Document wD1p18x8wKjE7wNnorBzr9Z9Q
fi
Jo:Temperature:
F, Humidity;
Weather Conditions: SA/phJM
TENNECO ORGANIC^k POLYMERS DIVISION
DAILY OVA MONITORING REPORT , FLEMINGTON RESIN PLANT
DATE A/8-7S'
W) ^5^8
Distril^^ion:
1
J.T. Sweeney
G.I. Rozand
Quality Control File
%, Barometric Pressure:,Q
, Wind Velocity:JkL mph, Wind Direction (from): Time Started; /&30
Monitoring Point
Meter Reading, ppm
Dial
Corrected
Comments
j 1. Black Top Area Adjacent to Warehouse 2. Up-Wind Plant Location
1 "4 _ -ZJLZJ
-.X............ -
ITDown-Wind Plant Location
Lunch Room
^L
Quality Control Laboratory 5, Laboratory t?1> near 2-roll mill 6. Laboratory 2, between sink & PlastiCordei 7, Laboratory #2, desk 8. Office
. 9. Laboratory #1, hood area when testing VCM 10, Laboratory #2, GC area when testing VCM
4 /o
ft.
r
...
--
T-
y
7
i
--
S/oY YsYj<s________________________________________
Dryer Building/Warehouse_____ 11. Foreman's Office______ 12. Maintenance Office 13. Maintenance Shop______ 14. Warehouse________ 15. Warehouse'office 16. Bagging Room_________ 17.' Dryer Monitoring' Desk
SRAOIO
Monitored By:
Date: A/3-^
Witnessed By
L810IQ
Monitoring Point
Dryer Building/Warehouse (cont'd) 18, Dryer Panel Board 19, Tailing Collector Area 20, Sitter Deck 13 21. Centrifuge B 22. Sifter Deck A 23, Centrifuge A 24. Slurry Transfer Hook-Up 25. Wet Cake Sampling 26. Bagging Machine - Opr's. Station when bagging 27. Bagging Machine - Opr's, Station when filling Gaylords
Underground VCM Storage,Tank Farm 28. Tank Farm Area, center of Tank Farm 29. Compressor Shack, inside 30. Wallway Between Tank Farm & F-6 Blend Tank 31. Checking Tank Level 32. Checking Blend Tank LEL & O2, top of blend tank
Meter Reading, ppm
4 Dial
Corrected
Comments
___ a______ i
11 Oj q
/p/ y&
/i9tf
_
___
----
A'gT'SACC/a/G
7
n~
to
*--~
--
6 --
Breathing Air Required Breathing Air Required
!
Meter Reading, ppm
Monitoring Point
Reactor Building - Second Floor (cont'd) 43. Panel Board, aisle in front of Stripper Platform 44. Stripper Platform 45. Center Aisle 46. Open Reactor, aisle around manway 47. Reactor Opening
48. Opening & Closing Hammer Blinds
49. Opening & Closing Dump Valves 50. Water Jet Reactor si. Reactor Cleaning, manual
52. Reactor Closing, close hatch &
bolt down
* ' Corrected
g
.__
to to
99
-- ---
---
Reactor Building - Ground Floor 53. Center Aisle 54. Slurry Basket, aisle in front of baskets 55. Methocel Make-Up Platform 56. Recovery Comp. Room - Between comp. 57. Slurry Basket Cleaning 58. Slurry Sample from Stripper
< (o s' (o .< \o 9
-- --
Recovery Tank Farm 59. Recovery Tank Area, adjacent to center tank 60. Walkway near Bunker
. 61. Catalyst Weigh House, inside 62. Settling Ponds, edge of pond near Rx bldj 63. Recovery Tank, water drain-off
5
iTfo
<
i? 9w
Pilot Plant 64. Reactor Area - First Floor 65. Reactor Area - Second Floor 66. Finishing Area, center aisle 67, Opening Dump Valve 68. Closing Dump Valve 69. Reactor Dumping
7
,. ,, --
3T JT
--- *--
Comments ......... - ------------------ --------
Ccwc**
i*AK>
Breathing Air Recuired '
Breathing Air Re cm ired Breathing Air Required
Breathing Air Required
Breathing Air Required Breathing Air Required Breathing Air Required
010784
Monitored Bv:
/f(/A^ Date:
Witnessed
-------- Date!
sf-
Monitoring Point
Pilot Plant (cont'd) 70. Reactor Opening, remove bolts. open hatch 71. Reactor Cleaning, manual 72. Tower Bottom Removal 73. Reactor Closing, close hatch cover
& bolt down
Boiler House 74. South End - Inside 75. North End - Inside
Bulk Loading & Transfer 76. Tower, walkway between tower & bins 77. Transfer Line Hook-Up 78. Bulk Truck Sampling 79. Bulk Rail Car Sampling
j 80. Production Office
81. FabriCal Building, office area
82. R&D Building, office area
Monitored
Meter Reading) ppm
, Dial
Corrected
Comments
--"
H____ -
---- --
Breathing Air Required Breathing Air Required Breathing Air Required
A...
J?/
__ <___ ____ /_____
7 73
f3? -4________
Witnessed By:
jgaaS
fa Page 4
010783
R.A, Lojewski Revised 12/10/74
9^010
NATURE OF WORK fVNoO <Voe/Cfo
PERMIT TO:
WELD
GRIND
CUT
DRILL
CHIP
HOT TAP
OTHER (LIST)--------------------------------------------------- DO INITIAL DONE
WORK WILL BE RESTRICTED TO AREA OR
EQUIPMENTSPECIFIED ON PERMIT
WORK LOCATION EXAMINED BY SUPERVISION
FLAMMABLE GASES, MATERIALS, DUST REMOVED
CONTINUOUS EXPLOSION METER CHECKS SEWERS COVERED FIRE BLANKETS HUNG FIRE EXTINGUISHER READY PLANT WATER HOSE ON WELDING EQUIPMENT IN GOOD REPAIR AND PROPERLY SECURED.
n
OTHER PRECAUTIONS----------------------------------------------------
SAFETY EQUIPMENT REQUIRED
f^nATF
STARTING TIME
PERSON DOING WORK
SAFETY DEPARTMENT OR SH
AREA SUPERVISOR
SUPV. ISSUING PERMIT
PERMIT EXPIRES DATE
.TIME.
RETURN TO SAFETY DEPARTMENT
AM PM