Document vyL8qbRQbGy6QYx33Qn57opJY

.. COMPANY CONFIDENTIAL , 1'7--00 S. ---------- ---- 0 / / fi ' ILT SECO-N---O-----S--T----- ) . - //y, u ^ ' j J [GENERAL OFFICES_________________________________ Anniston V. P. B. Hodgts \o(. X. Baez W. A. tuhn W. B. ?apageorge L. J. Boesch 3. L. Williams J. C. Landwehr W. F. Taffse L. C. Lehman 1. A. Haydel L. L. Faulkner . G. W. Millar . PROGRESS REPORT TECHNICAL SERVICES DEPARTMENT ANNISTON. ALAIAMA PLANT JOB HO. 370-740 *EPOT MO. 1 DATE February 24, L969 TITLE: OBJECTIVE; AJOTISTCH PUUTT DEPAJETMXSTAL WASTX A0DIT3 To Identify the major Mite components free ell the operating departments end to provide relieble flow dete to thet vesta lones can be eccuret Air celculeted. PERSONNEL: E. G. Wright (V. T. Teffee) REPORTED IT: E. C. Wright SUMMARY: At the present time both the weite treatment plent end the neutreliretion pita era opereting et near capacity. During certain perloda thaie systems era overloaded. These audits will provide data to show where these losses actually are and provide soae Insight as to bow chase losses can be reduced. The reduction of loss of these losses will provide for better operation of the waste treatwent plant as well as the neutralisation pits. The Cast period will last for two weeks in each operating department. Flow eeasurassent will be aade a minima* of three tines in each department so chat a good average flow race can be determined. The sampling will be done la Che less manner is which It is now done. Accurate data will be collected on production ratas so chat the losses can be related to'this. Sample data sheets and drawings showing sailing points are attached at the end of this report. rUTUlX VORX: 1. After identifying these vesta materials, efforts will be aade to decar mine seechode by which these loeses can be reduced. 2. After completion of all of the audits, a comprehensive report will be issued. X. C. Wrij Technical Services Dept. OSW 014277 WATER PCB-SDOOOO017081 u Anniaton TSD Progress ieport 370-740 ?ge 2 Dacaila 1. Sailing Procaduraa: Tha sampling program will continue to aperaca si it Is operating prssencly (it. m^jLss will be taken at Cha mm points at which they are praaencly collected). Theaa Mapiea will ba 24 hour co^ailci u^lu la aoac cases, howcrar 4 hour composites will ba collected e cha hold tanks la chs Si ran daparcaaac. These M^jlaa will ba collaccad using Cha (mail Landolph Peri staltic puo^s which ara now being uaad. A dacallad account of whara cha saspias will ba collaccad and Aac they will ba analysed for la Included In cha daacrlpclon of each departmental audit. 2. Plow Kaaiurauici: Plow iaeaauraenti will ba taken using a method developed at the VGC Plane. A known concentration of Lithium Chloride lolution will ba eatarad Into cha daalred a awar. Ac a na point downacraa* uaplta will ba collaccad from cha awar. Theaa Map 1 aa will ba collected using a high apaad Landolph Periitaltlc puap. The flow aaaauraaanti will ba aada a minimum of three Claaa In Mch department to inaura that an accurate average flow la da carwined. Llchiua Chloride was chosen for chase flws waaauraaanca bacauaa ic la noc normally found In cha plane (awar system and bacauaa It can ba dacaccad uaing readily aval lab la analytical methods and Instrumentation. Departmental Audita ' 1. Chlorine Dapartaant: The chlorine dapartment will not ba audited bacauaa of the thuedown of cha facility. However, sas^lea from the aaat limeitone pic will ba analysed for mercury because of cha toxicity of this material. 2. HC1 Department: Background: The primary wmaca products from this dapartment ara HC1 and organic (Aroclor) awcarial. Presently, Cha BC1 department la (awarlag approximately one-third of cha production or X 1 pounda par day (baaed on theory) . Thii cauaes problem with the operation of the eaat limes tone pic. These losses ara Intentional bacauaa cha department la trying to purge organic aacarlal fros Cha SCI ayatam In an attampc to produca Seal ay Crada (organic fraa) HC1. Programs ara now underway looking for a batter method to remove chase organics. Sampling Poinca: (Sea attached drawing) Analysis A. Influent to LiMsconaPit ph, X HC1, Hg, X organics B. If fluent from LimestonePit ph, X HC1, Eg, X organics C. By-paaa Ditch ph, X SCI, Ig D. Total Plant Iffluanc ph, X HC1, Hg, X organics, P04 osw oi>278 WATER PCB-SD0000017082 u Andscon TSD Progress leporc 370-703 ) ?*ge 3 2. HCI Department: (continued) flow Mssiurismc: The Lithium Chloride solution will be aacered laco the scid iwtr u close to the HCI departaenc as possible. The diluted leapIts Till be collected ec Che aeohola loeecad JusC southvaac of gate Ho. 6 (see attached drawing) The Biphenyl department probably will contribute soae of this llov, but it won't affect the calculations of HCI losses from the department. Accurate records will be leapt on production rates so chat losses can be correlated to production rates. 3. Peranitrophenol Department: Baerground: The major waste products fro* the PSP department are FTP, Had, PHC3, 0NC3, X3C3 and HaCH. These aatariala account for approxlaecely 13-201 of the total loading to the waste treatment plant. This amount varies with the efficiencies of the carbon adsorption twrers. By doing this audit and care fully noting the operating conditions, it is possible that soae of the vari ables in carbon enter operations can be defined. ' Sago ling Points: (See attached drawing) Analysis A. Toxic Sewer fro* FTP O PTP, P5C3, 0HC3, JHC3, Bed, C.O.D., ph PIctv Mea lureeent: The Lithium Chloride solution will be aetered Into the toxic sewer (southwest corner of PS? structure) at the use point et which the sables are collected. The diluted samples will be taken downstream In the toxic sewer above where the Hlran department dee into the sewer (see attached drawing) . The flow In this sewer la aaintained ec a raladvely constant race so the three flow mea surements which ere planned should give a reliable e-scrags flow. 4. Aroclor Department: The primary westee from the Axoclor department are organic eecerlals and HCI. These westee originate from spills, pomp leeks, or whsn Chs department is being cleaned up. IXxa to the recent concern over chlorinated Biphenyl (Axoclor) coayouada being found la the tisane of some aniaels and the effects of these co^ouad* an the pelstsblllty of fishes, It Is necessary that the quantities of this materiel being loet 1s determined. ' Semolina Points: (See sttached drawing) A. Manhole adjacent to PoroceL Col uses Analysis Organics, 1 IC1 Plow Measurement: The Lithium Chloride soludon will be eetered into chs aanhole iamediacaly north of chs south maintenance shop. This will include the flew from the Chlorine department ee well es the phosphoric acid acucrelisadon pic. The flow from the phosphoric add pit la known. The flow from chs Chlorine department can be aeesured by the Lithium Chloride dilution acchod, and then the floe from Che Axoclor department can be calculated. QSb 01^279 WATER PCB-SD0000017083 u inH iron XSD Prograas Xeport 370-760 J ?*ge 1 5. PerarM on D^4rtMSC: Background: Tha primary vasts produces fro* cha Parathlon department are Srhyl and Kathy! hracMon, Zthyl and Kathyl Intermediate, acacona, Paranitropkaaol and Inorganic sales (la. KeCl, A2C03/ SaHCO^ . Acacona Is cha largest C.O.D. contributor in cha department. A program la underway ac cha prasenc time experimantlng with ways of reducing chaaa loaaaa. This program conslscs of applying a lowar vacuum oa eha condensation raaccor. If this program la successful, chare should ba a larga reduction la C.O.D. loading eo cha vesta craacmaac plane, tha reduction In C.O.D. loading will result In aora afficianc and easier operation of cha waste traatmanc plane. Semolina Polncs: (Sea attached drawing) Analysis A. Still Jet Header I HC1, Intermediate, C.O.D. ph S . Coca Tank Overflow FKP, C.O.D., Parathlon, Acetone c. Peed to Basins PSP, C.O.D., Parathlon, Acetone, pb, Sua. Solid D. Incinerator Scrubber Water i h3po4 Plow Kaasureaanc: The flows ac cha cone tank, still jet headers, and Cha incinerator scrubber era aeCared by rocomacars. Thesereadings will ba noted carefully during Cha vesta audit period. However, Lithium Chloride will be used to check on these valves by measuring tha total flmr from cha Para chi on department. The actual flow to the aeration basins will ba measured using Cha magnetic flew aatar located In the Influent feed line from Cha bold tanks to tha basins. br Attach. . X. G. Wright OSW 014280 WATER PCB-SD0000017084 uJ WASTI AUDIT DATA SHUT WATER PCB-SD0000017085