Document w9r7Ey4mDrabp1BQaKOxdYXJ

APPENDIX E - Amendment No. 1 Scope of Work - CEA 2080 07 - Foundations For Elevator~Pit (Reinforced Concrete) 150 cu.ft. 08 - Supports, Platforms and Structures Equipment SupportForItem 152 6 tons Grating Requirement For Item 152 225 sq.ft. Handrails 60 ft. Toeplate 60 ft. Stair Requirement One Stairway For One Level 11 - Piping Item 1-152 Service Material Size Charge C.S. 3" X4" Charge C.S. 2"X3" Therminol C.S. Vent C.S. 3" X4" Overflow C.S. 3"X4" Outlet C.S. 2" X3" i--i > --i 1 Rmks. Length Insul. Valves Jacketed 125 Ft. 2" 1 - Jctd Jacketed 125 Ft. 2" 1 - Jctd - 200 Ft. 2 - FAS Jacketed 30 Ft. - - Jacketed 30 Ft. lh" - Jacketed 50 Ft. ih" 1 - Jctd 12 - Ductwork A 6 ft. X 8 ft. X 10 ft. hopper will be required under the new flaker. 13 - Electrical Use PVC coated conduit. 19 - Insulation Item 1-152 Area 320 ft2 Thickness 2" 90 - Dismantling 2 A section of floor in Building 27 - Area 400 ft for 1268 flaker. TOWOLDMONOQ48673 92 - Repairs Expense 5. Repair or replace section of floor at new 1268 flaker. 93 - Relocation and Modification Expense Remove Item (5) from original scope and replace with the ' following: - - , 5. Relocate 18" I beam to south of control room. This beam is 40 ft. long and will be mipved south approximately one foot. 6. Relocate 2 - 6" IPS tower water lines to south of control room - Total feet = 100. 7. Relocate miscellaneous 2" IPS pipe to south of control room - Total feet = 100. 0612372 TOWOLDMONOQ48674 APPENDIX E - Amendment Mo. 2 Scope of Work - CEA 2080 This amendment describes the work required to install a power pulverizer to grind flakes-of Aroclor 1268. It includes a ' mill, conveying duct to dust collector, air lock to discharge material into fiber containers and a dust collector with blower. Instruments will be required at the dust collector. 03 - Setting and Testing Equipment Pulverizer will be located under the flaker unit. The dust collector and pulverizer will be located on support steel. 08 - Supports, Platforms and Structures Miscellaneous equipment supports, light steel 1 Ton 12 - Ductwork Install 75 feet of 6 and 8" duct for blower and pulverizer. 11 - Piping . - Install 100 feet of 1^" IPS piping to filter for air. 13 - Electrical Motors to be installed and wired: Number Horsepower 1 10 15 1 Conduit run to dust collector controls. 20 - Painting Support steel with Std. #502 Epoxy System 0612373 TOWOLDMONOQ48675 APPENDIX E - Amendment No. 3 Scope of Work - CEA 2080 Spares A pump, indentical to Item 1-134,is to be purchased and held as a spare in the storeriyom. Item 1-134 is a special submerged pump, critical to the operation of the Aroclor plant, and is required to prevent losses due to pump failures. Size TDH Make 200 GPM 100 Feet Taber Heavy Duty 0612374 TOWOLDMONOQ48676 APPENDIX E - Amendment No. 4 Scope of Work - CEA 2080 . 07 - Foundations For access to elevator 1 ft wide x 4 ft high x 40 ft 160 cu ft Retaining wall at west end of manufacturing area 1 ft wide x 2 ft high x 25 ft 50 cu ft Floor slab for elevator access 8 ft wide x 6" thick x 25 ft 100 cu ft 11 - Piping 300 ft of 2" IPS 200 lb steam line, insulated 13 - Electrical Lighting for control Room area 20 ft x 30 ft 600 ft2 15 - sewers Add 25 ft of 4" permanite to existing 6" sewer in the HCl area. 90 - Dismantling Remove existing elevator after new elevator is installed. Dismantle 10 foundations in ground to north of Building 27: Size: 4.5 ft x 13.5 ft x 1.25 ft thick Dismantle 500 gallon jacketed tank with agitator at present 1268 flaker. 0612375 TOWOLDMONOQ48677 93 - Relocation and Modification Expense 8. Relocate telephone lines to north of Building 27. 9. Relocate 100 ft of 2" IPS nitrogen line to north of Building 27. 10. - Relocate 50 ft of. 2" process lines from new pipe bridge to north of Building 27--two lines. '. 11. Relocate steam tracers and trap discharge to new condensate pig. * 12. Relocate 3" IPS gas line in control room area - 30 ft. 13. Relocate 4" cast iron vent from toilet. 14. Relocate stove, sink, refrigerator and water cooler into new control room. 15. Relocate stairway to third level of Building 27 to ejector operating level. 16. Relocate No. 3 Blower to No. 4 Still Blower Tank. 17. Add 20 ft of 10 inch duct to existing tar blow stack.. - 18. Relocate and modify stairway outside of Building 27 at NE corner which will interfere with elevator. 0612376 TOWOLDMONOQ48678