Monsanto C. F. Buckley - WGK
FROM ('NAME & LOCATION)
DATE SUBJECT REFERENCE
TO
May 4, 1973 Status - PCB Environmental Control Program
J. R. Savage - B2SL-
VstJJ'ir/iiM 1 UUia' -L
v x _L
CC: G. L. Bratsch W. C. Engman M. R. Foresman P. E. Heisler G. A. Hippe P. B. Hodges - E1SF /J . Gran
D. C. Otto W. R. Richard - T-3A
I. PCB Level in Sewers
April losses at .95 #/day from operating departments and the incinerator are 10% lower than last month, in spite of continued heavy rainfall. The Waste Treatment
influent losses of 7-5 #/day is 30-% lower than last
month. The effluent remained about the same at 5.9 #/day.
A. Aroclor Department. PCB losses from the department
increased to .77 #/day from .56 #/day of last month.
B. Incinerator decreased to .11 #/day from .49 #/day of last month. High losses of last month were due probably to start-up.
C. Waste Treatment Plant. Influent losses averaged 7.5 #/day about 30% lower than last month. During this period the Rip Track washed 22 PCB tank cars.
D. Waste Treatment Effluent. The level of losses remained about the same at 5.9 #/day.
II. Project Status
. ''
-Project 3956 "Alteration to HC1 Distribution System". EDC now 6/1/73-
Project 4438 'Reduce Water Flow to Sewer". Design complete but no EDC as yet for installation.
Project 8020 "HCl Off Gas Scrubber". Equipment is on order, detail design EDC 6/15/73* No EDC as yet for installation.
IN-IQ REV. 1J 5
DSW 247360
STLCOPCB4054009
J. R. Savage Status - PCB Environmental Control Program
Pg 2
5/V73
WGK
III. Program Status
1. HC1 Off-gas. When the C/S department was down for extensive repairs, HC1 was sewered after passing through the C/S scrubber. The waste water analysis from Department 217 remained at the lower limit of detection of PCB while this was in progress. It is however impractical to operate in this v/ay for short, unplanned, periods making it necessary to continue co-ordination of the production of the two departments. The sewering valve opened 113 times due to overpressure.
. 2. Blow Tank Off-gas. No change pending completion of Project ^^38.
3. Rip Track YJashes. 22 cars were washed during the month and the accumulation in the settling tank increased to 2,500 gallons. Effluent analysis from this tank indicates continued good control.
4. Department sampling has reverted to continuous sampling following a mechanical problem with the proportional to flow instrumentation.
C. P. Buckley
J. A. Munoz
dy
DSW 247361
STLCOPCB4054010