Document vj9XraMgz7rr68YyLRnn368E

Region 6 - Enforcement & Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media Program: Regulatory Program(s) Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Phone Number Facility Contact: 2/25/2020 Water Brine - CWA Pemco, LLC Stuart Unit 36.429628, -96.156387 Skiatook, Oklahoma 74070 1102 N. Lenapah Ave. Skiatook, Oklahoma 74070 Osage County 918-521-3086 Rick Coody FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: N/A OKU000801 N/A 21111 1311 Personnel participating in inspection: Kent W. Sanborn EPA 6 ECDWE Environmental Engineer EPA Lead Inspector Signature/Date Supervisor Signature/Date Kent W. Sanborn Digitally signed by Kent W. Sanborn DN: cn=Kent W. Sanborn, o, ou=6EN-WR, email=sanborn.kent@epa.gov, c=US Date: 2020.03.26 09:35:41 -05'00' Kent W. Sanborn GUY Digitally signed by GUY TIDMORE TIDMORE DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=GUY TIDMORE, 0.9.2342.19200300.100.1.1=68001003655426 Date: 2020.03.31 16:16:53 -05'00' Guy Tidmore Date 31 MAR 2020 Date 6ENFORM-020-R8.2 (02/12/2020) 1 Section I - INTRODUCTION Pemco, LLC/ Stuart Unit Inspection Date: 02/25/2020 PURPOSE OF THE INSPECTION EPA Region 6 inspector K.W. Sanborn visited the Pemco, LLC oil and gas facility located near Skiatook, Oklahoma on 02/25/2020 for an unannounced inspection. There were no representatives of Pemco, LLC present for the inspection. The inspection was conducted by authority of the Clean Water Act and the Safe Drinking Water Act to determine compliance with the Environmental Protection Agency (EPA) regulations. FACILITY DESCRIPTION This facility is known as the Stuart Unit and has a historic EPA enforcement action (compliance order) still open at EPA Region 6 (Docket No.: CWA-06-2015-1741). The inspection was conducted as a follow up to this enforcement action to reassess the facility's compliance with the Clean Water Act. The lease was shut down and the plumbing was disconnected at the tank battery and storage facility for produced water (SWF). There was not an injection pump on site at the time of the inspection, as well. Section II - OBSERVATIONS I observed the lease was inactive. There was no secondary containment at the tank battery. I observed old surface damage east of the pit down the hill near the tank battery. With a calibrated YSI Pro 30 conductivity meter, a Total Dissolved Solids (TDS) reading was measured at the pit with fluids in it at the facility. The TDS measured 938 milligrams per liter (mg/L). Section III - AREAS OF CONCERN The tank battery equipment was still present on site on the inactive lease. Section IV - FOLLOW UP EPA water enforcement will refer this facility to EPA Region 6 SPCC program. Section V - LIST OF APPENDICES N/A 2