Document vkLJEYzR78oVxX7OB19j7pGw

CHEMCEUPLANT ELANESE CHEMICAL COMPANY, INC. CERTIFIED MAIL RETURN RECEIPT REQUESTED October 12, 1981 JJF-142-81 Mr. Bill Stewart, P.E. Executive Director Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723 Dear Mr. Stewart: The Celanese Chemical Company, Inc. plant, at Bishop, plans to reclaim about 1200 linear feet of steel pipe ranging in size from 3" to 12" in diameter. This reclamation work will start October 26, 1981. The pipe is insulated with friable asbestos insulation, so insulation will be removed as the first step, and landfilled in the designated asbestos landfill located on the plant site. All precau tions, outlined in 40 CFR 61.20 - 61.23, will be observed. This letter will serve as a notification of this work, as required by 40 CFR 61.22 (d)(2). The attached data sheet lists all the pertinent data. Please contact me if you have any questions or comments. Very truly yours JJF/bjw Attachment BCC: Messrs. J. F. Harper T. L. Markham Juan Gonzalez - ABI Jaime Garza H. W. Head, Jr. File: 202.1 f Central Files (2) - CCCTC Plant Manager 062411 CELANESE CHEMICAL COMPANY. INC. BOX428.BISHOP.TEX. 78343 - TELEPHONE: 512-584-3511 Attachment NOTIFICATION INFORMATION - RECLAMATION I. OWNER: Celanese Chemical Company, Inc. II. ADDRESS: P. 0. Box 47320 1250 West Mockingbird Lane Dallas, Texas 75247 III. DESCRIPTION: Remove friable asbestos insulation from 1200 linear feet of steel pipe ranging in size from 3" to 12" in diameter. IV. ADDRESS OF SITE: Chemcel Plant Celanese Chemical Company, Inc. P. 0. Box 428 Bishop, Texas 78343 V. STARTING AND Start - October 26, 1981 COMPLETION DATE: End - November 10, 1981 VI. NATURE OF RECLAMATION: See III above. VII. PROCEDURE: Wet insulation thoroughly, strip off insulation, pack in plastic bags and landfill in registered (on-site) landfill. VIII. LANDFILL SITE: Texas Department of Water Resources Registration #30084 EPA I.D. #TXD 008113441 002412