Document wDe9QGbZQdyk1D98vkozDMp7o

t K conoco Interoffice Communication To : From : R. D. Gamblin I A. F. Gallagher Date : November 7, 1974 subject : VCM Health Program Report #11 At the VCM Health Program Meeting held November 6, 1974 each of the currently active projects was reviewed and the status up-dated. i i Farther up-date meetings will be held on a call basis. A * Gallagher Chief Process Engineer cc: JWP, RWS, LWK, JES, KWC, TRL', FMW. FJS, JEB (2) , MCJ, CGR L. N. Vernon J. F. Gabbett R. T. Ferrell R. A. Frohreich R. G. Weiss W, R. Sorenson E. M. Smith J' f - w - --1 - T m VAB.0001043260 Responsibility % JEB/RWS/KWC TRL RWS/KWC TRL TRL KWC KWC/MCJ/RWS i 1 1 b i. * KWC/MCJ/RWS * li KWC/MCJ/RWS 4 VCTCTHEALTH PROGRAM REPORT > Project * Status Steam stripping the small reactors to '210F. > \* Control room pressurization. Install steam stripping line on reactor E-2 and revise L and M lines, * b Control Rooms for V-ll and V-12. Relocate V-ll and V-12 charge instruments. Install an exhaust hood on the V-ll and V-12 recovery systems. A work order has been written to change the temperature transmitter range oh one line in V-12. * The tower will be completed 11/15. The total project completion date will be by 12/1. r .t T*s required to convert L and M lines to 1" are on order. The project will be completed when the T's arrive. I\ 4 i Construction of the V-ll and V-12 contro rooms has been completed.- The total project completion date will be 12/15. i Delivery time for the required material is 170 days. Project completion date 2/15/75. i * 4 Exhaust hood on the V-12 recovery system: has been completed and V-ll will be completed 11/8. Install a#4" overflow line from the D-300/400 sweco dump box to the sewer. ' * Install a 12" x 4" duct from the D-300/400 dump box to the existing sweco exhaust line. * + Use the old V-10 utility fan for the D-300/400 exhaust fan. * Installation will be done at the time of the D-500/600 tie-in. r * m Installation will be done at the time of the D-500/600 tie-in. Exhaust fan will be tied in.during the D-500/600 shutdown. J * VAB.0001043261 4- I I REACTOR AREA Item No. 10 A 11 12 n Responsibiltiy KWC/MCJ/RWS KWC w M * \ JEB/GWP/TRL 13 TRL/RWS 14 vi 15 16 i* 17 V V k + KWC" JES CGR TRL * VCM HEALTH PROGRAM REPORT *4 s \ Project- +' Repair the leaking cap on the D-300/400 'sweco discharge port. * m `Pipe VCM return line at V-ll* (from V-12) to blowdown tank to prevent venting when lines are opened. Reactor Cleaning System for V-11. * n fc n Modifications to the BFG HRC unit in V-12. Repair leaks on all compressors. A Stop leaks on VCM unloading valves. Reduce the VCM lost to the atmosphere from the rail car liquid unloading line. i Replace Manhead in V-ll. Status t This will be done during the D-500/600 shutdown. < The piping has been completed and the tie-ins will be made during D-500/600 shutdown. Evaluation of the Vinatex unit has been completed. A design and cost estimate is being prepared to purchase a similar unit. The pump installation for V-ll will be completed 11/22. A boot to repair the leaks did not work A new seal has been designed and is ready to try. Modification to the HRC length has been completed. * Additional information has been trans mitted to MED for their study. A plan of action will be formulated during November. 4 k Gate and globe valve will be used to replace the present plug cock valves as they arrive. f* A Kamvalock coupling will arrive during November for evaluation. i Complete. + I I VAB.0001043262 ` REACTOR AREA Item No. 18 19 ResponsibJLltiy TRL MCJ DRYER AREA 1 2 TRL JEB/RWS/LHB * 3 JEB 4 JEB j- VCTT HEALTH PROGRAM REPORT 4 L Project . Honeywell instrument for continuous monitoring. ' Reduce the residual VCM in the large reactor resin after recovery. t Status Materials on order. The project >. completion date will be 1/75. * % A program for steam stripping the large reactors will be set up during Novejnber. This program will be based on the large reactor steam stripping results from Oklahoma City. Install a remote system to monitor the level in all resin silos. The evaluation has been completed and AFE will be nrenared. 1, i1 Recycle system for sifter overflow to prevent rehandling of trailings and reduce exposure on first floor. The evaluation of a hopper for the fine overflow system has been completed and hoppers will be made up for each of the remaining dryers over the next two months. The type of coarse overflow handling system will be designed based on the exposure results being monitored during November. Evaluation of residual VCM in the finished bulk resin. Further testing of steam stripped j*esm V will be conducted during November to evaluate the effect of increasing stripping temperature to 210F. Evaluation of residual VCM in the finished Complete., bagged resin. VAB.0001043263 COMPOUND DRY BLEND AREA > I I 11 II w Item No. Responsibiltiy I TRL 2 *- 3 CGR m KWC GENERAL 1 2 * a* 3 * JES/GWP RDG/GWP - FJS % k VCM HEALTH PROGRAM REPORT Project Status Vent the welex mixers to the outside of the building and equip line #1, scrap unit and line #3 blenders with ventilation n ' system. 4 * * * . bb Monitor VCM levels around line #1 vent hood. + Sample ports for dry blend coolers. Installaion of the hoods on the Welex . mixers have been completed. The scrap unit and line #3 will be completed during November. Further testing is planned when the hood modifications are made. a H A sample port will be installed on one dry blend blender-coolers'during November for evaluation. Ventilation improvements in both ware house buildings and compress warehouse. Continued education of employees on the hazards of VCM and the importance of following procedures. Further data will be gathered before a plan will be formulated. - Continuing project. 1 i ` | I Improve the effectiveness of laboratory fume hood used in the testing~of peroxides in the VCM. Engineering proposal will be issued during November. ^ * v 4 t * h t i i- VAB.0001043264