CHAPTER 67
1962 Guide And Data Book
temperature and a rink surface averaging one inch thick, a thermostat bulb temperature is satisfactory at 26 F for hoc key, 27 F for figure dealing; and 28 F for public skating.
Temperature Control
Modem refrigerating equipment in a skating rink, as now installed, is usually completely automatic. The starting and stopping of the compressor motors and auxiliaries is governed by a thermostat located either in the brine line or in the ice surface. Hie thermostat should have no more than a 2 F deg (plus or minus one degree) differential, and be of a type that is easily adjustable to compensate for rink usage and ice thickness.
In multi-compressor ingt-allatinns a two-step thermostat is used with a time lag between steps. Motorized controls are used for more than two compressors.
Rink Piping
Many methods have been used to convey the freezing
mfldhim in an ice surface, and a number of patents have
been granted, but all of them eventually have been aban
doned. Today, standard mild steel or wrought iron pipe is
used as well as polyethylene and API plastic pipe. The size
of the pipe depends on the length of run of pipe. Small rinks
can use % in. pipe, larger rinks use 1 in. and 1X in. pipe. For
medium service 1> in. pipe may be used in hairpin loops on
rinks up to 183 ft long, or a total run up to 370 ft. The length
of the single feed is determined by the quantity of brine to be
pumped through each circuit to maintain the recommended
brine temperature range and the permissible brine pressure
drop. The uual pressure drop through the rink piping is 6 to
8 psi with brine flow velocities in the range of 130 to 150 fpxn.
When IX-in. piping is used it should not be placed on
more than
in. centers as a decrease in freezing rate be
tween piping becomes noticeable. The actual piping centers
are determined from the refrigeration load, although when
Hiring lyi in. pipe, 4 in. centers are usually sufficiently dose.
On heavy duty or long rinks about 200 ft long, it may be de
sirable to place feed and return headers at opposite ends of
the rink, or hairpin eoils may be arranged to run the width of
the rink with brine headers extending down one side.
Present practice is to weld all piping and headers, eliminat
ing all threaded joints wherever possible. Welding may be by
arc or oxyacetylene method, but care should be taken to use
tire correct welding rod.
Recently, in some curling rink installations, aluminum
tubing has been used successfully with circulated glycol
brine. Aluminum tubing must not come in contact with ma
terials which may set up corrosion in the Aluminum.
Piping supports. When rink surface is of the open type vith sand fill under and between the piping, the piping <n ^ upon pressure creosoted sleepers.
Use of pipe separators or pipe rests having a steel rod for supporting the piping is preferable to laying the piping dj. rectiy on the creosoted sleepers because they minimi^ eom>. sion at the point of contact of pipe to sleeper.
If the rink surface is of the permanent floor type, a chair type support resting on steel plates or creosoted sleepers is often used. T-iron supports are not recommended.
Brine headers. Many systems of brine distribution mpd in the past proved failures because designers attempted to distribute the brine by a system of branch feeds, loops, and valves, and because' the numerous thu^ed connections on valves, tees, elbows, air vents, etc. faii^ through early corrosion. Uniform brine distribution was often upset due to the use of brine circulating pumps of too small capacity.
Good design requires a balanced system of feed and return headers, designed and sized for low velocity and copious brine flow. This makes it unnecessary to control brine dis tribution with valve adjustment because an even brine flow through all rink pipes is always assured. Hie return brine header should be placed higher than the feed header, with one or two air vents to keep the rink piping free of air.
The balanced flow diagram (fig. 4) is one of several good designs. With this flow system there is less restriction to brine flow at any point and the distribution is uniform re gardless of tiie quantity of brine circulated. The loss in brine pressure is less, and the friction head generally is lower. However, it is sometimes desirable to have valves for in stallation and operation. Should it be impracticable to have the return brine header higher than the feed header, an air evacuating system may be required.
To allow for contraction and expansion due to variation in seasonal temperatures, precaution should be taken to allow for the free movement of the rink piping as well as the brine headers.
Brine. To minimiTM corrosion of the CaGi brine, the system must be kept free of air. The brine should be tested for pH, so that the recommended value of 6.8 to 7.2 can always be maintained.
Expansion Tank
A closed system of brine distribution should always be used. A balance or expansion tank should be installed and should be sized for brine volume in system and temperature rise of brine.
Brine Heating for De-icing
For auditorium sports arenas, provision must be made for de-icing the rink surface in less than 4 hr. In practice, the floor is heated to about 50 F so that the ice can be peeled off by breaking the bond between floor and ice, and can be broken and removed with power tractors.
A standard all-steel steam water heater can be used with passes so arranged that all the brine can be pumped through the beater, with the brine flowing in the tubes and the steam in the shell.
Approximately 350 Btu per hr heating capacity per sq ft of rink surface is recommended for heating the brine is the cooling system in order to warm the floor and break the ice bond.
Cold Brine Accumulators
In sport arena rinks designed for frequent de-icing, i* may be required every other day, and % in. ice or more must
Skating
ICE PIPE CUPS FOR SPACERS.
- PIPES //--SAND FILL.
, TEEOSOTEP SLEEPERS 'natural ground
Fig. 5 ... - Open or Sand Fill Floor
ICE TECCAT20 HERRING BONE SUPPC
FLAT BAR PIPES
;ONCBET
715
be frozen in 12 hr to allow for the ice to temper before skating on following day. In such cases, it is advisable to provide a cold brine accumulator to keep the size of the refrigerating equipment and connected horsepower within reasonable Omits. This accumulator is a brine storage tank bypassed from the heating cycle so that, when refrigeration on the ice surface is not required, a large volume of brine may be cooled to approximately --25 F and be ready to be pumped into the rink piping as soon as it is needed.
The cold brine accumulator should store sufficient brine to cool the entire brine volume in the cooling system from 65 to 0 F. This cold brine tank usually holds more than three rimgg the volume of the cooling system's brine charge.
GBnIERAL rink floor design
(There are several patented floor and brine flow designs which fnnnt be evaluated without consideration of oost.)
Generally, there are four types of rink surface floors:
1. Open or sand fill type (Fig. 5). 2. Permanent general purpose type with piping imbedded in concrete (Fig. 6). 3. All purpose type with piping embedded in coocrete with floordab insulated (Fig. 7). 4. All purpose floors supported on piers or walls (Fig. 8).
The open type sand fill floor is the least expensive type of rink floor. Hie cooling pipes rest on wood sleepers over a bed of sand, crushed stone, or other fill. The clean washed sand b filled in and around the cooling pipes. Curiing rink floors are tonally constructed in this manner, as well as hockey and skating rinks where first cost is a factor, and the building is not intended to be used for other purposes. Gay or cinders should never be used in the bed or for fill around the pipes.
To obtain a better return on investment, most rinks now have a permanent general purpose concrete floor so that the floor may be used for other purposes when the skating season is over, such as for exhibitions, meetings, circuses, roller skating Hanging boxing, tennis, and other events. Rinks with such type floors have been used for all-year skating.
Fig. 7 .... All Purpose Floor
Generally the concrete floor is topped with terraszo, but, becafpw of the lower first cost, the road type asphalt floor has occasionally been used with indifferent success and is not recommended.
Recently several rinks have been installed using what is called a bituminous concrete floor. This is similar to the ma terial used for black-top road construction. This materia! is poured into place hot at approximately 300 F and then rolled level. While the conductivity is less than Portland cement type concrete, the reduction in heat transfer has not been reported a serious handicap providing the thickness of as phalt is not over M in. This material should not be confused with a similar material used for tennis courts which has been reported entirely unsatisfactory.
Rinks in sports arenas, as well as all purpose rinks, are usu ally constructed in large cities where hockey is played on certain days of the week. When the game is finished, the ice is removed and the floor made ready for other sports and en tertainment. The ice floor must be of such construction that it will stand the frequent change from hot to cold, and the refrigerating machinery must be of sufficient capacity to freeze a in. thick sheet of ice in 12 hr. This type of floor it almost always insulated.
Many patents have been granted for permanent floor construction. Some have stood the test of time, others have not been successful. They have been built on top of wood insulation; on wood floors; in steel pans; and made of com posite steel double walls supported on channels with brine circulated between the two sheets of steel, the channel form ing the passages. Others had brine sprayed againt steel pan to form the ice surface; square tubes were also used instead of round pipes; extra heavy pipe instead of standard weight; wrought iron instead of mild steel pipe; and a cinder base in stead of crushed stone or gravel fill.
The permanent general purpose rink floor constructed in
HERRING BONE SUPPORT CREOSOTED SLEEPER CONCRETE .TAR FKPER--
SAND NATURAL GROUND ' Fig. 6 .... Permanent or General Purpose Root
* NATURAL GROUND
SHEET STEELOB FRAMING
fig. 8 .... Permanent or All Purpose Floor on Piers
'] i j