APPENDIX E - Amendment No. 1 Scope of Work - CEA 2080
07 - Foundations
For Elevator~Pit (Reinforced Concrete)
150 cu.ft.
08 - Supports, Platforms and Structures
Equipment SupportForItem 152
6 tons
Grating Requirement For Item 152
225 sq.ft.
Handrails
60 ft.
Toeplate
60 ft.
Stair Requirement
One Stairway For One Level
11 - Piping
Item 1-152
Service Material Size
Charge
C.S. 3" X4"
Charge
C.S. 2"X3"
Therminol C.S.
Vent
C.S. 3" X4"
Overflow C.S. 3"X4"
Outlet
C.S. 2" X3"
i--i
>
--i 1
Rmks. Length Insul. Valves
Jacketed 125 Ft. 2"
1 - Jctd
Jacketed 125 Ft. 2"
1 - Jctd
- 200 Ft.
2 - FAS
Jacketed 30 Ft. -
-
Jacketed 30 Ft. lh"
-
Jacketed 50 Ft. ih"
1 - Jctd
12 - Ductwork
A 6 ft. X 8 ft. X 10 ft. hopper will be required under the new flaker.
13 - Electrical
Use PVC coated conduit.
19 - Insulation
Item 1-152
Area 320 ft2
Thickness 2"
90 - Dismantling 2
A section of floor in Building 27 - Area 400 ft for 1268 flaker.
TOWOLDMONOQ48673
92 - Repairs Expense
5. Repair or replace section of floor at new 1268 flaker.
93 - Relocation and Modification Expense
Remove Item (5) from original scope and replace with the
' following: -
-
,
5. Relocate 18" I beam to south of control room. This beam is 40 ft. long and will be mipved south approximately one foot.
6. Relocate 2 - 6" IPS tower water lines to south of control room - Total feet = 100.
7. Relocate miscellaneous 2" IPS pipe to south of control room - Total feet = 100.
0612372
TOWOLDMONOQ48674
APPENDIX E - Amendment Mo. 2 Scope of Work - CEA 2080
This amendment describes the work required to install a power pulverizer to grind flakes-of Aroclor 1268. It includes a ' mill, conveying duct to dust collector, air lock to discharge material into fiber containers and a dust collector with blower. Instruments will be required at the dust collector.
03 - Setting and Testing Equipment
Pulverizer will be located under the flaker unit. The dust collector and pulverizer will be located on support steel.
08 - Supports, Platforms and Structures
Miscellaneous equipment supports, light steel
1 Ton
12 - Ductwork
Install 75 feet of 6 and 8" duct for blower and pulverizer.
11 - Piping
. -
Install 100 feet of 1^" IPS piping to filter for air.
13 - Electrical
Motors to be installed and wired:
Number
Horsepower
1 10 15 1
Conduit run to dust collector controls.
20 - Painting
Support steel with Std. #502 Epoxy System
0612373
TOWOLDMONOQ48675
APPENDIX E - Amendment No. 3 Scope of Work - CEA 2080
Spares
A pump, indentical to Item 1-134,is to be purchased and held as a spare in the storeriyom. Item 1-134 is a special submerged pump, critical to the operation of the Aroclor plant, and is required to prevent losses due to pump failures.
Size TDH Make
200 GPM 100 Feet Taber Heavy Duty
0612374
TOWOLDMONOQ48676
APPENDIX E - Amendment No. 4 Scope of Work - CEA 2080
.
07 - Foundations
For access to elevator
1 ft wide x 4 ft high x 40 ft
160 cu ft
Retaining wall at west end of manufacturing area
1 ft wide x 2 ft high x 25 ft
50 cu ft
Floor slab for elevator access 8 ft wide x 6" thick x 25 ft
100 cu ft
11 - Piping
300 ft of 2" IPS 200 lb steam line, insulated
13 - Electrical Lighting for control Room area 20 ft x 30 ft
600 ft2
15 - sewers Add 25 ft of 4" permanite to existing 6" sewer in the HCl area.
90 - Dismantling
Remove existing elevator after new elevator is installed.
Dismantle 10 foundations in ground to north of Building 27:
Size: 4.5 ft x 13.5 ft x 1.25 ft thick
Dismantle 500 gallon jacketed tank with agitator at present 1268 flaker.
0612375
TOWOLDMONOQ48677
93 - Relocation and Modification Expense
8. Relocate telephone lines to north of Building 27.
9. Relocate 100 ft of 2" IPS nitrogen line to north of Building 27.
10. - Relocate 50 ft of. 2" process lines from new pipe bridge to north of Building 27--two lines.
'.
11. Relocate steam tracers and trap discharge to new
condensate pig.
*
12. Relocate 3" IPS gas line in control room area - 30 ft.
13. Relocate 4" cast iron vent from toilet.
14. Relocate stove, sink, refrigerator and water cooler into new control room.
15. Relocate stairway to third level of Building 27 to ejector operating level.
16. Relocate No. 3 Blower to No. 4 Still Blower Tank.
17. Add 20 ft of 10 inch duct to existing tar blow stack.. -
18. Relocate and modify stairway outside of Building 27 at NE corner which will interfere with elevator.
0612376