Document vyBO9ZaE9yz9XYGJOozgyXjy6

PLAINTIFF'S EXHIBIT LSET October 27, 1997 is; Abatement Plan for the Removal of Asbestos Power House Basement ASARCO, Inc. I P: 5: for. ASARCO, Inc. Peggy Munsell, Industrial Hygienist P.O. Box 1111 El Paso, Texas 79999 PREPARED BY: SUN CITY: - ANALYTICAL INC ' ENVIRONMENTAL SERVICES 1409 Montana Avenue El Paso, Texas 79902 (915) 533-8840 SOTE: This project mituil sis desifoed for aoti directa] herein lad is designed to be usaJ inth Sun City Analytic.], Inc. .ir monitoring SOP'S end menu.!]. This bodies mi) doi be used for icy other purpose. SUN CITY ANALYTICAL, LNC. assumes no responsibility for any other use or misuse of (his project mamalCopyri^hi (C) IWfi SUN CITY ANALYT1CAL, INC. All rifhu reserved. So portion may be reproduced without expressed written content from Sun City Analytical. INC. ASARCO ELP 0010821 Design For: ABATEMENT PLAN Asbestos Abatement Power House Basement ASARCO, Inc. El Paso, Texas Prepared for ASARCO, Inc. Attn: Peggy Munsell 2301 W. Paisano El Paso, Texas 79902 LICENSED ASBESTOS CONSULTANT AGENCY: TEXAS LICENSE #10-0011 SUN CITY ANALYTICAL, INC. 1409 MONTANA EL PASO, TEXAS 79902 LICENSED INDIVIDUAL ASBESTOS CONSULTANT: Luis M. Acuna P.E.A. TEXAS LICENSE #10-5039 SUN CITY ANALYTICAL, INC. 1409 MONTANA EL PASO, TEXAS 79902 October 27, 1997 ASARCO ELP 0010822 TABLE OF CONTENTS BID ANNOUNCEMENT (4) SUPPLEMENTARY CONDITIONS (6) BID FORM (8) PROJECT SCHEDULE (11) SECTION 01010 SUMMARY OF WORK (12) 1.01 Statement of Work ....................................................................................... 12 1.02 Project Objectives ............................................................................................ 12 1.03 Description of Work ..................................................................................... 12 SECTION 01030 SPECIAL PROCEDURES OR CONDITIONS (14) 1.01 ASARCO - Power House ............................................................................ 1.02 Schedule of Abatement................................................................................ 1.03 Site Security ..................................................................................................... 1.04 Emergency Repairs........................................................................................ 1.05 Medical Emergency....................................................................................... 1.06 Rental Equipment............................................................................................ 1.07 Patented Products............................................................................................ 1.08 Electrical Work.............................................................................................. 1.09 Special Garments and Training .................................................................. 1.10 Noise Hazard ................................................................................................ 1.11 High Heat & Steam Line Hazard ................................................................ 14 14 14 14 14 15 15 15 15 15 16 SECTION 01043 PROJECT COORDINATION (17) 1.01 Work Requirements:..................................................................................... 17 1.02 Qualification Requirements: ....................................................................... 17 1.03 Personnel Qualifications:.............................................................................. 17 1.04 Permits: .......................................................................................................... 18 SECTION 01091 DEFINITIONS AND STANDARDS (19) 1.01 Applicable Publications: ................................................................................ 1.02 Definitions:....................................................................................................... 19 20 SECTION 01300 SUBMITTALS (25) 1.01 Submittals with Contractor's Proposal:...................................................... 25 1.02 Submittals required at Pre-Abatement Meeting:...................................... 25 1.03 Submittals required Daily during Abatement:.......................................... 27 1.04 Submittals Required at Conclusion of Project.......................................... 27 ASARCO,Inc. H Faso 1 Power Boose Basement Abatement ASARCO ELP 0010823 1.05 Disapproved Submittals: .................................................................. SECTION 01410 TESTING LABORATORY SERVICES (28) 1.01 Air Monitoring and Sampling: .................................................. 1.02 Methods of Analysis:......................................................................... 1.03 Clearance Samples ........................................................................... SECTION 01500 TEMPORARY FACILITIES & CONTROLS (30) 1.01 Temporary Buildings......................................................................... 1.02 Telephone Service.............................................................................. 1.03 Water for Construction .................................................................... 1.04 Electricity for Construction ............................................................. 1.05 Employee Conduct ........................................................................... 1.06 Advertising ......................................................................................... 1.07 Barricades............................................................................................ 1.08 Security................................................................................................. 1.09 Toilets ................................................................................................. SECTION 01513 AIR FILTRATION SYSTEM (31) 1.01 .Air Filtration System......................................................................... SECTION 01527 WORK AREA PROTECTION (32) 1.01 Preparation......................................................................................... 1.02 Fire Protection .................................................................................. SECTION 01528 ENTRY INTO CONTROLLED AREAS (35) 1.01 Entry and Exit of Work .Area ........................................................ SECTION 01560 RESPIRATORY PROTECTION (36) 1.02 Respiratory Protection....................................................................... SECTION 01562 PERSONNEL PROTECTION (38) 1.01 Personnel Protection: ...................................................................... 1.02 Worker Protection............................................................................. SECTION 01563 DECONTAMINATION UNITS (39) 1.01 Enclosures: ......................................................................................... SECTION 01632 PRODUCTS (42) 1.01 Materials: ........................................................................................... 1.02 Equipment:......................................................................................... 27 28 28 29 30 30 30 30 30 30 30 30 30 31 35 36 38 38 39 42 43 Sun City Analytical, Inc. (c)copyright 1997 2 ASARCO.Inc. H Paso Power Boose Basement Abatement ASARCO ELP 0010824 SECTION 01701 PROJECT CLOSEOUT (44) 1.01 Reestablishment of the Work Area and Systems:..................................... 44 SECTION 01712 CLEANING & DECONTAMINATION (45) 1.01 Clearance Air Monitoring:............................................................................. 38 SECTION 01714 WORK AREA CLEARANCE (47) 1.01 Clearance Air Monitoring:............................................................................. 47 SECTION 01716 DISPOSAL PROCEDURES (49) 1.01 Disposal Procedures ...................................................................................... 49 SECTION 02081 GENERAL REMOVAL PROCEDURES (51) 1.01 Procedures:...................................................................................................... 51 SECTION 02082 GLOVEBAG REMOVAL PROCEDURES (53) 1.01 Procedures:......................................................................................... Sun City Analytical, Inc. (c)copynght 1997 ASARCO.Inc. El Paso Power Boose Basanaa Almnncrt ASARCO ELP 0010825 1 BID ADVERTISEMENT FOR ASBESTOS ABATEMENT AT ASARCO Power House Basement P.O. Box 1111 El Paso, Texas 79999 Notice is hereby given that sealed proposals will be accepted for asbestos abatement of the above location ONLY from invited contractors. The proposal shall be in accordance with Plans and Specifications designed by: SUN CITY .ANALYTICAL. 1409 Montana El Paso. Texas 79902 (915) 533-8840 INC. The Proposal will be accepted until 1430 HOURS. Tuesday. November 04th, 1997 at: SUN CITY .ANALYTICAL, INC. 1409 Montana El Paso. Texas 79902 (915) 533-8840 where they will be publicly opened by Owner and Consultant. Bid proposal shall be accompanied by a Bid Bond, or cashiers check payable without recourse to ASARCO, Inc. in the amount of not less than 5% of the total bid. Bid proposal when submitted indicates the Bidder will furnish all bonds and Insurance called for in the provisions. The Bidder also certifies that each project will be completed on or before the specified date. Successful Bidder shall complete project in accordance with dates set forth in Project Schedule included in this project manual. If Bidder fails to finish project in said dates, he is liable to ASARCO Inc. or have deducted from funds owed, as liquidated damages the sum of five-hundred (S500.00) dollars per day plus Consultant and/or Air monitoring costs per day for each calendar day of delay until the project is substantially completed. Sun City Analytical, Inc. (c)copyright 1997 4 ASARCO,Inc. O Paso Power Boose Baseman Abatement ASARCO ELP 0010826 There will be a mandatory pre-bid walk-thru of the project on October 28, 1997, at 1000 HOURS. All interested Bidders are required to attend. Prospective contractors should arrive no later than 1000 HOURS on October 28, 1997 at the ASARCO security gate located at 2301 W. Paisano in El Paso, Texas. Contractors should bring a hard hat, goggles, hearing protection, long sleeve shirt, respirator with acid gas filters and boots. It is also recommended that the contractor bring a flashlight. Owner reserves the right to refuse any and all offers for any reason that serves the best interest of the Owner or building Occupants. Owner reserves the right to waive any technicality or irregularity in the project plans and/or Bidder documentation. Conflicts and questions arising during the bid phase and throughout any asbestos abatement activities will be resolved on a basis of whether an asbestos or non-asbestos related activity is involved. Any asbestos related conflicts and questions will be governed by the appropriate project manual sections. Otherwise, the Owner's supplementary and/or up-front "boiler plate" documents and anv other non asbestos related sections of the project manual will be applicable. Conflicts and questions which the selected Contractor fails to bring to the attention of Owner and/or Consultant prior to being awarded the.contract will be resolved at no additional cost to Owner and/or the Consultant. Contractors desiring Plans and Specifications may obtain Bid Documents from SUN CITY ANALYTIC.AL. INC., at the Bid walk through or at SCAI offices after October 27, 1997. A fifty dollar (S50.00) non-refundable deposit is required per set of plans and specifications. San City Analytical, Inc. (c)copvnght 1997 ASARCO,Inc. El Paso Power House Rasancnt Abatement ASARCO ELP 0010827 Page I of 14 Asarco Construction or Repairs Contract Form PD-19 Under 5100,000.00 Revised 6/95 CONTRACT FOR at ASARCO incorporated's EL PASO facility at EL PASO, TEXAS THIS AGREEMENT made the ____ day of ______________ 19_, by and between _________________________________________________________________________ . whose address is______________________________________________________________________ (hereinafter called the "Contractor") and ASARCO Incorporated, a corporation of the State of New Jersey, whose address is 180 Maiden Lane. New York. New York 10038 and P. O. BOX 1111, EL PASO. TEXAS (hereinafter called the "Owner"). Whenever used in this agreement, the terms "Owner"' and "Contractor" shall include their respective directors, officers, employees, servants, affiliates, subsidiaries and/or agents. The term ''Contractor" shall also include any and all subcontractors and their officers, employees, servants, affiliates, subsidiaries and/or agents, suppliers and any other parties under Contractor's direction or control in connection with the Work. WITNESSETH: The Contractor and the Owner agree as follows: Article 1. Scope of the Work The Contractor shall furnish all shop drawings, field engineering, labor, tools, equipment, transportation, materials and other facilities, except such items as are hereinafter listed as being furnished or furnished and installed by the Owmer, for _________________________________________ (hereinafter called the "work") at the EL PASO Plant of the Owner at EL PASO, TEXAS, in accordance with the drawings and specifications listed below, all of which are incorporated herein by reference and made a part hereof: ASARCO ELP 0010828 (List Specifications and Drawings) EQUAL OPPORTUNITY STATEMENT ADDENDUM "A" SAFETY AND HEALTH ADDENDUM WASTE CONTAINER LABELING MEMO DATED APRIL 29. 1996 CONTRACTOR OSHA COMPLIANCE LETTER DATED MARCH 22, 1996 Page 2 of 14 Article 2. Time of Completion The work shall be commencedand shall be completed Article 3. Payment (to be deleted if progress payments are to be made) The Owner shall pay the Contractor for the performance of this Contract, the sum of dollars (S), lawful money of the United States of America within THIRTY days after satisfactory completion of the work and submission by the Contractor of evidence (including, if requested, complete releases of all liens arising out of or in connection with the work by all persons, firms or corporations on whose behalf such liens could be or were filed) satisfactory to the Owner that all charges for labor and material incorporated in the work and all other indebtedness connected with the work for which liens could be filed have been paid and that the work is free of all liens and encumbrances. Article 3. Payments (to be deleted if progress payments are noi to be made) The Owner shall pay the Contractor for the performance of this Contract, the sum of dollars (S), lawful money of the United States of America, as follows: On our about the day of each calendar month, commencing , 19___________________. the Owner shall pay the Contractorpercent (____ based on the contract prices, of the labor and materials incorporated in the work and of materials suitably stored at the site thereof up to the end of the next preceding calendar month, as estimated by the Owner, less the aggregate of previous payments; and upon completion of the entire work, a sum sufficient to increase the total payments topercent (_____ %) of the contract price. Final payment of the remaining _percent (___________________ %) of the contract price shall be due days after completion of the work. ASARCO ELP 0010829 Page 3 of 14 Before each such payment is due, the Contractor shall submit evidence satisfactory to the Owner (including, if requested, partial waivers, or in the case of final payment, complete releases, of all liens arising out of or in connection with the work by all persons, firms or corporations on whose behalf such liens could be or were filed) that all charges for labor and material incorporated in the work and all other indebtedness (except, in the case of payments other than final payment, indebtedness not then due) connected with the work for which liens could be filed have been paid and that the work is free of all liens and encumbrances. Article 4. Payments Withheld The Owner may withhold all or part of any payment to the extent necessary to protect the Owner from loss or damage on account of (a) damaged or defective work not remedied, (b) claims filed or reasonable evidence indicating probable filing of claims by other parties against the Contractor or the Owner, (c) failure of the Contractor to make payments properly to Subcontractors or for material or labor, (d) a reasonable doubt that this contract can be completed for the balance then unpaid, (e) damage to the Owner's property or the work of another contractor, (f) failure of Contractor to remove any equipment, appliances, tools, materials, supplies or wastes from Owner's property, or (g) Contractor's violation of any applicable laws, ordinances, rules, regulations, standards and/or other governmental requirements. Article 5. l iens If any lien remains unsatisfied after payment of the full contract price has been made, the Contractor shall refund to the Owner all monies that the latter may be compelled to pay in discharging such lien, including all costs, expenses and a reasonable attorney's fee. Article 6. Guaranty Bonds If the Owner has so requested prior to the signing of this Contract, the Contractor, at the option of the Owner, agrees to furnish or permit the Owner to secure bonds in the full amount of the contract written by a surety company designated by, or otherwise satisfactory to, the Owner, guaranteeing and conditioned for the full, complete and faithful performance of this contract by the Contractor and for the payment of claims for labor performed or materials furnished in connection herewith, all in accordance with the terms of the bonds. The premium for the bonds will be paid by the Owner and must not be included by the Contractor in the contract price. In the event the Owner elects to secure such bonds, the Contractor agrees to sign the required application, to furnish necessary financial statements and financial guarantees, and to otherwise cooperate with the Owner, in securing the bonds. If any change in work is authorized pursuant to the terms of this Contract, Contractor shall cooperate with Owner so as to ensure Owner's ability to secure and maintain bonds for the same. Article 7. Title to the Work ASARCO ELP 0010830 Page 4 of 14 Title to all work completed or in the course of construction shall be in the Owner and title to all machinery, equipment and materials to be incorporated in the work shall be in the Owner as soon as they are delivered on the site of the job. Article 8. Inspection and Repair The Contractor shall provide safe and proper facilities at all times for the inspection of the work by the Owner, and shall as soon as practicable after written notice from the Owner, at the Contractor's sole expense, replace and repair any materials or portions of the work which the Owner, in its sole discretion, shall deem defective or otherwise not in compliance with the specifications, desiun or performance requirements set forth in this contract and make good all work damaged or destroyed thereby, whether or not there shall be a dispute with respect to any of the foregoing. Any such dispute shall be settled by arbitration. Article 9, Protection hv Contractor The Contractor at all times shall maintain adequate protection of the work from damaae and shall protect the Owner's property and all persons thereon from injury, damage or loss by reason of any act or omission of the Contractor or any Subcontractor. Where such damage includes damage to the work it shall be repaired at the expense of the Contractor. The Contractor shall use its best judgment and skill in dealing with labor matters, and take all reasonable steps to avoid labor dispute. In the event of any strike or threat of strike, slowdowns, featherbedding, or other like practices, the Contractor shall apprise the Owner of all relevant facts and implications of the particular labor problem involved, and shall consult in good faiih with the Owner in an endeavor to reach a mutually satisfactory' solution to such labor problem and. so far as reasonably possible, to protect the Owner against delays affecting the work or damace or losses to its other operations. Article 10. Contractor's Insurance The Contractor shall, for the mutual protection and benefit of both Owner and Contractor, procure, pay for and maintain in full force and effect, at all times during the performance of the work and until final acceptance of the work, policies of insurance issued by a responsible carrier or carriers acceptable to Owner which afford the following coverages: Workers' Compensation - Statutory Employers' Liability - Not less than $500,000 ASARCO ELP 0010831 Page 5 of 14 Comprehensive General Liability including Independent Contractors' Broad Form Con tractual, Broad Form Property Damage, Personal Injury, Completed Operations and Products coverages (such Completed Operations and Products coverages shall be provided for a period of two (2) years after final completion of the work and final acceptance by the Owner), and deletion of any exclusion pertaining to explosion, collapse, underground property damage, radiation and pollution hazards. Not less than S2.000,000 combined single limit for both bodily injury and property damage Comprehensive Automobile Liability' including Owned, Non-Owned. and Hired Car coverages. - Not less than S2.000.000 combined single limit for both bodily injury and property damage All policies, with the exception of Workers' Compensation and Contractor's Professional Liability, shall name Owner, its subsidiaries, directors, officers, agents and employees as additional insureds, and shall expressly provide that the interest of same therein shall not be affected by anv breach by Contractor of any policy provision. All policies shall expressly provide that no less than thirty (30) days prior written notice shall be given to Owner in the event of material alteration to or cancellation of the coverages evidenced by such policies. Further, the Workers' Compensation policy shall contain an endorsement waiving the insurers' right of subrogation against Owner, its subsidiaries, agents and affiliated companies, and their directors, officers, agents and employees. Prior to any equipment or personnel being brought onto Owner's premises in accordance with the terms of this Agreement. Contractor shall deliver to Owner a Certificate of Insurance for each policy obtained pursuant to this Agreement evidencing each of the provisions specified in this Article along with the signed Agreement. Upon renewal of each policy, Contractor shall provide to Owner a certificate of insurance evidencing all of the provisions specified in this Article. Contractor will maintain the original of all policies, endorsements and certificates, and provide Owner with copies of same upon request of Owner. ASARCO ELP 0010832 1 Page 6 of 14 Article 11. Indemnity bv Contractor Contractor agrees to defend at its own cost and to INDEMNIFY and HOLD HARMLESS the Owner and its agents and employees from any and all liability, damages, losses, claims and expenses howsoever caused resulting directly or indirectly from or connected with the performance of this agreement. Contractor's duty to indemnify Owner shall not apply to liability from damages arising out of bodily injury to persons or damages to the property caused by or resulting from the sole negligence of Owner, or Owner's agent or employees. Contractor's duty to indemnify Owner for liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of Owner or Owner's agents or employees shall apply only to the extent of negligence of Contractor or Contractor's agents, employees, and sub-tier subcontractors and suppliers. Contractor's indemnifications shall survive termination of the Contract. Article 12. Owner's Responsibility for Certain Casualties The Owner shall be responsible for all damage to the work, including all materials and equipment owned by Owner on or about the premises intended for permanent use in the project or incidental to the construction thereof and included in the total cost of the work. The Owner may during the process of the work, maintain and pay for property insurance to cover the work during construction with such deductible as it may at its sole discretion choose or Owner may at its sole option completely self-insure same. If the Contractor desires any other insurance, beyond that provide by Owner, to protect Contractor's temporary structures, materials, hand tools, machinery' and equipment, he may obtain and pay for same. Article 13. Status and Responsibility of Contractor and its Personnel It is understood and agreed that the status of the Contractor hereunder is that of an independent contractor, that the personnel of the Contractor performing services or work hereunder shall under no circumstances be deemed to be employees of the Owner, and that any Workers' Compensation Insurance coverage and all training required by law (including but not limited to applicable training requirements related to health and safety', and the environment) for such personnel will be the sole responsibility of the Contractor. Notwithstanding the aforesaid understanding, the general instructions of the Owner in connection with accomplishing the work to be done hereunder shall be followed by the personnel of the Contractor. ASARCO ELP 0010833 Page 7 of 14 During tenure of Contract. Owner shall have prerogative to request changes in personnel of Contractor's employees assigned to this work when in the opinion of the Owner their work is not conducive to required scope of work. Article 14. Compliance with Laws and Ordinances This Contract shall be performed in compliance with all applicable laws, ordinances, rules, regulations, standards and/or other governmental requirements including, but not limited to those of the federal Occupational Safety and Health Administration, the Mine Safety and Health Administration, the Environmental Protection Agency, the Department of Transportation, the Department of Labor, and all state, municipal and local governmental agencies. If the Contractor performs any work contrary to such laws, ordinances, rules, regulations, standards and/or other governmental requirements, Contractor shall bear all costs and expenses arising therefrom, includins all penalties, fines, awards, settlements and losses, including attorneys fees. If for any reason the Contractor's or any of its subcontractor's employees or agents acquire a status imposing liability on the Owner for employers' contributions or taxes under the Federal Insurance Contribution Act. the Federal Unemployment Tax Act, any State Unemployment Tax or Wage Protection Act, or any other Act, Statute or Regulation thereunder, the Contractor shall be exclusively liable for, and shall indemnify the Owner against, the same and agrees to comply with all such laws and regulations so as to relieve the Owner from any and all liability therefor and from the responsibility of making reports or keeping records with respect thereto. Article In. Equal Employment To the extent applicable to the contracting and/or subcontracting of services or work hereunder, the following provisions are incorporated by reference and Contractor represents that it will comply with them provided such services are utilized by Owner to fulfill obligations pursuant to a contract with the Federal Government or any Agency thereof: Equal Employment Opportunity: E.O. 11246 and 41 CFR Sec. 60-1.4 and 60.1-7: Employment of Veterans: 41 CFR Sec. 60-250 and Employment of Handicapped: 41 CFR Sec. 741-4, and all rules and regulations issued pursuant to the foregoing. Article 16. General Safety- Provisions a. Contractor shall designate a job site representative to be its safety supervisor and that person shallbe responsible for promoting safety and accident prevention, interest and compliance with applicable safety laws, rules and regulations among its employees and coordinating such activities with Owner and any subcontractors and suppliers of Contractor. b. Contractor shall convey in writing and orally to its employees that they must notify Contractor immediately of any safety concerns or problems they may have at the project regardless of whether such concerns or problems relate to any job site policy, law, rule, regulation or ASARCO ELP 0010834 Page 8 of 14 any physical condition of the project premises or any circumstances, or any actions or inactions of Owner or Contractor. Upon receipt of such notice involving any entity, Owner must be notified within twenty-four (24) hours, in writing, of the stated concern or problem and what corrective action has been taken and/or remains to be taken. c. Contractor shall comply with all laws, ordinances, codes, rules, regulations, standards and any safety policies instituted by Owner relative to the Project, relative to safety and the prevention of accidents. Contractor acknowledges that it has been provided with Owner's safety rules and training materials and agrees to institute and follow such rules and apply the training materials to the work performed under this Contract. d. Contractor shall take all reasonable precautions to ensure the safety and health of all persons working at the project and all persons who may in any way be affected by the Contract work. e. Contractor shall take all reasonable precautions to assure that it discovers, is made aware of and corrects any unsafe conditions, circumstances, actions or inactions that arise at the project and that directly or indirectly effect any of Contractor's personnel or the personnel of any other contractor or the Owner at the site. f. Contractor agrees to observe, comply with and enforce any and all provisions and requirements of the Occupational Safety and Health Act. and the Mine Safety and Health Act, including any and all amendments and supplements to and all standards, rules and regulations issued under these Acts, or similar or more stringent federal, state or local requirements, as are applicable to the performance of the Contract. Contractor shall promptly advise Owner of any investigation or inspection by any federal, state or local governmental agency representative of Contractor's workplace, provide copies of inspection reports, notices of violations, and inform Owner of the outcome of any such inspection or investigation in writing. g. Contractor shall immediately notify Owner (and provide a detailed written report) of every accident involving injury to personnel occurring in connection with the contract work and agrees to assist Owner with any accident investigation in which Contractor has any involvement, including access to and preservation of the work area and production of any and all of its documents and records and any employees who may have witnessed the accident. h.l) Contractor acknowledges and agrees that any training, safety equipment or monitoring that may be provided or performed by Owner for the Contractor or the Contractor's employees is strictly voluntary and done to enhance safety and health in the workplace. Any such actions by the Owner shall not change or diminish the Contractor's responsibilities in these areas. and h.2) Contractor agrees to provide Owner with its written safety program and certify annually that all required training has been completed in a timely manner pursuant to the applicable federal and state laws and regulations. ASARCO ELP 0010835 Paae 9 of 14 Article IT. General Environmental Provisions a. Contractor is responsible for proper management, storage'and disposal of all supplies and materials utilized in the work and waste materials generated in course of performance of the Contract pursuant to Owner's rules, and all applicable laws, ordinances, rules, regulations, standards and/or other governmental requirements including but not limited to those of the Occupational Safety and Health Administration, the Mine Safety and Health Administration, the Environmental Protection Agency, the Department of Transportation and all state, municipal and local governmental agencies, and the applicable fire codes, including but not limited to appropriate containers, labeis. warnings and placards, and secondary containment for materials containing hazardous substances or petroieum. b. Contractor may store supplies, materials, and wastes only in areas designated bv Owner. Contractor may not store any wastes on Owner's property in excess of ninety (90) davs. If Contractor utilizes any materials designated by federal, state or local law as a hazardous substance or a hazardous waste, such materials must be stored in appropriate containers and spill control equipment must be available in the storage areas. c. In the event of a fire, or a spill or release of hazardous materials or wastes on Owner's property. Contractor will take actions necessary to prevent harm to the environment and human health, and immediately notify- Owner's Environmental Department. Safety Department and the Security Office. d. Contractor is responsible for removing all supplies and materials utilized in the work and waste materials generated in the course of the performance of the Contract from Owner's property in accordance with ail applicable laws, ordinances, rules, regulations, standards and/or other governmental requirements. Contractor is responsible for all costs associated with off-site disDOsal of all hazardous and non-hazardous wastes. Contractor must inform the Owner's Environmental Department at least seven (7) days before any waste material is transported off-site for recycling or disDOsal. e. In the event that Contractor leaves any materials, supplies or wastes on Owner's property after completion of the work, said materials, supplies or wastes wiil be disposed of by Owner at Contractor's expense. f. Prior to commencement of the work. Contractor will provide Owner with a Material Safety Data Sheet for all materials and supplies to be utilized on Owner's property in the course of performance of the Contract. At Owner's discretion. Owner may require that Contractor utilize a substitute product that is less hazardous. g. Contractor is responsible for making all such Material Safety Data Sheets available to its own employees and those of its subcontractors pursuant to the Occupational Safety and Health Act. ASARCO ELP 0010836 I Page 10 of 14 h. Contractor may not bring any materials on to Owner's property nor utilize any products that contain the following substances: asbestos, chlorofluorocarbons (CFCs), chlorinated solvents, polychlorinated biphenyls (PCBs). Article 18. Patents The Contractor shall indemnify and save harmless the Owner against and from any and all claims, losses, costs, damages, expenses, actions or other proceedings, growing out of or resulting from infringement of any patent by the Contractor or any Subcontractor in the performance of this Contract, except that this provision shall not apply to patented articles or processes specified in drawings or specifications furnished by the Owner provided any such claim is not attributable to Contractor's negligence in the use of such patented articles or processes. This indemnity' shall survive termination of the Contract. Article 19. Changes in the Work The Owner, without invalidating this Contract, may at any time order extra work or make changes by altering, adding to or deducting from the work. Such order may be made by the Owner on its own behalf or at the request of the Contractor, upon discovery by the Contractor of any discrepancy between the plans and the physical conditions encountered. If such extra work or changes involve a change in cost, the contract price shall be increased or decreased by the fair value thereof. The Owner will itemize the changes to be made and upon receipt of written notice of same, the Contractor agrees to submit promptly to the Owner, in triplicate, an itemized statement of his calculations of the adjustment in the contract price resulting from the changes or extra work. This must be done before work on the change is begun unless the Owner gives written order to proceed immediately. No work or change shall be made, except by written order of the Owner and no claim for an addition to the contract price shall be valid unless the additional work was so ordered. Any dispute under this Article shall be subject to arbitration. Article 20, Owner's Right to Terminate Contract If any proceeding is instituted by or against Contractor seeking to adjudicate it a bankrupt or insolvent, or seeking liquidation, winding up, reorganization, arrangement, adjustment, protection, relief or composition of it or its debts under any law relating to bankruptcy, insolvency or reorganization or relief of debtors or seeking the entry of an order of relief or the appointment of a receiver, trustee or other similar official for it or any substantial part of its property, or if Contractor shall admit its inability or fails to pay its debts generally, or shall make a general assignment for the benefit of its creditors, or if the Contractor at any time should fail, refuse or neglect to supply enough properly skilled workmen or proper materials, or if he should fail to make prompt payments to Subcontractors or for material or labor, or disregard laws, ordinances or the instructions of the Owner, or otherwise be guilty of a substantial violation of any provision of this Contract which Contractor shall have failed to correct promptly after service of written notice thereof by the Owner, then the Owner may, without prejudice to any other right or remedy, terminate the employment of the ASARCO ELP 0010837 Page 11 of 14 Contractor for the Contractor's default and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method the Owner may deem expedient. In such case, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid balance of the contract price shall exceed all the general damages of the Owner caused bv the Contractor's default, including but not limited to any financial losses or expenses incurred or suffered by Owner as a result of a delay in the completion of the work and the expense of finishing the work and compensation of the Owner for the Owner's managerial and administrative services, such excess shall be paid to the Contractor. If such damages shall exceed such unpaid balance, the Contractor shall pay the difference promptly to the Owner. Article 21. Owner's Right to Terminate Contract without Cause Owner may at any time terminate Contractor's services under the Contract for any reason whatsoever by giving Contractor not less than fifteen (15) days written notice of termination setting forth the effective date of termination. In the event of such termination. Owner shall pay to Contractor (a) its reimbursable costs for services performed prior to the effective date of such termination, less payments previously paid by Owner on account thereof, (b) all other reimbursable costs and expenses which Contractor may incur as a result of such termination, including relocation of Contractor's field personnel and such other costs and expenses as may be approved by the Owner, and (c) an equitable portion of the profit based upon the actual work performed at the time of termination less any payment on account of profit which had been previously made. Except as may be otherwise expressly provided herein. Contractor shall not be entitled to demand any damages, compensation or indemnity of any kind as a consequence of such termination. Article 22. Correction of Work after Payment Neither payment nor any provision in this Contract shall relieve the Contractor of responsibility for faulty' materials or workmanship and the Contractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom which shall appear within one (1) year from the date of completion of the Contractor's work hereunder. The Owner shall give notice of observed defects w'ith reasonable promptness. Any dispute under this Article shall be subject to arbitration. Article 23. Arbitration If any controversy, claim, dispute or question shall arise between the parties in respect of the construction, meaning or effect of this Contract or anything contained in it, or the rights and liabilities of the parties hereunder or otherwise in relation to this Contract, then every such controversy, claim, dispute or question shall be decided by arbitration in accordance with the rules of the American Arbitration Association. This agreement so to arbitrate will be specifically enforceable under the prevailing law of any court having jurisdiction. Notice of demand for arbitration will be ASARCO ELP 0010838 Page 12 of 14 filed in writing with the other party and with the American Arbitration Association. The demand for arbitration will be made within a reasonable time after the controversy, claim, dispute or question has arisen, and in no event shall any such demand be made after the date when institution of legal or equitable proceedings based on such controversy, claim, dispute or question would be bamed by the applicable statute of limitations. An award rendered pursuant to arbitration will be final and judgment may be entered in any court having jurisdiction thereof. Article 24. Subcontractors and Suppliers The Contractor will not employ any subcontractor without the prior written approval of Owner and the Contractor agrees to be responsible for any failure by the subcontractor to comply with the terms and conditions of this Contract which are in any way applicable to such subcontractor. Nothing herein shall be deemed to create a contractual relationship between any such subcontractor and the Owner. All of Contractor's subcontractors and suppliers shall be apprised of the terms and conditions of this Contract and shall be held liable, accountable for and subject to these terms and conditions in their own subcontract work and supply contracts to the same extent and degree that the Contractor is or would be liable, accountable for and subject to these terms and conditions in its contract wfork. It shall be the Contractor's duty to ensure that its subcontractors and suppliers accept and comply with the terms and conditions of this Contract and Contractor shall supply to the Owner evidence of such compliance in a form acceptable to Owner. Article 25. Assignment The Contractor shall not assign nor subcontract this Contract in whole or in pan, nor shall the Contractor assign any monies due or to become due Contractor hereunder without the prior wTitten consent of the Owner. Article 26. Coordination of Work The Contractor shall conduct the work hereunder so as to cause a minimum of interference with the Owner's operation. Where interference with the Owner's operations becomes absolutely necessary, permission shall be requested by the Contractor not less than seventy-two (72) hours in advance. Article 27. Undertakings bv the Owner The Owner agrees to obtain and pay for any permits, licenses and easements required for permanent structures or changes, and, to the extent practicable without interference with operations, to furnish the Contractor, free of charge, for its use during the construction, electricity, water, steam and compressed air required for construction purposes, at the voltage and pressure currently available at ASARCO ELP 0010839 Page 13 of 14 Owner's said plant, to a point adjacent to or within 100 feet of the site, but the Contractor will be required to make the necessary connections, provide approved shut-off and safety devices and furnish and install all temporary lines required to bring them to the point of use. Article 28. Applicable Law. This contract shall be construed and enforced in accordance with the laws of the state where the work hereunder is to be performed. Article 29. Technical Information The term "technical information" as used in this Contract includes but is not limited to technical data, repons, models, drawings, specifications, operating manuals, designs, computations, formulas, apparatus, processes, patentable or unpatentable inventions and other engineering data. Contracror agrees to accept Owner's decisions as to whether any particular information is technical information or is technical information which has been made or conceived under this Contract. It is understood that in the course of Contractor's performance hereunder Contractor may learn or have access to technical information of Owner. Contractor agrees that it and its personnel will keep in confidence all such technical information of Owner and that it and its personnel will not use or disclose the same without Owner's written consent, either during the term of this Contract or at any time thereafter. Contractor agrees to disclose to Owner all technical information made or conceived by it or its personnel in performance, or resulting from performance, under this Contract. Contractor agrees that all such technical information made or conceived by it or its personnel shall become and remain the free and unrestricted property of Owner and that Contractor shall assign or cause the same to be assigned to Owner. Contractor agrees that it and its personnel will keep in confidence all such technical information made or conceived by Contractor or its personnel and that Contractor and its personnel will not use or disclose the same without Owner's written consent, either during the term of this Contract or at any time thereafter. Contractor agrees, upon the request and at the expense of Owner, to make or cause its personnel to make applications for Letters Patent in such countries as Owner may designate on those of the aforesaid assigned inventions which Owner believes to be patentable; and to assign all such applications to Owner or its order; and to give Owner, its attorneys and solicitors all reasonable assistance in preparing such applications, and in prosecuting such applications in the patent office or offices involved and in defending and enforcing any patent that may be issued upon any such application; and to execute all papers that may be reasonably required in the prosecution of such applications or to vest in Owner or its assigns said inventions, applications and Letters Patent. Article 30. Force Majeure ASARCO ELP 0010840 Page 14 of 14 Neither party shall be considered in default in the performance of its obligations hereunder to the extent that performance of such obligations is delayed, hindered, or prevented by force majeure. Force majeure shall be any cause beyond the control of the parties hereto which they cannot reasonably have foreseen and guarded against. Force majeure includes but is not limited to, acts of God, labor disputes, financial crisis, fires, riots, civil commotions or civil unrest, incendiarism, interference by civil or governmental authorities, and acts of war (declared or undeclared). Article 31. Entirety Clause This Contract constitutes the entire agreement between the parties, and except as may be specifically set forth herein no changes can be made herein except by an agreement in writing duly executed by the parties or their duly authorized agents. Article 32. Additional Provisions (Add such additional provisions, if any. as the particular job requires.) IN WITNESS WTIEREOF, the parties have executed this Contract the day and year first above written. Contractor By _________________ Title_________________ ASARCO Incorporated Owner By _________________ Title ASARCO ELP 0010841 SUPPLEMENTARY CONDITIONS TO THE CONTRACT 1.01 All protective equipment required for all employees and Owner's representative the IH and any authorized visitors shall be provided by the Contractor. 1.02 Contractor shall submit construction, proposed completion, and proposed work schedule to the IH at the pre-construction meeting. 1.03 Contractor shall post competent person at entrance to regulated area at all times during working hours. After working hours and when regulated area has been established Contractor shall post security guard at entrance to regulated area. The primary duty of person at entrance to regulated area is to prevent anyone from entering regulated area without wearing proper protective equipment and otherwise complying with all applicable requirements in this Project Manual. 1.04 Contractor hereby agrees to indemnify and hold Sun City Analytical and City of El Paso free and harmless from any obligations, costs, claims, judgments, attorneys' fees, and attachments arising from or growing out of this any damage to property or injury' or death to persons (including any damage or injury caused to property or person of any party including any employee of Contractor and/or associated with companies and/or any third party) arising from or growing out of the performance of these services under this Contract, except when the same are caused by the willful misconduct or negligence of the Consultant. 1.05 Conflicts and questions arising throughout any asbestos abatement activities will be resolved on a basis of whether an asbestos or non-asbestos related activity is involved. Any asbestos related conflicts and questions will be governed by the appropriate project manual sections. Otherwise, the Owner's supplementary and/or up-front "boiler plate" documents and any other non-asbestos related sections of the project manual will be applicable. 1.06 .As the representative of the Owner the IH shall perform air monitoring of all areas of work to insure compliance with this Project Manual and all applicable asbestos laws. This air monitoring does not relieve the contractor from monitoring required for compliance with all applicable asbestos laws. IH has the right to take action or direct Contractor to take whatever means deemed necessary to protect the environment, persons in the work area, and the general public when his air monitoring results indicate non compliance airborne concentrations of Asbestos fiber levels established by this Project Manual or applicable asbestos laws. IH shall retain at site daily air monitoring results for Contractor, Contractor employees, on regulatory agency to view at their discretion. In the event of any job-related injury, requirements of first aid or accident the IH shall be notified and Contractor shall take appropriate action. 1.07 When Contractor Crew consist of personnel whose predominant language is not English Contractor shall insure: A. All training respiratory, supervisor, worker, etc., is conducted in predominant language. Sun City Analytical. Inc. (c)copynght 1997 6 ASARCO.lnc, Q Paso Power House Basonoxt Abatement ASARCO ELP 0010842 Contractor shall submit proof of all documents and proof that workers passed appropriate test. B. All instructions and safety procedures and emergency instructions shall be posted in both English and Spanish. Contractor shall have an interpreter fluent in English and dominant language for communications between IH and workers. C. All workers shall be under direct supervision of fluent interpreters especially in the regulated area. 1.08 The following airborne fiber levels have been established for IH to use as grounds for stoppage of abatement work or and/or ordering immediate clean up of all area A. When air samples reveal 0.20 F/CC in containment IH may warn Contractor of high levels and may stop work if he continues to exceed 0.20 F/CC in containment. B. When air samples reveal 0.01 F/Cl inside clean room or during load-out IH shall stop work and insure proper clean-up procedures are used. C. Any time air samples reveal air levels of greater than 0.01 F/CC outside regulated area, work must stop until corrective action is taken. 1.09 Contractor shall complete project in accordance with dates set forth in Project Schedule included in this project manual. If bidder fails to finish project in said dates, he is liable to ASARCO. Inc. or have deducted from funds owed, as liquidated damages the sum of four-hundred seventy five (S475.00) dollars per day for Consultant and/or Air monitoring costs per day for each calendar day of delay until the project is substantially completed. Sun City Analytical, Inc. (c)copynght 1997 7 ASARCO.Inc. El Paso Power Boose Basanod Abatement ASARCO ELP 001084-3 I BID FORM (Company Name) Submits following proposal for: ASBESTOS .ABATEMENT AT ASARCO, Inc. P.O. Box 1111 El Paso. Texas 79999 By signing and submitting this form, the Bidder is attesting to a site visit of said location, in order to became familiar with conditions affecting the work. Successful Bidder agrees to furnish all labor, materials, equipment, and pay any expenses incurred (travel, per diem, etc.) to complete work in total compliance with Contract Documents such as but not limited to. Plans. Specifications. Invitation to Bidders, and any addenda issued thereto. The successful Bidder agrees to complete project with conditions set forth in contract documents. Plans and Specifications and time schedule set forth in the Project Schedule in this specification, furthermore successful Bidder understands that five hundred dollars (S500.00) per day plus Industrial Hygienist and/or air monitoring costs will be the measure of liquidated damages assessed for each calendar day in excess thereof required to complete the work under this contract. Bidder agrees to execute a Formal Contract on ALA Document A101-1987 (Standard Form of Agreement between Owner and Contractor) within three (3) working days for date of notification of Award. Bidder agrees to furnish within five (5) working days from notice to proceed, all required insurance policies covering public and property damage, asbestos occurrence liability, and workman's compensation in the amounts specified in the supplementary conditions of the project. Successful Bidder shall furnish performance and payment bonds equal to the amounts of the Contract within (5) working days were applicable. Bidder further agrees that he understands the exact scope of the project and that he is willing to perform any increase or decrease in the work in accordance with set provisions of these contract documents. Bidder furthermore guarantees that he has become familiar with local conditions, local laws and ordinances, local permits, and rules that may in any manner affect cost, progress or performance of this contract. Owner reserves the right to refuse any and all Bidders for any reason that serves the best interest of the Owner or building Occupants. Owner reserves the right to waive any technicality or irregularity in the project plans and/or Bidder documentation. Bidder understands that to be considered a successful Bidder, he must include with the Bid Proposal all submittals required below. Failure to submit required documents and submittals shall be basis to Sun City Analytical, Inc. (c)copynght 1997 g ASARCO,Inc. Q Paso Power Hoist AbaLaaat ASARCO ELP 0010844 disqualify Bidder at bid opening. Disqualified Bidder shall be considered non-responsive and his bid shall not be recorded. This contract will not be awarded solely on lowest bid consideration, the submittal package and the unit prices shall be evaluated for the best responsive bidder. A. Proof of Asbestos Abatement experience: 1. Documentation of at least 3 years experience using OSHA. EPA 763 AHERA regulations (letters of recommendation will be accepted). 2. Name of contact person on at least one on going abatement project. 3. Notarized statement that offerer's firm or company performing work for the past three (3) years has not received any notice of violation regarding compliance with any applicable asbestos law. If notice of violation has been received by the offerer, circumstances involved should be described in the notarized letter for consideration by the Owner and its Consultant. B. Proof of personnel qualifications, training and experience: 1. Submit Texas State Contractor License to be able to do asbestos abatement work in Texas. 2. Submit name of supervisor to be used on project. Submit his current medical. EPA approved supervisor training certificate, and Texas State License. 3. Submit name of every worker to be used on project. Submit his current medical. EPA approved worker training certificate, and Texas State License. BID ITEM 1: Remove Ah asbestos containing THERMO Insulation from AREA-1 identified on the plans and specifications (please refer to drawing AA1). Price includes all work specified in the plans, specifications and any addendum. _____________________ Dollars S BID ITEM 2: BID ITEM 3: Remove Ah asbestos containing THERMO Insulation from AREA-2 identified on the plans and specifications (please refer to drawing AA1). Price includes all w'ork specified in the plans, specifications and any addendum. _____________________________ Dollars S Remove All asbestos containing THERMO Insulation from AREA-3 identified on the plans and specifications (please refer to drawing AA1). Price includes all work specified in the plans, specifications and any addendum. _________________ ______________________ Dollars S Sun City Analytical, Inc. (c)copyright 1997 9 ASARCO.Ioc. Q Paso Power Hotse Basement Abataaaa ASARCO ELP 0010845 UNIT PRICES: Additive/Deductive Unit Prices for work described on the specifications forAsbestos Abatement at ASARCO Power House Basement. If a Deductive price varies from the Additive price than Contractor shall state so. BIDDER must submit unit prices. These unit prices shall be used to calculate any additions or deletions to this contract and will be used to make the final determination on the successful bidder. ACM THERMO removal Full Containment ACM Tank Removal ACM THERMO removal glovebag procedure S S S Der LF Der SF per EA Dollars per LF Dollars per SF Dollars per EA Respectfully submitted: (Ftrm Name) Bv (.Authorized Signature) Firm's Address: (Title) Seal Phone () Sun City Analytical, Inc. (c)copvnght 1997 10 ASARCO, Inc. El Paso Power Boose Baseman Abatement ASARCO ELP 0010846 ACTIVITY Advertisement Pre-bid walk-thru Bids Due Bids Open Contract Award Pre-Construction Begin Project Project Complete Final Acceptance PROJECT SCHEDULE ASARCO Power House Basement DATE AND TIME BY INVITATION ONLY Oct 28th. 1997 1000 HOURS Nov 4th 1997 1430 HOURS Nov 4th 1997 1430 HOURS TBA TBA Nov 07. 1997 0800 HOURS Nov 18, 1997 1600 HOURS TBA TBA LOCATION BY INVITATION ONLY ASARCO. Inc. 2301 Paisano El Paso Texas Sun City .Analytical. Inc. 1409 Vlontana El Paso. Texas 79902 Sun City Analytical. Inc. 1409* Montana E! Paso. Texas 79902 TBA ASARCO. Inc. 2301 Paisano El Paso. Texas ASARCO. Inc. 2301 Paisano El Paso. Texas ASARCO. Inc. 2301 Paisano El Paso. Texas ASARCO. Inc. 2301 Paisano El Paso, Texas TBA = To Be Announced Sun City Analytical, Inc. (c)copynght 1997 11 ASARCO, Iac. Paso Power Boose Easement Abaianatt ASARCO ELP 0010847 SECTION 01010 SUMMARY OF WORK PART I - GENERAL 1.01 Statement of Work: The work consists of furnishing all labor, plant, and materials and performing all work in strict accordance with this plan. Work shall include but not be limited to: preparation, removal of ACM pipe and future insulation, tank insulation, flue insulation, debris, (using full containment or glovebag procedures) and all OSHA. EPA air monitoring and air sampling. 1.02 Project Objectives: A. Remove All asbestos containing materials from area described in Scope of Work. Drawings, and this Project Manual. B. No individual shall be exposed to asbestos fibers in excess of levels shown in these specifications. C. The Contractor shall insure that no asbestos contamination occurs outside any containment erected. D. The Contractor shall insure that all asbestos waste is disposed of in accordance to these specification and all applicable laws. All construction waste contaminated with asbestos containing waste from this project shall be disposed of in an EPA approved landfill. E. The Contractor shall document all activities pertaining to this project in accordance with these specifications and all applicable laws. At the conclusion of the project, contractor shall submit this documentation to the Owner alter it has been reviewed by the Industrial Hygienist (IH). F. The Contractor shall insure that all special precautions, as stated in these documents, have been taken to protect electrical motor control centers and other electrical equipment. 1.03 Scope of Work: A. Remove asbestos from the areas shown at the pre-bid conference, in the drawings, and in the specifications and addenda. Bidder must field verify types, location, quantities, and access to ACM and any other special or unusual circumstances during the mandatory' pre-bid conference. Bidder shall be responsible to base its bid upon actual types, quantities and conditions present at the project site. B. The purpose of this project is to completely remove all specified asbestos materials from the areas shown on the drawings, specifications, addenda and pre-bid conference. 1. AREA 1 ABATEMENT a. Remove and dispose of approximately 1.050 If. of pipe insulation. b. Remove and dispose of 125 ea pipe fittings, valves, hangers, etc. This pipe fittings, hangers and valve range in various sizes from 4 inches to 18 inches. c. Remove and dispose of ACM debris below equipment and pipe systems. Sun City Analytical, Inc. (c)copynght 1997 12 ASARCO.Inc. Q Paso Power Hoosc Basement Abatement ASARCO ELP 0010848 AREA 2 ABATEMENT a. Remove and dispose of approximately 1,595 If. of pipe insulation. b. Remove and dispose of 380 ea pipe fittings, valves, hangers, etc. This pipe fittings, hangers and valve range in various sizes from 4 inches to 18 inches. r c. Remove and dispose of ACM debris below equipment and pipe systems. 3. AREA 3 ABATEMENT a. Remove and dispose of approximately 18 If. of pipe insulation. b. Remove and dispose of 105 ea pipe fittings, valves, hangers, etc. This pipe fittings, hangers and valve range in various sizes from 4 inches to 18 inches. c. Remove and dispose of ACM debris below equipment and pipe systems. END OF THIS SECTION Sun City Analytical. Inc. (c)copynght 1997 13 ASARCO.lnc. H Paso Power House Basement Abatcmm ASARCO ELP 0010849 SECTION 01030 SPECIAL PROCEDURES OR CONDITIONS The ASARCO Power House A. Before beginning abatement the Contractor shall do the following: 1. Insure that all high voltage is turned off and locked out with appropriate safety tags. 2. Ail electrical facilities will be covered with 6 mil polyethylene. 3. Obtain written approval from the Building Owner representative before beginning work. 4. Minimum respiratory protection necessary for all asbestos removal at this project site shall be .APR equipped with dual cartridge HEPA and ACID MIST Filters. See Section 01560. 1.01 Cl. Schedule of abatement A. The Contractor shall schedule all work to be done between the hours of 7:00 A.M. and 4:00 P.M. Monday through Friday. Contractor shall begin asbestos abatement on Friday November 7, 1997 and be comoicted by November 18, 1997. Site Security A. The Contractor shall provide a qualified site security' during all the abatement phase. The intent of this precaution is to guard against unauthorized entry into the regulated areas as well as a fire watch. 1. Site Security shall have EPA certification to enter the containment 2. Site Security shall have an OSHA physical. 3. Site Security shall have communication equipment to notify the IH. contractor, fire and or police if the need arises. 4. Site Security shall have a stale license to do asbestos work. B. Site security personnel shall ensure that air filtration equipment is operational at all times, shall restrict unauthorized entry into the regulated area and ensure that the containment is intact at all times. Site security personnel shall keep a daily log of all events. Emergency Repairs A. The Contractor shall immediately notify' the IH of any damages, repair any pipe leaks, or electrical failures that might occur during abatement. B. AH personnel on job site shall know where a telephone is located and what the emergency phone number are. C. Emergency phone numbers shall not be limited to but shall include the Industrial Hygienist (IH), Project Manager, Contractor, Etc). All emergency phone numbers shall be posted at the control center. Medical Emergencies A. The Contractor shall provide at least one person on site who is qualified in First Aid and Cardiac Pulmonary Resuscitation (CPR). The contractor shall submit this persons name and qualification to the IH at the pre construction meeting. Sun Cits' Analytical, Inc. (c)copyTight 1997 14 ASARCO, Inc. El Paso Powtx Boose Basement Abatement ASARCO ELP 0010850 I 1.06 Rental Equipment A. The Contractor shall obtain written permission for any rental equipment (includes rental trucks or vehicles) to be used on the asbestos project. The rental company shall be notified of the intended use of equipment and shall submit notice to the Industrial Hygienist (IH) that the equipment may be used on this asbestos abatement project. The Industrial Hygienist (IH) has the right to reject any rental equipment that does not confirm with said letter of understanding. The Contractor assumes all liability for failure to disclose the use of rental equipment for an asbestos abatement project. 1.07 Patented Products A. The Contractor shall submit a license or equivalent, or written permission to use any patented product and/or procedure in connection with this project. In the event that no patented product and/or procedure is used, the contractor shall submit a notarized statement acknowledging that he is not using patented products or procedures on this project. The contractor assumes all liabilities for failure to disclose the use of a patented product and/or procedure. 1.08 Electrical Work BEFORE ANY ELECTRICAL WORK IS PERFORMED ON .ASARCO PROPERTY'. THE CONTRACTOR SHALL OBTAIN WRITTEN PERMISSION FROM THE ASARCO POWER HOUSE SUPERVISORY PERSONNEL. A. .All of the electrical work shall be performed by either a licensed electrician or a licensed apprentice eiectrician under direct supervision of a licensed electrician. All electrical work shall meet electrical code requirements. B. Any electrical work performed in the regulated area shall be done by a licensed electrician who has met the requirements of OSHA 1926.58. AHERA 40 CFR 763 (24 hour worker Course), OSHA medical exam, respirator lit test and any license required by any Local, State or Federal Asbestos Law. 1.09 Special Garments and Training A. Before any contractor personnel are allowed on .ASARCO property they are required to attend a safetyorientation course provided by the ASARCO safety personnel at no cost to the contractor. To schedule this course, contractor shall contact Ms. Peggy Munsell at (915) 521-3640. B. .All contractor personnel are required to wear long sleeve shirts, boots, hard hat. safety eye wear, hearing protection and a half face respirator with dual HEPA and Acid gas filters. ASARCO will not provide this equipment. Any personnel not complying with this policy shall be barred from entering the premises. 1.10 Noise Hazard A. ASARCO, Inc. has designated the Power House as a high noise area. This project involves working around this high noise area. Contractor shall, at no cost to its employees, provide hearing protection throughout the duration of this project. B. The owners representative has the authority to enforce this hearing protection program. Sun City .Analytical, Inc. (c)copynghr 1997 15 ASARCO,Inc. El Paso Power Hoose Basement Abatement ASARCO ELP 0010851 I 1.11 High Heat and Steam Line Hazard A. The project involves working around high pressure steam lines with super heated steam. Contractor shall insure that all personnel are made aware of the dangers of working with high pressure steam and super heated pipes. The areas were the contractor are working will be shut off. however there are other piping systems still active inside the working areas. Contractor shall tag this pipes and insure that all employees do not disturb these pipes. END OF SECTION Sun City Analytical, Inc. (c)copynght 1997 16 ASARCO.Inc. El Paso Power House Basement Abatement ASARCO ELP 0010852 SECTION 01043 PROJECT COORDINATION Work Requirements: A. The contractor shall schedule his work-hours to accomplish the abatement as specified in this project manual, drawing and any addenda. Contractor shall not perform any work on days other than those specified working days without the written permission of the owner. B. Before starting work at any location the Contractor shall inform the Owner and his representative the Industrial Hygienist (IH) or his authorized representative of the intent to start such work. Strict adherence with NESHAPS 10 day notice is required. C. Before beginning any work under the contract the Contractor shall provide in writing to the Owner and the IH the name of the person assigned as project superintendent. If a different person is assigned during the performance period, written notification and all documentation required under these specifications -.hail be provided to the IH before the new person assumes responsibility as project superintendent. D. Working Conditions: 1. The contractor shall visit the site to thoroughly familiarize himself with all the details of the work and the existing conditions, and to verify all dimensions in the field. The Contractor shall notin' the IH. in writing, when a discrepancy is found in the contract drawings, specifications, and/or field conditions. 2. The contractor will not be compensated for any unauthorized work. 3. The contractor shall maintain the interior and exterior of the building clean of anv and ail debris that result from the performance of this project. 4. The contractor shall insure safe working conditions and abide by all applicable OSHA safety regulations during the performance of the contract with the occupants in the building. 5. The Industrial Hygienist (IH) on site does not have the authority to approve any additional work or change the scope of work set forth in these documents. Contractor shall not be paid for any unauthorized work. For any additional work or change of scope of work the Contractor shall follow the directions for addition work set forth in these documents. Personnel Qualifications: A. All work performed under this SECTION shall be done by a Contractor specialized in the removal of asbestos and must meet, but not be limited to, the following: 1. Experience using Occupational Safety and Health Administration (OSHA), and/or Environmental Protection Agency (EPA) recommended asbestos removal methods. 2. Shall not have previous history, during the last three years of abatement projects started and completed by the Contractor, of any "Serious" (OSHA) fmes and/or notices of violation regarding compliance with asbestos removal procedures by any State, Local, or Federal Agency. 3. Shall have, as a minimum, a project manager and/or foreman having a working knowledge and three years experience in asbestos related projects. This shall include but not be limited to meeting requirements of 1.03 B. of this section. 4. Contractor shall be licensed to do work in the State of Texas. Sun City Analytical, Inc. (c)copyright 1997 17 ASAKCO.Ine. El Paso Power House Basonan Abatement ASARCO ELP 0010853 B. Supervisor Qualifications are as follows: 1. Meet requirements of OSHA competent person. 2. Must have knowledge of methods and procedures of the removal, treatment, handling, and disposal of asbestos and asbestos containing materials and subsequent cleaning of affected environment. 3. This person shall be knowledgeable of Federal, State and Local regulations pertaining to the handling of asbestos. 4. This person shall remain on the job site during working hours at all times. In the event Supervisor leaves job site, the IH has an obligation to stop work until Supervisor returns to site. Any and all extra cost arising from said event shall be the responsibility of the Contractor. 5. Persons shall have current OSHA Medical & EPA approved Supervisors Certificates. 6. Shall have a Texas State License to work as a supervisor. C. Worker Requirements: 1. Meet requirements of OSHA (1926.1101). 2. Must have knowledge of methods and procedures of the removal, treatment, handling, and disposal of asbestos and asbestos containing materials and subsequent cleaning of affected environment. 3. This person shall be knowledgeable of Federal. State and Local regulations pertaining to the handling of friable asbestos. 4. Workers shall have current OSHA Medical Jc EPA approved 24 hour Abatement Worker Certificates. 5. All workers shall have Slate License to do work as an Abatement Worker. Permits: A. The contractor shall obtain all necessary permits from the City Building Inspection Department. Police. Fire Department and any other Agencies having Jurisdiction prior to commencement of work. Some permits required are. but not limited to: 1. Electrical Permits where new or reinstalled electrical devices are performed. 2. Building Permits where any structure of the building is disturbed. This includes removal of asbestos pipe insulation. 3. EPA NESHAPS 10 day notice 4. Texas State Health Department Notice 5. Local permits such as fire, police etc. END OF THIS SECTION Sun City Analytical. Inc. (c)copynght 1997 18 ASARCO.lnc. H Paso Power Boose Basanoot Abatnnmt ASARCO ELP 0010854 SECTION 01091 DEFINITIONS AND STANDARDS 1.01 Applicable Publications: A. The regulations listed below form a part of this specification to the extent referenced. The regulations are referred to in the text by basic designation only. The following regulations shall be on site during all operations of this project. B. OSHA Regulations: 1. 29 CFR 1910.20 Access to Employee Exposure and Medical Records 2. 29 CFR 1910.134 Respiratory Protection 3. 29 CFR 1910.1001 OSHA - Asbestos Industry Standard. 4. 29 CFR 1926.1101 Asbestos. Tremolite. Anthophyllite, and Actinolite Construction Standard. 5. 29 CFR Parts 1910 and 1926 Occupational Exposure to Asbestos, Tremolite. Anthophyllite. and Actinolite: Final Rules: Amendment ii. 29 CFR 1910.1200 Hazard Communications 7. 29 CFR 1910 Occupational Safety and Health Standards 8. 29 CFR 1926.55 Gases. Vapors, Fumes. Dusts and Mists 9. 29 CFR 1926.57 Ventilation 10. All applicable OSHA regulations such as but not limited to Heat Stress, Noise, Electrical Standards (Lockout and Tagout} Scaffolding, Ladders, OSHA 200, Slips. Trips, and Falls, and Fire SafetyContingency Plans. C. Environmental Protection Acencv 1. 40 CFR 61 Subparts A & M (Revised Subpart B) National Emission Standards for Hazardous Air Pollutants. 2. 40 CFR Part 763, Subpart E Asbestos Containing Material in Schools;Find Rules and Notice. 3. 40 CFR Part 763, Subpart G Asbestos Abatement Projects; WorkerProtection; Final Rule. 4. Environmental Protection Agency (EPA) Publication, Guidance for Controlling Friable AsbestosContaining Materials in Buildings, June 1985. D. Department of Transportation (DOT): 1. 49 CFR Part 173, Subpart J. Sun City Analytical, Inc. (c)copyn&ht 1997 19 ASARCO.Inc. H Paso Power House Basement Ahalrmcnt ASARCO ELP 0010855 2. 49 CFR 172 Hazardous Materials Tables & Communications Regulations 3. 49 CFR 17S Shipping Container Specification E. American National Standards Institute. Inc., (ANSI), Standards: 1. ANSI Z88.2-1980 Practices for Respiratory Protection 2. ANSI Z9.2-1979 Fundamentals Governing Design &. Operation of Local Exhaust Systems F. Testing Standards 1. NIOSH Method 7082 Lead 2. NIOSH Method 7400 Fiber Analysis of Asbestos using PCM 3. NIOSH Method 7402 Fiber .Analysis of Asbestos using TEM 1.02 Definitions: A. Abatement - Means all activities associated with the control of Asbestos containing materials for Buildings during removai. B. ACGIH - American Conference of Governmental Industrial Hygienists 6500 Glenwav Avenue Building D-5 Cincinnati. Ohio -*5211 C. AIHA - American Industrial Hygiene Association. 345 White Pond Dr. Akron, Ohio 44320 D. Aggressive Air Sampling - Means using extreme efforts to simulate actual building conditions. Occupancy characteristics by causing air circulation patterns with equipment such as fans or leaf blowers. E. Airlock A system for permitting ingress and egress with minimum air movement between a contaminated area and an uncontaminated area, typically consisting of two curtained doorways separated by a distance of at least 3 feet such that one passes through one doorway into the airlock, allowing the doorwav sheetine to overlap and close off the opening before proceeding through the second doorway, thereby preventine now- through contamination. F. Air Monitoring - Means the process of collecting air samples on a Fiber membrane cassette and then havine them analyzed to determine the number of fibers present. Analytical results are expressed in terms of fibers per cubic centimeter of air. G. Air Monitoring Professional - A specially trained individual, who has successfully completed a NIOSH 5S2 Training Course, employed by the Owner, who is qualified by education and/or experience to obtain and test air samples in and around the work areas to determine airborne concentrations of asbestos fibers. H. Amended Water - Water to which surfactant has been added. Surfactant should be 50% polyoxyethylene ester and 50% polyethylene ether according to EPA recommendations. I. A.N.S.I. - American National Standards Institute, 1430 Broadway, New York, New York 10018. J. Asbestos - means a mineral that readily separates into long flexible fibers suitable for use as a Suo City Analytical. Inc. (c)copvnght 1997 vQ ASARCO.Inc. Q Paso Poorer Hoosc itwt,w Abattnneot ASARCO ELP 0010856 noncombustible, nonconducting or chemically resistant material. Asbestiforms include chrysotile, amosite, crocidolite, tremolite, anthophyUile, and actinolite. K. Asbestos Containing Material (ACM) - Material composed of asbestos of any type and in an amount greater than 1% by weight, either alone or mixed with other fibrous or non-fibrous materials. L. Asbestos Containing Waste Material - Asbestos containing material or asbestos contaminated objects requiring disposal. M. Asbestos Fibers - Means asbestos fibers longer than 5 micrometers. N. Asbestos Project Manager - An individual designated as the Owner's representative and responsible for overseeing the asbestos abatement project. O. Asbestos Worker - Means employees that meet all the requirements outlined in OSHA Regulations 29 CFR 1926.58. P. ASTM - American Society For Testing and Materials. 1916 Race Street, Philadelphia. PA 19103. Q. Authorized Visitor - The Building Owner [and any designated representatives] and any representativeof a reauiatory or other agency having jurisdiction over the project. R. Bidder - Each prospective Contractor who bids on the work specified herein, and has been pre-qualilied by Sun City Analytical.Inc. S. Building Owner - Owner of the building or his representative. T. Bulk Sample - The collection of any building material section suspected of containing asbestos. A small portion of suspected material is removed from sample area and placed in a plastic bag or air tight container. U. C1H- An Industrial Hygienist who by virtue of their education and passing the American Board of Industrial Hygiene Core Examination in either the Comprehensive Practice or an Aspect Examination has been given the right to use CIH by AIHA. ' V. Clean Room - An uncontaminated area or room which is a part of the worker decontamination enclosure system with provisions for storage of worker's street clothes and clean protective equipment. W. Clean Air Sample - Means air sample collected immediately following the completion of corrected action. These samples are routinely collected to determine the effectiveness of the corrected action and establish the contractual requirements of acceptable fiber concentrations levels prior to breaking down of abatement control area. X. Containment - When used in this specifications means the same as regulated area, shrouding, bubble, temporary enclosure, or controlled area. The means of using plastic to establish work areas and using air filtration pressure to prevent fiber contamination of building and occupants. Y. Contractor - Means any contractor that has been pre-approved by ASARCO and Sun City Analytical. Inc. Z. Control Center - Means the area in close proximity of the entrance to the regulated area where the supervisor or outside man is stationed. This center should be where all documentation required by specifications are, along with emergency numbers and first-aid kits, are available. Sun City Analytical, tnc. (c)copynght 1997 21 ASARCO,Inc. El Paso Pmnr Hoosc Basement Ahatonoit ASARCO ELP 0010857 AA CSP - A Safety Professional who by virtue of their education and passing the Board of Certified Safety Professionals Core Examination has been given the right to use CSP by BCSP. AB. Curtained Doorway - Means a device to allow ingress or egress from one room to another while permitting minimal air movement between the rooms, typically constructed by placing two overlapping sheets of plastic over an existing or temporarily framed doorway, securing each along the top of the doorway, securing the vertical edge of one sheet along one vertical side of the door and along the opposite vertical side of the doorway. Other effective designs are permissible. AC. Designated Decontamination Area - Means an area designated by the Industrial Hygienist (IH). The area is used for the purpose of decontaminating asbestos contaminated objects and shall be located adjacent to the work area and meet Industrial Hygienist (IH) approval. .AD. Designated Clean Area - Means an area designated by Industrial Hygienist (IH). The area is within site of the work area free of any asbestos for the purpose of storing decontaminated objects. AE. Designated Holding Area - Means an enclosed area designated by Industrial Hygienist (IH). The enclosure is used for the storing of sealed containers of asbestos containing materials and asbestos contaminated waste. AF. Decontaminate - Means to remove all visible asbestos dust from the surface to be decontaminated by the means of damp cleaning and/or vacuuming with HEPA filtration equipment. AG. Encapsulant - A liquid material which can be applied to asbestos containing material which controls the possible release of asbestos libers from the material either by creating a membrane over the surface (bridging encapsulant) or by penetrating into the material and binding its components together (penetrating encapsulant). AH. Enclosure - The construction of an air-tight, impermeable, permanent barrier around asbestos containing material to control the release of asbestos fibers into the air. AI. EPA - U.S. Environmental Protection Agency 401 M Street S.W.. Washington. D.C. 20460 AJ. Equipment Decontamination Enclosure System - Means that a portion of a decontamination enclosure system designed for controlled transfer of materials and equipment into or out of the work area, typically consisting of a washroom and holding area. AK. Equipment Room - A contaminated area or room which is part of the worker decontamination enclosure system with provisions for storage of contaminated clothing and equipment. AL. Filtered Exhaust System - A portable exhaust system equipped with HEPA filtration and capable of maintaining a constant low velocity air flow through contaminated areas from adjacent uncontaminated areas and maintaining a lower pressure in the containment area as compared to the adjacent uncontaminated areas. AM. Fixed Object - A piece of equipment or furniture in the work area which cannot be removed from the work area. AN. Friable Asbestos - Asbestos containing material which can be crumbled to dust, when dry, under hand pressure. AO. HEPA Filter - Means High Efficiency Particulate Air Filter that is capable of trapping and retaining at least ... Sun City Analytical, Inc. (c)copvnght 1997 22 ASARCO.Inc. El Paso Power Boose Baseman Abatement ASARCO ELP 0010858 99.97 percent of all mono-dispersed particles of 0.3 micro meters in diameter or larger. AP. HEPA Vacuum - Means a special type of vacuum cleaner used in the abatement project that must be equipped with a HEPA filter. AO. Glovebag - Means a special purpose custom containment bag with protective gloves and arm sleeves, tool pouch and side port for the use of repairing or removing pipe insulation. AR. HVAC - Means heating, ventilation and air conditioning system. AS. Industrial Hygiene - "Is that science and art devoted to the recognition, evaluation, and control of those environmental factors or stresses, arising in or from the work place, which may cause sickness, impaired health and well-being, or significant discomfort and inefficiency among workers or among the citizens of the community'." AT. Industrial Hygienists (1H) - An individual who by education or experience has gained competence in the field of industrial hygiene. In this manual the IH is the owners representative and/or the air monitoring professional. AU. Movable Object - A piece of equipment or furniture in the work area which can be removed from the work area. AY. Air Filtration System - A portable exhaust system equipped with HEPA filtration and capable of maintaining a constant low velocity air tlow into contaminated areas from adjacent uncontaminated areas. AW. NESHAPS - The National Emission Standards for Hazardous Air Pollutants. AX. NIOSH - The National Institute for Occupational Safety and Health. CDC -NIOSH Building J N.E. Room 3007 Atlanta, GA 30333 AY. OSHA - The Occupational Safety and Health Administration, 200 Constitution Avenue, Washington. D.C. 20210. For work in New Mexico the regional office the Environmental Improvement Division (505) 8272452. In Texas the Regional OSHA office is 1-800-692-4202. AZ. Regulated Area - The demarcated areas in which asbestos train personnel activity takes place. This includes any area roped off by the contractor or owner with asbestos warning signs and/or tape. BA. Shower Room - A room between the clean room and the equipment room in the worker decontamination enclosure with hot and cold or warm running water controlled at the tap and suitably arranged for complete showering during decontamination. BB. Shrouding (Full) - Means the process of covering all the interior surfaces (floor, walls, doorways, windows, ceiling) of a room with polyethylene sheeting. BC. Semi-Shrouding - Means the process of covering a portion of the interior surfaces (floor, walls doorways, windows, ceiling, etc.) of a room with polyethylene sheeting. BD. Surfactant - A chemical wetting agent added to water to improve penetration. BE. Tunneling - Means the forming of connected enclosed corridors with plastic sheeting for passageways between shrouded and/or semi-shrouded enclosures. Sun City Analytical, Inc. (c)copynght 1997 23 ASARCO.lnc. El Paso Power House Basement Abatement ASARCO ELP 0010859 BF. Visible Emissions - Any emissions containing particulate asbestos material that are visually detectable without the aid of instruments. This does not include condensed uncombined water vapor. BG. Waste Transfer Airlock - A decontamination system utilized for transferring containerized waste from inside to outside of the work area. BH. Wet Cleaning The process of eliminating asbestos contamination from building surfaces and objects by using cloths, mops, or other cleaning utensils which have been dampened with water and afterwards thoroughly decontaminated or disposed of as asbestos contaminated waste. BI. Work .Area - Means the portion of the building (or structure) comprised of the room(s) and connecting passagewav(s) (such as other rooms, hallway, corridors, etc.) required to gain access to the designated material(s) to be removed. BJ. Work day - Means any day between the project start and the completion date, with the exception of weekends. Weekends may become work days if authorized by the Owner. END OF THIS SECTION Sun City Analytical, Inc. (c)copyright 1997 24 ASARCO.Inc. H Paso Power House Baseman Abatement ASARCO ELP 0010860 SECTION 01300 SUBMITTALS 1.01 Submittal with Proposal A. Proof of Asbestos Abatement experience: 1. Documentation of at least 3 years experience using OSHA, EPA. 763 AHERA regulations (letters of recommendation will be accepted). 2. Name of contact person on at least one on going abatement project. 3. Notarized statement that offerer's firm or company performing work for the past three (3) years has not received any notice of violation regarding compliance with any applicable asbestos law. [f notice of violation has been received by the offerer, circumstances involved should be described in the notarized letter for consideration by the Owner and its Consultant. B. Proof of personnel qualifications, training and experience: 1. Submit Texas State Contractor License to be able to do asbestos abatement work in Texas. 2. Submit name of supervisor to be used on project. Submit his current medical. EPA approved supervisor training certificate, and Texas State License. 3. Submit name of every worker to be used on project. Submit his current medical. EPA approved worker training certificate, and Texas State License. 1.02 Submittais required at Pre-Abatement Meeting: A. Prior to starting project Contractor shall submit to the Industrial Hygienist the following data on ail materials, fixtures or equipment intended for use on this project. All material, equipment, and fixtures shall be approved by the Industrial Hygienist. Each item not meeting standard shall be repaired or replaced bv Contractor at no added expense to Owner. Each item on the list submitted by the Contractor shall be clearly identified as to proposed location with appropriate reference to drawings and/or specifications. Catalogs, drawing and similar literature shall be clearly marked to identify the items as noted on the lists submitted, and shall be cross-reference therewith. Approval of such items will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor shall be responsible for the dimensions and design of adequate connections, details and satisfactory construction of all work. Contractor shall submit complete narrative, pictorial or manufactures' specifications and technical data brochure(s) to describe: 1. All enclosures, shrouding complete with detailed layout of decontamination facilities, air filtration system units, emergency exit waste load out and control center. B. Air filtration system machines shall have the following: 1. HEPA filter set, along with primary and secondary filter. 2. Time meter and filter pressure drop gauge. 3. All accessories of air filtration system as: automatic shut-down if HEPA ruptures or air discharge is blocked, lockout to prevent usage without HEPA filter. 4. Air Filtration System pressure recorder, water gauge or equivalent for use to verify pressure differential. C. Work force to be used, supply number and work schedule for completion of project. Show back up personnel capabilities in the event Contractor falls behind schedule. D. Truck or vehicle to be used to transport ACM waste to landfill. Show load capabilities and condition of Sun City Analytical, Inc. (c)copvnght 1997 25 ASARCO.Inc. El Paso Power Hawse Basement Abatement ASARCO ELP 0010861 vehicle. Proof that EPA 10 Day Notice has been submitted. Also proof that local police and fire departments ha%e been notified of project and conditions of project. Proof that notice has been submitted for permission to dump waste at EPA approved Landfill. Decontamination center to be used: 1. Pre-fab or portable showers to be used have Hot and Cold water taps, and made of non-porous materials. 2. Waste water filtration system to be used that have 20 micron primary filter and 5 micron secondary filter. Also submit data on replacement filters. All respiratory protection equipment brochures describing: 1. Air purifying respirator with HEPA filters and NIOSH approval number. (Only to be used during preparation on this project). 2. Powered Air Purifying respirators with full-facepiece, HEPA filters and NIOSH number. 3. Type C Supplied air complete with full lace piece, pressure demand regulator. NIOSH approval number, back up egress system. Panel board complete with compressor failure alarm, high temperature alarm, carbon monoxide alarm, in line filtration to assure Grade D air, low pressure compressor, and proper CO alarm calibration procedure. Submit samples of the following: 1. Fire Retardant plastic sheeting. 2. Duct tape. 3. Plastic bags. 4. Glove bag. 5. Warning signs, labels and barrier tape. 6. Disposable clothing. Submit brochures for other equipment and supplies: 1. Wetting agent (surfactant). 2. Encapsulants. 3. Plastic lined drum. 4. Vacuum equipment along with HEPA filter to be used. 5. Air sampling apparatus. 6. Ground fault interpreters. 7. Communication system between regulated area and control area. Submit company Standard Operating Procedures for asbestos abatement projects. Submit company fire and emergency procedures and spill response plan. Submit company Respiratory Program. Submit company Hazard Communication Program. Analytical, toe. (c)copyright 1997 26 ASARCO.Inc. Paso Powry House Bascmait Ahalqnart ASARCO ELP 0010862 1.03 Submittals required Daily during Abatement: A. Dailv, during the project the following items shall be maintained by the contractor and may be verified by the IH. B. Air monitoring results from previous day of sampling. The results shall be hard copy from the approved lab. All air sample results must be posted within twenty four (24) hours. C. Daily narrative log of work progress, to include delays, potential change orders, stoppage of work and results of visitors' inspections. D. Documentation of inspection of all areas and equipment. Contractor shall note corrections or planned actions for correction. E. Notification of any accident or emergency requiring a doctor's treatment or evacuation of any employee. F. Documentation of all personnel entering and leaving regulated area. G. Within 24 hours submit the documentation of any ACM w'aste that has been taken to landfill. H. Updated construction schedule and abatement plan. I. Documentation of filter changes on respirators, HEPA vacuums, filtered Air Filtration System, and other engineering controls. .1. When Grade D air is required Contractor shall provide compliance with OSHA 1910.134 and document that CO monitor is calibrated on daily basis. K. Site Security daily logs submitted to the IH. 1.04 Submittals Required at Conclusion of Project A. Submit within five (5) days of final ACM dumping the Texas waste manifest documenting landfill used and total amount of ACM that was buried. B. All air sample results from testing lab that were not previously submitted. C. A complete log book of all documentation acquired during the project. Contractor shall insure that minutes of final walk-thru with IH, and Owner are incorporated into final project documents along with corrective action taken by Contractor. D. Complete written reports on proper OSHA forms of any accident, emergency or other safetv and/or health incident. E. Summary of corrective actions taken of punch list, if any, drawn up by Owner and IH. 1.05 Disapproved Submittals: A. Submittal which have been disapproved, the Contractor shall re-submit within 5 days of receipt of the disapproved submittals. END OF THIS SECTION Sun City Analytical, Inc. (c)copvnght 1997 27 ASAKCO.tnc. H Paso Power House Basement Abatement ASARCO ELP 0010863 SECTION 01410 TESTING LABORATORY SERVICES .01 Air Monitoring and Sampling: A. General Requirements: Air monitoring and sampling shall be in accordance with standards and methods required by all applicable regulations. All air monitoring technicians and the testing laboratory shall be licensed in the State of Texas in accordance with 295.31 through 295.70 Texas rules and regulations. B. The Contractor shall obtain the services of an Industrial Hygienist or Professional Air Monitor specialized in air monitoring for the purpose of air monitoring and sampling. C. The Contractor shall retain a list of qualifications and experience of the individuals who shall be responsible for air monitoring and sampling. D. Throughout the removal and subsequent cleaning operations. AMBIENT (AREA) MONITORING will be conducted by the Contractors representative to ensure compliance with all regulations and is conducting the work in a manner which minimizes airborne asbestos levels as well as minimizes the contamination of other facilities. Analytical results will be available at the Control Center. E. For each set of air samples submitted to the laboratory by the Contractor for analysis, the Contractor shall submit blank cassettes for analysis (minimum of 10'T). Each blank cassette shall be submitted as a part of the Contractors's quality control program. F. The Industrial Hy gienist (IH) mav request to OC sample taken by the Contractor. The Industrial Hygienist (IH) will randomly ask for wedge of cassette filler or read a percentage of the Contractors samples. G. Air monitoring results shall include as a minimum for each sample the following: sample ID. laboratory ID. date sample taken, flow (liters/minuies), time (minutes), blank count (fibers/field), fibers/cc. detection limit (fibers/cc), location, employee's name, type of activity and the name of the analyst and the date the sampled was analyzed. H. All personnel samples for asbestos shall be in accordance with 29 CFR 1926.5S and as specified in this manual. The Contractors shall sample employees who are anticipated to have the greatest risk of exposure as determined by the industrial hygienist. At least 25ff, of the work crew or a minimum of two emplovees. whichever is greater, during a work shift shall be sampled. .02 Methods of Analysis: A. Air samples shall be analyzed by Phase Contrast Microscopy method using the NIOSH 7400 method. B. Air samples shall be analyzed by an analytical laboratory who possess the following: 1. Lab shall use the NIOSH 7400 method for analysis according to 29 CFR 1926.58. Appendices A or B which describes the OSHA ORM method and which utilizes the acetone/triacetin sample preparation or equal. 2. Lab to used shall be independent of the Contractor and shall be approved by the Industrial Hygienist. 3. Lab shall have technicians who have their NIOSH 582 Class. Certificate must be submitted to Industrial Hygienist (IH) upon request. 4. Lab shall be a successful participate in the Proficiency Analytical Testing Program (PAT) for the last 4 rounds and have National Institute of Standards and Technology (NIST) certification. Sun City Analytical, Inc. (c)copynght 1997 28 ASARCO.Inc. Q Paso Power House Basonait Abatement ASARCO ELP 0010864- 5. Lab shall be capable of delivering results within 24 hours of sampling to the client so the can be posted on the job site. 6. Lab shall have current Texas State License. .03 Clearance Samples A. Transmission Electron Microscopy - are NOT required on this contract. 1. Any TEM analysis shall follow 40 CFR 763 AHERA regulations for sampling and analvsis protocols. B. Phase Contrast Microscopy with the NIOSH 7400 method in accordance with SECTION 01714 WORK AREA CLEARANCE, shall be the method used for Clearance testing. Clearance samples shah be done in the normal work shift of the contract and shah be noted in the contractors construction schedule and abatement plan. END OF THIS SECTION Sun City Analytical, Inc. (c)copynght 1997 29 ASARCO.Inc. El Paso Power House Baseman Abatement ASARCO ELP 0010865 SECTION 01500 TEMPORARY FACILITIES AND CONTROLS 1.01 Temporary Buildings A. Provide first aid facilities at control center and in waste disposal vehicle. 1.02 Telephone Service A. The Owner will not furnish telephone service. Contractor shall designate a telephone for emergencies. 1.03 Water for Construction A. The Owner will furnish water used during construction so long as the required amounts are within the capacity' of the existing building systems. Contractor shall provide piping, valves, and other items required to properiv transport the water to the location where it is needed. 1.04 Electricity for Construction A. The Owner will provide electrical energy from existing panels as required to operate power toois and equipment and to provide temporary light so long as the required amounts are within the capacity of the existing building systems. Contractor shall provide temporary wiring and outlets as required and temporary lighting if necessary. 1.05 Employee Conduct A. The Contractor shall be responsible for ensuring that all employees comply with all Applicable Laws and perform work in a safe manner. Any employees entering the work area under the influence of alcohol or drugs shall be immediately removed by the Contractor from the job site. B. The Contractor shall instruct all his employees to refrain from talking with anyone about this project. Any interviews or discussions about the asbestos project shall be done only by written consent from the owner. l.Ofi Advertising A. At no time will any kind of advertisement be displayed, published, or reported to new's media without the expressed written consent of the Owner and 1H. 1.07 Barricades A. The Contractor shall provide sufficient barricades, walkwavs to protect all personnel from injury or exposure to asbestos. All work areas shall be barricaded with proper signs. 1.08 Security A. Site security shall be provided by Contractor at Contractor's expense. See Section 01030. 1.09 Toilets A. Contractor may use the toilets facility of ASARCO. ASARCO has a designated break and shower facility available for use by contractor personnel. The contractor shall be responsible for maintaining this facility clean. END OF THIS SECTION Sun City Analytical, Inc. (c)copynght 1997 30 ASARCO,lac. El Paso Power House Basomoit Abatement ASARCO ELP 0010866 SECTION 01513 AIR FILTRATION SYSTEM Air filtration system A. Air Filtration must be established in the work, area by means of a local exhaust system. The equipment shall exhaust through a three-(or more) stage HEPA filtration system to outside of the building. The equipment shall be in operation for 24 hours per day until final air clearance is achieved. B. The system shall have the following characteristics: 1. Filtration equipment in compliance with ANSI Z9.2. Local Exhaust Ventilation. 2. Capable of maintaining a minimum pressure differential of minus 0.02 inches of water gauge in the work area relative to adjacent areas. 3. Air filtration system pr.ssure system units shall be employed in sufficient quantity to provide four (4) air changes per hour in the work place. Use the formula to determine total air flow requirement. Total CFM = Volume of work area/15 rain Number of units = Total CFM/80fc capacity' of unit 4. The hose used to duct the exhaust shall be either new temporary plastic tubing or new wire reinforced ducts. 5. The HEPA filtered ventilation machine shall be equipped with some tvpe of warning sound or horn if: a. any restriction is found in the intake or exhaust, or b. any rupture occurs in the HEPA filter, or c. any loss of electrical power occurs. C. Proside a chart recording measuring device or equivalent for use to verify the pressure differential. This data shall be submitted to the IH at the end of the work shift. D. Contractor shall install on the containment one fully operational (including filters) backup ventilation machine. E. Units shall be placed to provide maximum air flow and prevent short circuiting air flow. F. Pre-filter shall be changed as needed as conditions warrant. G. The HEPA filters will be checked by the Industrial Hygienist (IH) for integrity and usaue. and shall be changed by Contractor if damaged or overloaded. END OF SECTION Sun Cits Analytical, Inc. (^copyright 1997 31 ASARCO.Inc. El Paso Power House Bascmest Abatement ASARCO ELP 0010867 SECTION 01527 WORK AREA PROTECTION .01 Preparation of Work Areas All ploy used on this project shall be limited to certified fire retardant brands; A. Post warning signs meeting the specifications of OSHA 29 CFR 1926.1101 at any location and approaches to a location where airborne concentrations of asbestos may exceed ambient background levels. Signs shall be posted at a distance sufficiently far enough away from the work area to permit an employee to read the sign and take the necessary protective measures to avoid exposure. Additional signs may need to be posted following construction of workplace enclosure barriers. Contractor shall post warning signs in both English and Spanish. B. Shut down and lock out electric power to all work areas. Provide temporary power and lighting. Insure sate installation (including ground faulting) to temporary power sources and equipment by compliance with all applicable electrical code requirements and OSHA requirements for temporary electrical systems. C. Shut down and lock out of all venting, heating, cooling, and air conditioning system (HVAC), raisers, main and/or branch duct work which are involved in supplying, return, or venting air from the work. Investigate the work area and agree on pre-abatement condition with the Industrial Hygienist (IH). Seal all intake, return, and exhaust vents in the work area with tape and 6-mii polyethylene. Also seal any seams in system components that pass through the work area. D. Preclean all movable objects within the work area using a HEPA filtered vacuum and/or wet cleaning methods as appropriate. Alter cleaning, these objects shall be removed from the work area and carefully stored in an uncontaminated location. This shall be done with strict coordination with Industrial Hveienist (IH). E. Preclean all fixed objects in the work area using HEPA fdtered vacuums and/or w'et cleaning techniques as appropriate. Careful attention must be paid to machinery behind grills or gratings where access may be difficult but contamination significant. Also pay particular attention to wall, floor and ceiling penetrations behind fixed items. After precleaning, enclose fixed objects in 4 mil polyethylene sheeting and seal securely in place with tape. F. Seal off all windows, doorways, corridor entrances, drains, ducts, grills, grates, diffusers, skylights and any other openings between the work area and uncontaminated areas outside of the work area with 4 mil polyethylene sheeting and tape. I. Cover floors in the work area with fire rated polyethylene sheeting. Floor shall be covered with two layers of 6 mil (minimum) sheeting. Additional layers of sheeting may be utilized as drop cloths to aid in cleanup of bulk materials. J. Plastic shall be sized to minimize seams. If the floor area necessitates seams, those on successive layers of sheeting shall be staggered to reduce the potential for water to penetrate to the flooring material. A distance of at least 6 feet between seams is sufficient. Do not locate any seams at wall/floor joints. K. Floor sheeting shall extend at least 12" up the sidewalls of the work area. Sheeting shall be installed in a fashion so as to prevent slippage between successive layers of material. (Vinyl sheeting may be used for improved traction on floors.) L. Cover walls in the work area with two (2) layers of 4 mil fire rated polyethylene sheeting. They can be Sun City Analytical. Inc. (c)copyTight 1997 32 ASAKCO.Inc. El Paso Power House Abatement ASARCO ELP 0010868 decontaminated by using HEPA vacuums and wet cleaning techniques. Walls with mortar joints (i.e. tile) are considered porous. In addition, openings through these walls to uncontaminated areas of the building must be sealed. M. Walls shall be covered with two layers of 4 mil polyethylene sheeting. Plastic shall be sized to minimize seams. Seams shall be staggered and separated by a distance of at least 6 feet. Wall sheeting shall overlap floor sheeting by at least 12 inches beyond the waii/floor joint to provide a better seal against water damage and for establishing air filtration pressure. N. Wall sheeting shall be secured adequately to prevent it from falling away from the walls. This will require additional support/attachment when air filtration ventilation systems are utilized. Fire Protection A. General Requirements: 1. The Contractor shall employ his supervisor or a designated safety control officer to provide training to the workers of the proper use of fire extinguishers, implementation of Fire Safety Program and proper evacuation of the containment area. 2. Training shall meet the minimum requirements of OSHA 1926.150(a)(5). 2. All tire protection equipment shall be in place before any preparation or removal of asbestos will be allowed. Such equipment shall be clearly identified with an appropriate signs. 4. All combustible rubbish, including bagged asbestos, shall be removed from the containment on a daily basis. Absolutely no bulk debris shall be allowed to remain in the containment over night. 5. During demolition or alterations, existing sprinkler installations shall be retained in service as long as practicable. 6. Contractor shall provide a safe means of egress from fire and any type of emergencies. B. Work Area: 1. Polyethylene used on this project shall be limited to certified fire retardant brands. Material Safety Data Sheets (MSDSs) shall be maintained on the site for the inspection by any outside agencies of jurisdiction to prove the presence of this type of poly. 2. Smoke/heat detectors shall be adequately spaced about the containment and/or work area. A minimum of one per 1000 square foot of floor space is required. One shall be placed 15 feet from the decontamination station. 3. The Contractor shall provide a 4A/60BC chemical extinguishers for every 1000 square feet, or fraction, of containment area (LAW Texas Department of Health regulations 295.60 (m)(l). All Workers shall be with-in a maximum of 100 feet travel distance of a fire extinguisher. 4. All air filtration units shall be able to be switched off from a single switch located at the control center. In the event that a fire starts or a smoke and/or heat detector is activated, the air filtration units shall be immediately switched off. The machines shall remain in the off mode until such time as it has been verified that a fire does not exist. Sun City Analytical, Inc. (c)copyright 1997 33 ASARCO.Inc. El Paso Power Hcwse Basement Abatement ASARCO ELP 0010869 c. Cleanroom and/or Decontamination Unit: 1. A smoke and/or heat detector shall be located in the cleanroom area. 2. 4A/60BC chemical extinguishers shall be located at either end of the decontamination unit. .03 Viewing Inspection Window A. Where feasible, a minimum of one clear 1/8 inch(3Jmm) thick acrylic sheet measuring approximately 18" x 24" (450mm x 600mm) may be installed by the Contractor as a viewing inspection window at eye level on a wall in each containment enclosure. B. All such windows shall be sealed leak-tight with industrial grade duct tap... END OF THIS SECTION Sun City Analytical, Inc. (c)copvnght 1997 34 ASARCO.lnc. H Paso Power Boose Basamcot Aharonrat ASARCO ELP 0010870 SECTION 01528 ENTRY INTO CONTROLLED AREAS .01 Entry and Exit of Work Area A. General Requirements: Unless otherwise indicated (such as contract drawing, emergency evaluation, and these specifications) entry and exiting of the work area shall be through the "Worker and Equipment Enclosure" or an "Airlock". B. Entry and Exit through "Worker and Equipment Enclosure": C. Entering the Work .Area: Each worker and/or authorized visitor shall enter the clean room, remove street cloths, put on a clean approved respirator and protective clothing and disposable footwear. From this point, workers and/or visitors shall not eat, drink, smoke, chew gum or tobacco while in the work area. Respirator shall be tested for proper fit and operation. After completing the work and/or visiting thv worker and/or visitor shall then proceed through shower room to the equipment room. At the discretion of the Industrial Hygienist (IH) smoke testing of respirator shall be performed on all personnel donning respirators. D. In the Equipment Room any tools, equipment, etc. needed shall be picked up here. Non-Disposable footwear shall be put on then proceed to work area. E. Exiting the Work Area: Prior to entering the equipment room, worker and/or authorized visitor shall brush off any gross contamination. Use the buddv svstem to visually check clothing for asbestos debris. F. In the equipment room, any tools, equipment, etc. shall be stored, and all clothing except respirator shall be removed. Disposable type clothing shall be placed in a disposable container (plastic bag). Non disposable footwear shall be removed and stored while still wearing the respirator the proceed naked to the shower. G. While showering, first wash and soak filters and then remove respirator and continue to wash respirator with soap and water after washing respirator, proceed to wash body and hair with appropriate soap and shampoo. Finally dry off and proceed to the clean room. H. In the clean room, worker and/or visitor shall proceed to dress in street their clothes or clean coveralls. Coveralls worn outside the clean room of the enclosure shall be of a different color or marked for easy identification from those worn in the work area. I. Betore re-entering the work area from the clean room, each worker and/or authorized visitor shall put on a clean respirator and dress in clean protective clothing and follow the above procedures. J. In the vestibule airlock remove protective clothing while still wearing the respirator and place into a disposable bag. The exterior of the respirator shall then be wiped with a damp rag or disposable towel which is placed in the disposable bag. While still wearing the respirator, exit the airlock after the disposable bag is sealed and left in vestibule. K. Once outside the airlock, the respirator shall be removed, respirator cartridges removed and disposed as asbestos contaminated waste. The respirator shall then be washed, new cartridges installed and placed in a the appropriate storage container. END OF THIS SECTION Sun City Analytical, Inc. (c)copynght 1997 35 ASARCO.Inc. El Paso Power Hook Basoaent Abataaeot ASARCO ELP 0010871 SECTION 01560 RESPIRATORY PROTECTION 1.01 Respiratory Protection A. Respiratory protection shall be provided to workers in conjunction with a Respiratory Protection Program which shah meet the requirements of 29 CFR 1910.134, 1926.1101 and 1910.1001. This program shah be posted at the work site. Respirators shah be personally issued, fitted and marked. All workers shah be familiar with the contents of the respiratory program. B. The Contractor shah provide documentary evidence that ail personnel required to wear respirator.' protection have been trained in accordance with 40 CFR Part 763, 29 CFR 1910.134. 1910.1001 and 1926.1101. C. The Contractor shah provide the workers with clean and properly maintained respiratory equipment approved by NIOSH/MSHA during ah work phases in this project. D. Air purifying respirators (half-mask or fuh-face) with high efficiency particulate (HEPA) filters shah ONLY be used for the floor the removal, pre-abatement activities, and when removing waste from outside the containment to disposal storage, and/or when loading and unloading the covered waste disposal storage facility. E. Type C supplied air nr PAPR shall be the initial respirator worn when beginning any asbestos abatement on this project because this is a Class I (OSHA classification) abatement project. Contractor shall have on site all historic data and documentation in accordance with OSHA 1926.1101 when any other respirator is used. Type C supplied air or SCBA with full lace piece operated in a pressure demand mode shall be used inside any containment utilizing pressure differential to maintain inward air flow. The Type C air supply must also have an auxiliary self-contained SCBA operating in a pressure demand mode, or high efficiency particulate (HEPA) filter which provides a 15 minute escape time in the event of compressor failure or malfunction. See Section 01030 lor respiratory protection specified. G. When Type C respirators are employed, the air supply system shall provide grade "D" or better breathing air in accordance with OSHA 29 CFR 1910.34 and ANSI ZS62.1 Commodity Specification for Air. H. The air shall be tested by the Contractor to verify that certain criteria established by the Compressed Gas Association, Inc., has been met or exceeded. The Contractor must provide a written copy of the analytical test results prior to using system. The Contractor shall be responsible for all fees associated with these tests. All tests will be performed at the job site and in the presence of the Owners representative. I. For bottled air filled with compressed air. or manufactured air Contractor shall follow the same test as above. For bottled air the Contractor must provide a certificate from the supplier stating the air is grade "D" or better. J. It is the Contractor's responsibility to provide adequate respiratory protection for any foreseeable contingency. K. Anytime the compressor or the Grade D Panel is moved, the Contractor shall perform a new Grade D air Test as stated in G and H. above. L. The Carbon Monoxide (CO) calibration of the panel shall be done and recorded in the log book daily. Sun City Analytical. Inc. (c)copyright 1997 36 ASAKCO.Inc. El Paso Power House Basement Abatement ASARCO ELP 0010872 END OF THIS SECTION Sun City Analytical, Inc. (c)copyright 1997 37 ASARCO.Ine. Q Paso hmrBoBC Basmoft Abataaotf ASARCO ELP 0010873 SECTION 01562 PERSONNEL PROTECTION 1.01 Personnel Protection: A. General Requirements: The Contractor shall provide all personnel training, equipment, materials, services and liability insurance required to perform the work in accordance with applicable Federal, State and Local regulations and this specification. Contractor shall have 1.5 respirators per man on site to comply with the Texas rules and regulations. B. Prior to commencement of work, workers shall be instructed, and be knowledgeable of the specific Asbestos Removal Procedures to be used in this project. In addition to the instructions, on-site training in the use of equipment and facilities unique to the job site shall be performed, to include emergency procedures, such as equipment power failures, fires, evacuations, etc. 1.02 Worker and Visitor Protection A. Provide workers with sufficient sets of protective full-body clothing. Such clothing shall consist of full-body coveralls and respirator. Provide eye protection and hard hats as required by applicable safety regulations. Non-disposable type protective clothing and footwear shall be left in the contaminated equipment room until the end of the abatement work, at which time such items shall be disposed of as asbestos waste, or shall be thoroughly cleaned of all asbestos containing waste. Disposable type clothing, and footwear may be used and shall be disposed of as asbestos waste. Bare feet will not be permitted. B. Provide authorized visitors with suitable protective clothing, respirator, headgear, eye protection and footwear, as described in paragraph A. above, whenever they are required to enter the work area. C. Each worker shall, upon entering the job site: Remove street clothes in the clean change room, put on a respirator and dean protective clothing before entering the equipment room or work area, the exception shall be that workers intending to reuse contaminated protective shall enter equipment room wearing respirators. D. Each time the worker leaves the work area: the worker shall remove gross contamination from clothing before leaving the work area; proceed to the equipment room and remove all clothing except respirators; Still wearing the respirator, proceed to the shower; clean the outside of the respirator with soap and water while showering; remove the respirator; thoroughly shampoo and wash themselves, remove filters (where required) and place them in the container provided for the purpose; and wash and rinse the inside of respirator. 1. Contractor is responsible for providing soap, shampoo, dean and dry towels daily to employees and visitors. E. After showering, each worker shall proceed directly to the clean change room and dress in clean clothes at the end of each day's work, or before eating, smoking or drinking Before re-entering the work area from the clean change room, each worker and authorized visitor shall put on a dean respirator with filters (where required) and shall dress in dean protective clothing, the exception shall be that workers intending to reuse contaminated protective dothing stored in the equipment room shall enter the equipment room wearing respirators. Son City Analytical, Inc. (c)copyTight 1997 38 ASARCO.Iac. Paso Power Hoase Basnot AbataaC ASARCO ELP 0010874 F. Asbestos contaminated footwear shall be stored in the equipment room when not in use in the work area. Upon completion of abatement, dispose of footwear as asbestos contaminated waste or clean thoroughly inside and out using soap and water before removing from work area or from equipment and access area. Store asbestos contaminated protective clothing in the equipment room for reuse or place in receptacles for disposal with other asbestos contaminated materials. G. Workers shall not eat, drink, smoke or chew gum or tobacco, or utilize sanitary toilet facilities at the worksite except in established locations outside the work and containment areas, and enclosures. H. Workers shall be fully protected with respirators and protective clothing immediately prior to the first disturbances of asbestos-containing or asbestos contaminated waste materials and until final clean-up is completed. This includes removal of fixtures, ceilings, or anything else which may disturb the ACM. I. Provide and post, in the Equipment Room and Clean Room, the decontamination and work procedures to be followed by workers. END OF THIS SECTION Sun City Analytical, Inc. (c)copyrigbt 1997 39 ASARCO.Iac. Paw PgucrBoBt Btssot AlatcacM ASARCO ELP 0010875 SECTION 01563 DECONTAMINATION UNITS 1.01 Enclosures: A. General Requirements: Several types of enclosures are used, one for the workers and equipment entry and exit of the work area, a second as a holding area for waste storage and load-out area, and a third as a separation between the work area and the non-work area. Enclosure types required for this project shall be governed by special instructions on this specification. B. Enclosures can be portable pre-fabricated units or site fabricated units. Contractor shall submit for approval the type of enclosures to be used for this project. The submittal shall be submitted in conjunction with Section 1300 of this specification and included, but not be limited to the following: 1. Floor Plan layout with dimensions showing all components. 2. Material list with sizes and thickness. 3. Plumbing layout showing shower(s), piping, drains, filtration systems(s) and water heater (if used). 4. Electrical (if used) a layout showing lighting and/or outlets. 5. Photographs may be submitted in conjunction with the above items. C. The minimum width of any way of exit access shall in no case be less than 28 inches. Where a single way of exit access leads to an exit, its capacity in terms of width shall be at least equal to the required capacity of the exit to which it leads. Where more than one way of exit access leads to an exit, each shall have a width adequate for the number of persons if must accommodate. D. Worker and Equipment Enclosure: Shall consist of 3 (three) compartments; clean room, shower room and equipment room separated by airlocks. The envelope of the enclosure shall be leak free. E. Clean Room: This room shall be provided with a locker or container for each worker's street clothing, respirators, respirator cartridges, clean work clothing, towels, and personnel supplies. Joint use of this space for other functions, such as office, storage of equipment, materials or tools, shall be prohibited. F. Shower Room: This room shall have an adequate number of showers, soap, shampoo and containers (plastic bags) for respirator cartridges. Shower(s) shall be piped with hot and cold or warm water. The room is to be free of any leaks. Under no circumstance shall the shower room be used for cleaning equipment. G. Equipment Room: This room shall be used for storage of equipment such as ladders, vacuums, scraping tools, non-disposable footwear, hardhats, goggles and any additional asbestos contaminated work items. This room shall be provided with receptacles, such as plastic bags or approved containers, for the use of disposable coveralls (if used) and asbestos contaminated waste before exiting to the shower. The room may also be provided with a wash area for equipment. H. This area shall be cleaned daily (several times a day is recommended) to prevent asbestos debris from being tracked into the shower area. I. Airlocks: Airlock curtain (door) shall be formed by two (2) overlapping sheets of plastic (4 mil, minimum) the full height and width of the passageway, each sheet being attached at the ceiling and one side. Each sheet is to be attached on opposite sides of the passageway. The sets of curtains (overlapping sheets) are required, one at each end of a space forming a vestibule, dead space. The space (vestibule) shall be two (2) feet in length by the width of passageway for enclosures and four (4) to sue (6) feet in length by width of passageway for other location requiring airlocks. Sun City Analytical. Inc. (c)copynght 1997 40 ASARCO.Iac. Q Pm Power Hoose Hismiti AbaCneat ASARCO ELP 0010876 J. Filtration System: The shower drain and equipment room drain (if any) shall be connected to a filtration system before being discharged to the sanitary sewer. Fdters shall be arranged in parallel banks with a 100 micron pre-filters feeding into a 1 micron final filters. Replaced filters shall be treated as asbestos contaminated waste and disposed of properly, K. Holding Area (Wa..e Storage and Load-Out): Shall consist of at least 1 (one) compartment with an air lock between the compartment and the intended disposal vehicle. The envelope of the compartment and air-lock shall be leak free. Passage between compartment and work area shall have two sheets of plastic overlapping each other. L. Separation(s) shall be constructed as follows: 1. Framing of suitable materials such as 2 x 4 wood or metal studs shall be erected between floor with a bottom plate and ceiling with a top plate for distance. Support as required. 2. Cover both sides with double layer of plastic sheeting (4 mil) with joints staggered and sealed with tape. 3. Seal all edges of separation at floor, walls and ceiling with caulking to be airtight. M. Maintenance of enclosure systems shall be performed by the Contractor. END OF THIS SECTION Son City Analytical, Inc. (c)copyright 1997 41 ASARCO,Ik. H Paso rower Hoasc Bniwat Abatsaot ASARCO ELP 0010877 SECTION 01632 PRODUCTS Materials: A. General Requirements: Materials shall conform to the following: 1. All material shall be delivered to the job site in the original packages, containers, or bundles bearing the name of the manufacturer and the brand name. 2. Store all materials subject to damage off the ground, away from wet or damp surfaces, under cover sufficient to prevent damage or contamination. 3. Damaged or deteriorating materials shall not be used and shall be removed from the premises and properly disposed of. 4. All material not in original containers will be reviewed by Industrial Hygienist (EH). B. Plastic (polyethylene) sheets, of four (4) mil thickness or greater as specified in scope of work of this document, in sizes to minimize the frequency of joints. Submit a sample of each thickness intended to be used. C. Tape: Capable of sealing joints of adjacent sheets of plastic sheets and for attachment of plastic sheet to finished or unfinished surfaces or dissimilar materials and capable of adhering under both dry and wet conditions, including use of amended water. Submit a sample of each type to be used. D. Surfactant (Wetting Agent): Shall consist of 50 percent polyoxyethylene ether and 50 percent of polyoxyethylene polyglycol ether, or equivalent, and shall be mixed with water to provide a concentration of one ounce surfactant to five (5) gallons of water. E. Impermeable Containers shall be suitable to receive and retain any asbestos-containing or contaminated materials until disposed of. The containers must be both airtight and watertight. The containers shall be labeled in accordance with OSHA Regulations 29 CFR 1926.1101. The container shall be of six (6) mil plastic bag (submit sample), or plastic lined drum (submit brochure), etc. Submittal required for each type intended to be used in this delivery order. F. The Glovebag shall consist of a 6-12 mil bag equipped with long-sleeve gloves, a tool pouch, and side port opening used for water and vacuum application. The glovebag with a zipper arrangement is preferable but not mandatory. Glovebags shall be of at least 6 mil and be seamless at the bottom. G. Warning Labels: Container shall have the following notation in accordance with Applicable Laws 29 CFR 1926.1101. DANGER CONTAINS ASBESTOS FIBERS AVOID CREATING DUST CANCER AND LUNG DISEASE HAZARD H. Encapsulant: A sealant specifically designed to be used after the removal of asbestos to capture any fibers which may be left on surfaces in accordance with requirements of the U.S. Environmental Protection Agency (EPA). Sim City Analytical, Inc. (c)copyrigbt 1997 42 ASARCO.lnc. D Pzso Power Hose Bisaal Atatcmat ASARCO ELP 0010878 I. Warning Signs: Signs shall have the following notation in accordance with Applied Laws: DANGER ASBESTOS CANCER AND LUNG DISEASE HAZARD AUTHORIZED PERSONNEL ONLY RESPIRATORS AND PROTECTIVE CLOTHING ARE REQUIRED IN THIS AREA J. Other Materials - provide all other materials as specified in drawings; also, other materials such as lumber, nails, and hardware, which may be required to construct and dismantle the decontamination area and the barriers that isolate the work area. .02 Equipment: A. Local exhaust ventilation systems shall be designed, constructed installed and maintained in accordance with the American National Standard Fundamentals Governing the Design and Operation of Local Exhaust Systems, ANSI 29.2-79. See Section 01513. This equipment: 1. Shall be portable and equipped with a high efficiency particulate absolute (HEPA) Filtration systems incompliance with ANSI 29.2-79. 2. Deliver its rated volume of air with a clean first stage filter, an intermediate filter and a primary HEPA filter in place. 3. The HEPA filter shall be certified capable of removing particles-to 0.3 microns at a minimum efficiency of 99.97 percent. 4. Shall be able to deliver no less than 70 percent rated capacity when the HEPA filter is installed or measure 2.5 inches of static pressure differential on a magnehelic gage. 5. Shall provide manometer-type negative pressure-differential monitor with minor scale division of . 0.02 inch of water and accuracy within plus or minus 1.0%. 6. Shall have an electric mechanism which automatically shuts the machine off in the event of a filter breach or absence of a filter. 7. Shall have an audible horn which sounds an alarm when the machine has shut itself off. 8. Shall have an automatic safety mechanism which prevents a workman from improperly inserting the main HEPA filter. B. Vacuum equipment: Shall be portable and equipped with High Efficiency Particulate Absolute (HEPA) filters. C. Respirator Equipment: 1. Respirators shall be selected from among those approved by the Bureau of Mines, Department of the Interior, or the National Institute for Occupational Safety and Health Department, of Health, Education and Welfare, under the provisions of 30 CFR Part II and shall be used in accordance with Applied Laws 29 CFR 1910.1001. END OF THIS SECTION Stm City Analytical, Inc. (c)copyright 1997 43 ASARCO.Isc. B rasa PowerBoee Hhmis *> ASARCO ELP 0010879 SECTION 01701 PROJECT CLOSEOUT Re-establishment of the Work Area and Systems: A. Re-establishment of the work area shall only occur following the completion of clean-up procedures and after IH ha? declared area clean. B. Contractor, owner and IH shall visually inspect the site for any damage or discrepancies. Owner or IH shall generate a punch list for contractor to repair. C. .Any damage or discrepancies shall be repaired by contractor at his expense and reasonable fees may be retained bv owner till such time as discrepancies are repaired. D. Re-secure mounted objects removed from their former position during preparation activities. E. Re-establish HVAC. mechanical and electrical system in proper working order. Remove contaminated HVAC system filters and disDOse of as asbestos contaminated waste. Install new filters in HVAC systems. F. Final payment will be dependent on owner receiving executed waste disposal certificates, all contractor documents and Release of Material and Labor liens (.ALA G706). Contractor site documentation shall be reviewed and forwarded by the Industrial Hygienist prior to any payment being made. END OF THIS SECTION City Analytical. Inc. (c)copynghr 1997 44 ASARCO'Ioc. El Paso Power Hoase Baseman Ahalanan ASARCO ELP 0010880 SECTION 01712 CLEANING AND DECONTAMINATION PROCEDURES 1.01 Clean-up Procedures: NOTE: The clean up procedures can be started by the contractor whenever his supervisor and the Industrial Hygienist inspect and approve the asbestos abatement areas. The encapsulation shall not he done until the contractor is given approval by the Industrial Hygienist on site. A. Remove and containerize all visible accumulations of asbestos containing material and asbestos contaminated debris utilizing rubber dust pans and rubber squeegees to move material around. Do nm use metal shovels to pick up or move accumulated waste. Special care shall be taken to minimize damage to floor sheeting. All equipment not required on the project shall be decontaminated and removed from the area. All ACM disposal bags shall be removed from the containment prior to receiving approval for encapsulation or lockdown. B. Wet clean ail surfaces in the work area using rags, mops and sponges as appropriate. (Note: Some HEPA vacuums may not be wet-dry vacuums. To nick up excess water and gross wet debris, a wet-drv shop vacuum may be used. This will be contaminated and require cieamng prior to removal from the work area). C. Visually inspect ail areas where asbestos removal has taken place. Any dust, debris or residue in the containment area shall be considered to be contaminated and shall be treated as asbestos. The area inspection shall be accomplished using good Industrial Hygiene practices and ASTM E-1368-90, AHERA 40 CFR 763 and all applicable asbestos regulations concerning clearance and testing. D. The Contractor shall provide the Industrial Hygienist with all proper lighting, ladders, or scaffolding and any necessary tools to perform the clearance inspection. E. The Industrial Hygienist (IH) shall insure that a thorough job of removal and clean up has been conducted. The IH has the right to terminate his inspection and re-direct further cleanup of the whole area if upon discovery of incomplete removal or discovery of debris. F. Upon written approval by the Industrial Hygienist in the Contractors logbook, encapsulation or lockdown shall be done on all surfaces including all poly. If the inspection fails. Contractor shall re-clean using all the above mentioned steps. G. When encapsulation or lockdown has been applied the Contractor shall wait for a drying period of not less than six (6) hours or at the discretion of the on-site Industrial Hygienist. Sun City Analytical, Inc. (Ocopvnght 1997 45 ASARCO.Inc. H Paso Power Boose Basement Abatement ASARCO ELP 0010881 I H. When encapsulation has dried, the Contractor shall remove outer layer of poly from the wall, floors and ceilings. The ceiling poly shall be the first layer removed and shall be placed on the floor. Next remove the walls and place them on the floor. The floor shall then be rolled inward to avoid contamination of the inner layer of poly. Double bag the poly and remove from the containment as contaminated waste. I. Following the satisfactory removal of the outer layer of poly, another inspection shall be performed by the on-site Industrial Hygienist (IH). If any debris is found, the IH shall instruct the Contractor to re-clean the entire area. If the area is clean the IH shall bean with his first step of pre-clearance testing. (See section 01714) Clearance Testing). J. Upon achieving the clearance criteria for pre-clearance the inner layer of poly shall be removed following instructions of H. above. The critical barriers, air filtration machines and the decon shail remain in place and operational. K. Following the satisfactory removal of the inner layer of poly, another inspection shail be preformed by the Industrial Hygienist (IH). If any deDris is found, the IH shall instruct the Contractor to re-clean the entire area. If the area is clean the IH shall begin with his final clearance testing. (See section 01714) Clearance Testing). L. Upon achieving the clearance criteria for final clearance the Contractor can begin to remove all critical barriers, air filtration machines and begin his demobilization process. END OF THIS SECTION Sun City Analytical. Inc. (c)copynghi 1997 16 ASARCO.lnc. El Paso Power Hoasc Baseman Abalrmcm ASARCO ELP 0010882 I SECTION 01714 WORK AREA CLEARANCE 1.01 Clearance .Air Monitoring: A. The Contractor shall insure completion of cleanup operations in order to commence clearance air monitoring. B. The Contractor shall then arrange for an Industrial Hygienist to sample the air in the work area for airborne fiber concentrations. C. The air sampling shall be conducted using sampling pumps calibrated at a flow rate of at not more than 10 liters per minute using collection media and procedures in accordance with 40 CFR 763 .AHERA and NIOSH .Analytical Method 7400 and 7402. Air volumes shall be sufficient to provide reliable results down to a concentration of 70 structures per centimeter squared or <0.05 fibers per cubic centimeter of air ff/cc) respectfully. Volume requirements for electron microscope methods should be in accordance with 40 CFR 7h3 .AHERA. the analytical laboratory. D. Tne number of samples that are required and the specific locations where they shall be taken should be established by the Industrial Hygienist. E. Aggressive sampling shall be performed with portable fans circulating air in the work area to simulate actual use conditions. The number of fans necessary for circulating air shall be determined by the Industrial Hygienist (IH). Air filtration ventilation units shall not be utilized for this purpose but must remain on at all times untii clearance has been achieved. F. .All samples at all locations shall indicate concentrations of airborne fibers less then 0.01 f/'cc for passing of the pre-clearance testing and <70 structures per millimeters squared for final TEM clearance. G. The final clearance shall be a two step process, a pre-final and a final-final set of air samples. 1. Pre-final samples shall be taken when the Industrial Hygienist (IH) on site declares area is ready for final testing. The process for this testing shall be with one layer of poly containment, decon-station. and air filtration system still in place. When samples are analyzed and all samples are found to be <0.01 f/cc then contractor shall proceed to step 2. (final-final testing). 2. Containment poly shall be removed, but decon-station, air filtration machine, and critical barriers shall remain in place and air tight. Industrial Hygienist (IH) shall take air samples in area and when air samples are analyzed and found to be <0.70 s/mm2, the Industrial Hygienist (IH) may declare area clean. Sun City Analytical, Inc. (c)copvright 1997 47 ASARCO,lnc. El Paso Power Boose Basement Abatanmt ASARCO ELP 0010883 H. When contractor fails to achieve clean air in any of the above said clearance sampling methods, contractor shall reclean area till samples achieve standards set forth above. Any and all cost arising from this extra cleaning shall be the responsibility of the contractor. END OF THIS SECTION Sun City Analytical. Inc. tclcopynsht 1997 48 ASARCO.Inc. Paso Power Hoase Hasancat Ahaiantm ASARCO ELP 0010884 SECTION 01716 DISPOSAL PROCEDURES .01 Disposal Procedures A. The Contractor is responsible for disposal of all the asbestos waste. The disposal Contractor shall be responsible for transportation of all asbestos containing waste to the storage areas, and proper containerizing of the asbestos waste. Contractor shall abide by all regulations and policies for handling regulated waste set forth by all regulatory agencies. B. On a daily basis or at the discretion of the Industrial Hygienist (IH) contractor shall remove ACM waste from containment. Contractor shall not allow excess debris to accumulate on the floor of the containment. Industrial Hygienist (IH) has the right to stop work and direct ciean-up. C. The Contractor shall coordinate transportation of waste to the EPA approve landfill with the Industrial Hygienist on site. D. The Contractor shall fill out and sign the Waste Manifest prior to departure to the EPA approved landfill. E. All dump receipts, trip tickets, and manifests must be submitted within 48 hours of dumping, unless contractor has made other written agreement with the owner or IH. F. Transportation of ACM waste shall be done in an enclosed compartment vehicle. The truck driver shall be knowledgeable of ACM spill plan carried in the vehicle. The Contractor shall be responsible for developing a spill plan in accordance with current city, state, federal regulations. G. All double bagged ACM shall be placed inside approved safety containers prior to being removed from building. Approved safety containers shall be: 1. DOT approved steel drums. 2. Cardboard type drums with sealable tops. H. Approved containers shall be moved by use of buddy system, hand trucks, or carts. I. Truck cargo or container used to transport ACM waste shall be lined with one layer of six mil poly to prevent contamination and spillage. J. Truck cargo or container shall have appropriate warning labels and shall be locked to prevent entry by unauthorized personnel. Warning signs in accordance with 40 CFR part 61 NESHAPS regulations shall be placed on the vehicle when loading and unloading Sun City Analytical. Inc. (c)copyright 1997 49 ASARCO.Ioc. Q Paso Power Boose Baseman Abatement ASARCO ELP 0010885 vehicle. K. Personnel loading asbestos containing waste shall be protected by disposable clothing including head, body and foot protection and at a minimum, half-facepiece, air-purifving, dual cartridge respirators equipped with high efficiency filters. L. Loading of any vehicle shall be closely monitored to avoid overloading vehicle capacitv. Contractor shall insure proper load bearing distribution of ACM waste. M. The disposal Contractor shall have a spill plan in effect for spills that may occur in transportation or unloading. Any bag found to be broken at landfill shall be re-bagged and area of contamination shall be cleaned up immediately. N. Asbestos waste containers shall be placed on the ground at the disposal site. The Contractor shall insure that bags are not pushed or thrown out of the transport vehicle. O. Personnel unloading containers at the Storage Site shall wear protective equipment consisting of disposable head, body and foot protection and. at a minimum, half facepiece. air-purifying, dual cartridge respirators equipped with high efficiency filters. P. Upon completion of un-loading vehicle the poly used to protect the vehicle shall be discarded as ACM waste. Any spillage discovered shall be cleaned and area decontaminated immediately by the disposal contractor. END OF THIS SECTION City Analytical, Inc. (c)copvnght 1997 so ASAKCO.Inc. El Paso Power Botsc Basantnt Abatanatt ASARCO ELP 0010886 SECTION 020S1 GENERAL REMOVAL PROCEDURES 1.01 Removal Procedures NOTE: No asbestos removal shall be done without written authorization from the Industrial Hygienist (IH) on site. Contractor shall commence all asbestos removal with PAPR or Type C supplied air, with Grade D air, unless substantial historic data (in compliance with OSHA 1926.1101) is presented to the IH prior to the pre-construction meeting. This historical data shall clearly show that the current project is compatible with the prior asbestos project and that the air counts indicate that the respirator chosen for the asbestos removal provides adequate worker protection. Under no circumstances shall any respirator be less than a PAPR respirator for any friable asbestos removal. Where there is no data to support the down grading of the respirator, the IH on site can obtain substantial air monitoring data to allow the contractor to down grade respirator. At anytime the air counts violate respirator protection value, as determined by the onsite IH. the contractor shall upgrade to the respirator the IH so designates. A. See Section 01560 and Section 01563 for minimum personnel protection. Industrial Hygienist (IH) shall authorize commencement of removal procedures. Clean and isolate the work area in accordance with Section 01527. B. Spray all asbestos containing material with amended water solution, removal encapsulant. or chemical remover using spray equipment capable of delivering a low pressure mist to reduce the release of asbestos libers. Adequately wet the ACM to the substrate. Spray the ACM continuously during the removal practices to maintain adequate wet conditions and minimize fiber release and dispersion. Follow all manufacturers recommended procedures if a manufactured product is used for removal processes. C. Saturated asbestos containing material shall be removed in manageable sections. As ACM is removed, material will be placed in a suitable container (6 mil(0.152mm) polyethylene bags or drum). Material shall not be allowed to dry out prior to containerizing. Surrounding areas shall be periodically sprayed and maintained in a wet condition until visibie material is cleaned up. D. All material removed shall not be thrown or dropped to the floor. Removal of intact and manageable sections is highly recommended as it will reduce fiber dispersion. All ACM containerized shall be carefulK lowered to the ground floor byasbestos personnel: where this is not feasible, contractor may use other mechanical means to lower containers. Mechanical means may include but is not limited to inclined chutes, scaffolding, anu pulleys, etc. E. Containers (6 mil(0.152mm) polyethylene bags or drums) shall be sealed when full. All ACM containerized shall be double lined. Bags shall not be overfilled as wet material is heavier than dry material. AH containerized material shall be sealed with suitable duct tape, do not use wire or cord as it may break the container. All containerized material shall be decontaminated on the exterior surfaces before leaving the work area. F. Large components removed intact shall be wrapped in 2 layers of 6 mil(0.152mm) polyethylene sheeting secured with tape for transport to the landfill. G. Asbestos containing waste with sharp-edged components (e.g. nails, screws, metal lath, tin sheeting) will tear the polyethylene bags and should be placed into drums for disposal. H. After completion of all stripping work, surfaces from which asbestos containing materials have been removed shall be wet brushed and sponged or cleaned by some equivalent method to remove all visible residue. Sun City Analytical. Inc. (c)copvnght 1997 51 ASARCO.Inc. El Paso Power Boose Basement Abatement ASARCO ELP 0010887 I. Clean-up shall proceed in accordance with Section 01712. J. After the work area has been rendered free of visible residues, and Industrial Hygienist (1H) inspection and approval, a thin coat of a satisfactory encapsulating agent shall be applied to all surfaces in the work area including structural members, building components and plastic sheeting on walls, floors andcovering non removable items, to seal in non-visiblc residue. (Note: 1) High temperature components such as boilers and pipes may not permit the application of some encapsulants. 2) If insulation or acoustical materials are to be reapplied to the abated area, be certain that the encapsulant selected will permit good adhesion to the substrate. A small area should be tested before application). K. Special circumstances (e.g. live electrical equipment, high amosite content of material, materials previously coated with an encapsulant or paint) may prohibit the adequate use of wet methods to reduce liber concentrations. For these situations, a dry removal method may be required. The contractor will have to acquire special permits, different from those mentioned herein from the NESHAP enforcement agencv. END OF THIS SECTION Sun Cits Analytical. Inc. (cjcopynglit 1997 52 ASARCO.Inc. H Paso Power House Basonon Abalimcc: ASARCO ELP 0010888 SECTION 02082 GLOVE BAG METHOD OF ABATEMENT Procedures A. Lock out and tag out all electrical power where actual asbestos removal will occur. B. Asbestos removal shall be perform by full containment. If glove bag method is used, then single layer secondary containment shall be erected. See Section 02081 General Removal Procedures. Glovebag Procedures A. The glovebag shall consist of a 6-12 mil(0.152-0.305mm) bag fitted with long sleeve gloves. a tool pouch and an openim: for water spray nozzle. The glovebag shall be seamless at the bottom. 1. Materials necessary but not limited to. shall be: a. glovebag b. sprayer c. HEPA vacuum u. utility knife e. nylon scrub brush f. encapsulant g. wire cutters B. A team of two persons shall perform the glovebag method. C. Before work begins, all necessary Sections of this specification shall be followed. See Section 01527 Work Area Protection, Section 01560 Respiratory Protection. Section 01562 Personnel Protection and Section 01563 Decontamination Units. D. Mix the surfactant with water in the sprayer. Bring into the work area all materials that will be used. E. Check the pipe where asbestos removal will be done, if it is damaged, wrap the entire length of pipe in poly and candv-stripe with duct tape. If pipe is abandoned, remove in manageable sections. If pipe is not abandoned, proceed with installing the glovebag. Install all glovebags before any removal begins. Seal all exposed ends with duct tape or bridging encapsulant. F. Place a sheet of poly underneath the pipe wide enough to cover the area where debris might fall to iloor. Usually 2 feet(0.61m) extending on either side of pipe. G. Each glovebag shall be installed so that it completely covers the circumference of pipe or other structure where the work is to be done. H. Glovebags shall be smoke-tested for leaks and any leaks sealed prior to use. I. Glovebags may be used only once and may not be moved. Glovebags shall not be used on surfaces whose temperature exceeds 150. J. Prior to disposal, glovebags shall be collapsed by removing air within them using a HEPA vacuum. K. Proceed with Section 01712 Cleaning and Decontamination, Section 01714 Work Area Clearance. Section 01701 Project Closeout, Section 01716 Disposal Procedures. END OF SECTION Sun City Analytical. Inc. (c)copynght 1997 53 ASARCO.Inc. El Paso Power Boose Basement Abatement ASARCO ELP 0010889 H. When contractor fails to achieve clean air in any of the above said clearance sampling methods, contractor shall reclean area till samples achieve standards set forth above. Any and all cost arising from this extra cleaning shall be the responsibility of the contractor. END OF THIS SECTION San City Analytical, Inc. (c)copyri^ht 1997 48 ASARCO.Inc. El Paso Power [loose Basement Abatement ASARCO ELP 0010890 SECTION 01716 DISPOSAL PROCEDURES 1.01 Disposal Procedures A. The Contractor is responsible, for disposal of all the asbestos waste. The disposal Contractor shall be responsible for transportation of all asbestos containing waste to the storage areas, and proper containerizing of the asbestos waste. Contractor shall abide by all regulations and policies for handling regulated waste set forth by all regulatory agencies. B. On a daily basis or at the discretion of the Industrial Hygienist (IH) contractor shall remove ACM wate from containment. Contractor shall not allow excess debris to accumulate on the floor of the containment. Industrial Hygienist (IH) has the right to stop work and direct clean-up. C. The Contractor shall coordinate transportation of waste to the EPA approve landfill with the Industrial Hygienist on site. D. The Contractor shall fill out and sign the Waste Manifest prior to departure to the EPA approved landfill. E. All dump receipts, trip tickets, and manifests must be submitted within 48 hours of dumping, unless contractor has made other written agreement with the owner or IH. F. Transportation of ACM waste shall be done in an enclosed compartment vehicle. The truck driver shall be knowledgeable of ACM spill plan carried in the vehicle. The Contractor shall be responsible for developing a spill plan in accordance with current city, state, federal regulations. G. All double bagged ACM shall be placed inside approved safety containers prior to being removed from building. Approved safety containers shall be: 1. DOT approved steel drums. 2. Cardboard type drums with sealable tops. H. Approved containers shall be moved by use of buddy system, hand trucks, or carts. I. Truck cargo or container used to transport ACM waste shall be lined with one layer of six mil poly to prevent contamination and spillage. J. Truck cargo or container shall have appropriate warning labels and shall be locked to prevent entry by unauthorized personnel. Warning signs in accordance with 40 CFR part 61 NESHAPS regulations shall be placed on the vehicle when loading and unloading Sun City Analytical, Inc. (c)copyright 1997 49 ASARCO.Inc. Q Paso Power Boice Basement Abatement ASARCO ELP 0010891 I vehicle. K. Personnel loading asbestos containing waste shall be protected by disposable clothing including head, body and foot protection and at a minimum, half-facepiece, air-purifying, dual cartridge respirators equipped with high efficiency filters. L. Loading of any vehicle shall be closely monitored to avoid overloading vehicle capacity. Contractor shall insure proper load bearing distribution of ACM waste. M. The disposal Contractor shall have a spill plan in effect for spills that may occur in transportation or unloading. Any bag found to be broken at landfill shall be re-bagged and area of contamination shall be cleaned up immediately. N. Asbestos waste containers shall be placed on the ground at the disposal site. The Contractor shall insure that bags are not pushed or thrown out of the transport vehicle. O. Personnel unloading containers at the Storage Site shall wear protective equipment consisting of disposable head, body and foot protection and. at a minimum, half facepiece. air-purifying, dual cartridge respirators equipped with high efficiency filters. P. Upon completion of un-loading vehicle the poly used to protect the vehicle shall be discarded as ACM waste. Any spillage discovered shall be cleaned and area decontaminated immediately by the disposal contractor. END OF THIS SECTION Sun City Analytical, Inc. (c)copynght 1997 50 ASARCO'lac. Q Paso Power House Basonatf Abatanait ASARCO ELP 0010892 SECTION 02081 GENERAL REMOVAL PROCEDURES Removal Procedures NOTE: No asbestos removal shall be done without written authorization from the Industrial Hygienist (IH) on site. Contractor shall commence all asbestos removal with PAPR or Type C supplied air, with Grade D air, unless substantial historic data (in compliance with OSHA 1926.1101) is presented to the IH prior to the pre-construction meeting. This historical data shall clearly show that the current project is compatible with the prior asbestos project and that the air counts indicate that the respirator chosen for the asbestos removal provides adequate worker protection. Under no circumstances shall any respirator be less than a PAPR respirator for any friable asbestos removal. Where there is no data to support the down grading of the respirator, the IH on site can obtain substantial air monitoring data to allow the contractor to down grade respirator. At anytime the air counts violate respirator protection value, as determined by the onsite IH, the contractor shall upgrade to the respirator the IH so designates. A. See Section 01560 and Section 01563 for minimum personnel protection. Industrial Hygienist (IH) shall authorize commencement of removal procedures. Clean and isolate the work area in accordance with Section 01527. B. Spray all asbestos containing material with amended water solution, removal encapsulant. or chemical remover using spray equipment capable of delivering a low pressure mist to reduce the release of asbestos fibers. Adequately wet the ACM to the substrate. Spray the ACM continuously during the removal practices to maintain adequate wet conditions and minimize fiber release and dispersion. Follow all manufacturers recommended procedures if a manufactured product is used for removal processes. C. Saturated asbestos containing material shall be removed in manageable sections. As ACM is removed, material will be placed in a suitable container (6 mil(0.152mm) polyethylene bags or drum). Material shall not be allowed to dry out prior to containerizing. Surrounding areas shall be periodically sprayed and maintained in a wet condition until visible material is cleaned up. D. All material removed shall not be thrown or dropped to the floor. Removal of intact and manageable sections is highly recommended as it will reduce fiber dispersion. All ACM containerized shall be carefully lowered to the ground floor by asbestos personnel; where this is not feasible, contractor may use other mechanical means to lower containers. Mechanical means may include but is not limited to inclined chutes, scaffolding, and pulleys, etc. E. Containers (6 mil(0.l52mm) polyethylene bags or drums) shall be sealed when full. All ACM containerized shall be double lined. Bags shall not be overfilled as wet material is heavier than dry material. All containerized material shall be sealed with suitable duct tape, do not use wire or cord as it may break the container. All containerized material shall be decontaminated on the exterior surfaces before leaving the work area. F. Large components removed intact shall be wrapped in 2 layers of 6 mil(0.152mm) polyethylene sheeting secured with tape for transport to the landfill. G. Asbestos containing waste with sharp-edged components (e.g. nails, screws, metal lath, tin sheeting) will tear the polyethylene bags and should be placed into drums for disposal. H. After completion of all stripping work, surfaces from which asbestos containing materials have been removed shall be wet brushed and sponged or cleaned by some equivalent method to remove all visible residue. Sun City Analytical, Inc. (c)copyright 1997 51 ASARCO.Inc. Q Paso Power Boose Basement Abatement ASARCO ELP 0010893 I. Clean-up shall proceed in accordance with Section 01712. J. After the work area has been rendered free of visible residues, and Industrial Hygienist (IH) inspection and approval, a thin coat of a satisfactory encapsulating agent shall be applied to all surfaces in the work area including structural members, building components and plastic sheeting on walls, floors and covering non removable items, to seal in non-visible residue. (Note: 1) High temperature components such as boilers and pipes may not permit the application of some encapsulants. 2) If insulation or acoustical materials are to be reapplied to the abated area, be certain that the encapsulant selected will permit good adhesion to the substrate. A small area should be tested before application). K. Special circumstances (e.g. live electrical equipment, high amosite content of material, materials previously coated with an encapsulant or paint) may prohibit the adequate use of wet methods to reduce fiber concentrations. For these situations, a dry removal method may be required. The contractor will have to acquire special permits, different from those mentioned herein from the NESHAP enforcement agency. END OF THIS SECTION Sun City Analytical, Inc. (c)copynght 1997 52 ASARCO'Inc. O Paso Powc Boose Basement Abatement ASARCO ELP 0010894 SECTION 02082 GLOVEBAG METHOD OF ABATEMENT 1.01 Procedures A. Lock out and tag out all electrical power where actual asbestos removal will occur. B. Asbestos removal shall be perform by full containment. If glove bag method is used, then single layer secondary containment shall be erected. See Section 02081 General Removal Procedures. 1.02 Glovebag Procedures A. The glovebag shall consist of a 6-12 mil(0.152-0.305mm) bag fitted with long sleeve gloves, a tool pouch and an opening for water spray nozzle. The glovebag shall be seamless at the bottom. 1. Materials necessary but not limited to, shall be: a. glovebag b. sprayer c. HEPA vacuum d. utility knife e. nylon scrub brush f. cncapsulant g. wire cutters B. A team of two persons shall perform the glovebag method. C. Before work begins, all necessary Sections of this specification shall be followed. See Section 01527 Work Area Protection. Section 01560 Respiratory Protection. Section 01562 Personnel Protection and Section 01563 Decontamination Units. D. Mix the surfactant with water in the sprayer. Bring into the work area all materials that will be used. E. Check the pipe where asbestos removal will be done, if it is damaged, wrap the entire length of pipe in poly and candy-stripe with duct tape. If pipe is abandoned, remove in manageable sections. If pipe is not abandoned, proceed with installing the glovebag. Install all giovebags before any removal begins. Seal all exposed ends with duct tape or bridging encapsulant. F. Place a sheet of poly underneath the pipe wide enough to cover the area where debris might fall to floor. Usually 2 feet(0.61m) extending on either side of pipe. G. Each glovebag shall be installed so that it completely covers the circumference of pipe or other structure where the work is to be done. H. Giovebags shall be smoke-tested for leaks and any leaks sealed prior to use. I. Giovebags may be used only once and may not be moved. Giovebags shall not be used on surfaces whose temperature exceeds 150. i. Prior to disposal, giovebags shall be collapsed by removing air within them using a HEPA vacuum. K. Proceed with Section 01712 Cleaning and Decontamination. Section 01714 Work Area Clearance, Section 01701 Project Closeout, Section 01716 Disposal Procedures. END OF SECTION Sun City Analytical, Loc. (c)copvnght 1997 ASARCO.Inc. Paso Power House Raonum Abatement ASARCO ELP 0010895 ASARCO ELP 0010896