Document wD1bw0o47edprKyzVgg280NQ3

771 CHAPTER 71 1962 Guide And Data Boole Table t .... Sizing Condenser Drain tine1 F'tpe Sin Condenser to Rneeivnr In. H X y. 1 IX IX 2 2X 3 4 6 > Application DiU-Yotk Carp. Annowa of 100 Fpm Velocity lb per Mn 3.5 5.9 11 18 32 44 85 121 186 322 727 Vertical Condensers and Surge Receiver The piping of two vertical condensers and a surge receiver is illustrated in Fig. 16. A surge receiver takes care only of the normal fluctuation of refrigerant supply to the various evaporators. It is not generally sized to hold a large amount of refrigerant for storage purposes. An equalizing connection is always needed on the surge receiver to relieve the gas pressure .above the liquid level. Rising of the equalizing lines can be made from Table 2. The liquid line from the condenser to receiver can be based on a velocity of 150 to 200 fpm and can be sized from Table 3 or from Chapter 69. The reason for this higher velocity (as compared with 100 fpm on through type receivers) is that the line can be run full of liquid. It is not necessary to allow room for gas, which might flash in a warm receiver, to find its way back up the same line to the condenser without restricting liquid drainage from the condenser. An oil drain is shown from the lowest part of each con- Table 2 .... Equalizing tine Size Surge Receivers' Maximum Fhnt Capacity Tone Equalizing (fa* Sin Schedule 40 Fip, In. 220 300 . 500 X l IK > Application Data--York Carp. denser into an oil receiver. Oil, being heavier than ammr.rt{a liquid, will settle out at the lowest point. Prior to removing oil from the receiver, the drains from the condensers should be closed and the suction valve to the pump-out compressor or to any low-euction pressure compressor should be opened to clear ammonia out of the oil. Evaporative Condenser When a single evaporative condenser is used with a through type receiver it can be connected as shown in Fig. 17. Equali zation between the evaporative condenser and receiver is ob tained in the liquid drain line which is razed in accordance with Table 1. Therefore, it is important that no traps be al lowed in this line. The receiver should be located in the shade; never in the Bun. In areas where temperatures below 32 F are encountered, provision must be made to prevent the water from freezing at light plant loads. When freezing temperature is reached, the evaporative condenser can usually operate as a dry coil unit satisfactorily. One method of preventing the water.from freezing is to place the water tank inside and have it ingtaJtwl as illustrated in Fig. 18. When the outdoor temperature drops, the head pressure drops and a pressure switch, with its sensing element in the discharge pressure line, stops the water pump-- the water being drained into the *nlr. Provision should be made to drain the exposed piping and also any trapped water headers in the evaporative condenser. This is usually the last step in maintaining the plant head pressure for good ammonia distribution to the various evaporators. The first step in main taining head pressure control is to have a pressure actuating device on the discharge line to modulate air dampers in the air stream, cither entering or leaving the evaporative con denser, or to have an air bypass arrangement from leaving Refrigerant Piping Systems for Ammonia 773 Table 3 .... Condenser fo Receiver Piping Surge Receiver1 Ftp* Six* X ix IX 2 2X 3 4 6 15 Ammonia/Mia FS0 fpm 16 27 49 200 fpm 22 36 65 67 89 127 170 180 240 280 480 1090 370 640 1450 i AppUestioa Data--York Carp. to entering. A two-speed fan motor is sometimes used in ^injunction with the air throttling method. Parallel Operation of Evaporative Condensers Evaporative condensers have an inherent pressure drop due to the fact that gas flows through relatively small pipes in fairly long circuits. With two evaporative condensers of unequal raze, pressure drop through each coil at rated load irill proh&hly be different and this has to be considered in the f|rign of the drain piping and equalizing'piping between the evaporative condenser and the receiver. The essential re quirement in connecting evaporative condensers in parallel s that sufficient vertical height must be provided in trapped liquid legs to allow the liquid to seek separate levels and counteract the varying effect of refrigerant pressure drop in the evaporative condensers without backing up liquid into the condensing coil which has the highest pressure drop. Fig. 19 illustrates two evaporative condensers of unequal size interconnected with one through type receiver. The re ceiver is equalized with the gas inlet line. This means that the pressure in the top of the receiver and in the gas inlet line will be the same. The equalizing line may be sized from Table 4. At the outlet of each evaporative condenser, the pressure will be different due to the different coil pressure drop. Therefore, the liquid will stand in' the vertical pipe' to a different height in each case. Representative values have been shown on Fig. 19 to illus trate one evaporative condenser with a 1 psi pressure drop and one with a 0.5 psi pressure drop. The pressure drop in the discharge line is included in the calculations. For each 1 psi difference between coil outlet pressure and receiver pressure, four feet height of static ammonia is re- 1. Evcporojire condenser 2. Spray hnoder connection 9. Pan ornflo* 4. Fan drain 5. Roof 6. Tank 7. Make-up wafer fnM S. Fhat 9. Tank overflow 10. Tank drain 11. Pump 12. Strainer wrtk blow-off vafvw 13. To itwf 14. Floor 15. Leaker Urn fa. 16. Refura fromevaporative condenser Rg. 18 .... Evaporative Condenser with Inside Water Tank quired. Therefore, with an outlet pressure of 1S3.8 psig and a receiver pressure of 185.0 psig, a height of 1.2 psi X 48 in. or approximately 58 in. is required. Provision must be made to valve off idle evaporative con densers. Purging of air from this type of system is difficult because air can only reach the receiver through the equaliza tion line off the discharge line, or through the liquid drain line if the system is shut down for an extended period. The best locations to purge from during operation are at the purge valves connected to the top of the drain line from each oondenser. If control of head pressure is designed into this type of system, it is necessary that the proportion of tonnage from Rg. 16 .... Parallel Vertical Condensers with Surge Receiver Rg. 17 .... Piping for Singte Evaporative Condenser and Through Receiver