee exposure associated with the changing of Ethylene Cx'de (EO) filter cartridges at the loading rack. Bldg. 19. This investigation "'as prearranged as Mr. Miller had requested notification of the f*iter change coring a previous visit this year.
A;. r..:-rting r.oti';fff.H was held with Messrs. Miller, Cunningham, Munn, Martin,
ft,
-nJ vs. YalcinViya in which it was restated that this investigation was .asso ciated with the NIOSH - OSHA brain tumor survey. Mr. Miller also stated that this visit would probably conclude OSHA's involvement in that joint survey.
At the conclusion of the brief meeting we moved to the EO loading rack and were met by Mr. 0. C. Jones. An eight-hour breathing zone sample was taken on the product handler assigned to the EO rack and short-term breathing ;zone samples were collected on the two riggers who renewed the filter elements. Duplicate samples of all OSHA monitoring were collected by the I. H. Department.
Pictures were taken by Mr. M. E. Montague at Mr. Killer's request of the fi'ce" changi c operation in order to demonstrate the procedures 2nd protective
uti -'zed by tre ear-1 cvees. The prints will be reviewed arc provided
tc Killer hen thsv are available.
Short-term breathing zone samples were also collected for the two pipe fitters
yaif who removed the slip-blinds from the EO filter system.
4**
H# %
UCTC 21191
I
4
Mr. J. H. Barrett, et al October 18, 1979 Page 2 After removal of all sampling equipment, Mr. Miller informed us again that this would probably conclude OSHA's activity in the NIOSH brain tumor investigation and that a closing conference would be offered at a later ; date. Mr. Miller then left the plant. If you have any questions concerning this report, please contact me at ext. 5589.
Sincerely Kirk E. Martin Industrial Hygienist
UCTC 21192