CONCEPTUAL CLOSURE PLAN gtf/MPDES PERMIT APPLICAT
-
I
O
^
N
^.
HO.
^WWV0
017
610
166
(Letter. W. M. Stewart to Dr. L. Eli McCoy. Chief, OWR. 5/26/93)
BCC:
J. B. Alien. Legal. D7156 F. Seputveda. Mnin.. D-13098-4 T. D. VanxleTI, Bellevue J. L. Riddle, B"12220 E. J. Lutz, DERS L. D. Riegel, DERS In Turn:
H7~D. Ramsey
T. L. Eichstadt M. S. Eaton, Jr.
W. M. Stewart
In Turn: ----CTT. Muska
L. K. Ireland R. S. Hefta File: 33.05.02.05 T. R. Waldron H. D. Bickerstaff R. J. ZtpfeT 6. Woytowich In Turn: ----CTT. Alt
E. E. Raroos D. A. Weber
D. J. Harbison N. J. Bittner
/hew 8444-4
EID939403
CT7 REV. KHO
CMD
WASHINGTON WORKS P.O. Box 1217
PARKERSBURG.WV 26102-1217
DU FONT POt-YMERS
CC: Randolph M. Sovic. Branch Leader Industrial Branch
MV-DEP. OWR
1201 Greenbrier Street Charleston, MV 25311
David L. Chaney, Geologist Permits Branch
WV-DEP. OWR
General Delivery HcArthur, MV 25873
May 26, 1993
CERTIFIED LETTER RETURN RECEIPT REQUESTED
Dr. L. Eli HcCoy. Chief Office of Water Resources WV Division of Environmental Protection 1201 Greenbrier Street Charleston, West Virginia 25311
RE: Letart Landfill SW/NPDES Permit Application No. WVQ076066
Dear Dr. McCoy:
This
letter summarizes
May
1993
our understanding of the regarding the conceptual
agreements reached
closure plan for
in
the meeting held on
6,
DuPont's Letart Landfill. Participants in the meeting were:
WV-DEP, DWR -
R. M. Sovic. Branch Leader, Industrial Branch D. L. Chaney, Geologist, Permits Branch
DuPont
- W. M. Stewart, Environmental Manager T. D. Vandell, Core Group, Hydrogeolist E. J. Lutz, DERS, Engineer
The following is a summary of the discussion:
A closure submitted
permit
to you
application for DuPont's Letart Landfill will in July 1993. The closure permit application
be
will
conform to the format of the existing operating permit application,
and and
will include the conceptual closure design,
updated operational and geologic data. The
a closure schedule, post-closure ground
and surface water monitoring plan will be submitted in 1994, after
we have collected enough water quality data to verify the
constituents of concern to be monitored for following closure.
8444-1
BETTER THINGS FOR BETTER LIVING
EID939404
Dr. L. E!i McCoy
-
2 -
May 26, 1993
The conceptual closure plan (handouts attached), as presented at the
Hay 6, 1993 meeting, addresses the issues included in the West Virginia Solid Waste Management Regulations. Assumptions made for
the conceptual design will be verified in order to complete the final detailed design. This will be accomplished by field and laboratory testing. Cap construction details and all detailed design specifications will be based on and supported by this data, in accordance with accepted engineering practices.
It was agreed that the closure schedule, as presented at the
May 6, 1993 meeting, will be changed to reduce the completion time for the Health and Safety Plan (HASP), and to move forward the start-up time for field activities. The requirement for Administrative Notice is to be deleted.
The approach to developing the long-term ground and surface water monitoring program is acceptable to the WV-DEP and includes the following changes to our March 3, 1993 submittal:
- There will be at least four quarters of water quality sampling for both surface water and ground water versus two that DuPont proposed in the March 3. 1993 sampling plan.
- Second quarter water quality monitoring will be conducted according to our March 3, 1993 submittal, but due to very limited yields from most of the wells, the parameters included for future analyses will be reduced and re-prioritized based on the constituents present. These proposed sampling changes will be submitted to the WV-DEP for approval before the third quarter sampling is carried out.
- Because total and dissolved metals concentrations are similar due to the low TSS in the ground water, total metals concentrations are representative of metals concentrations in the ground water at Letart. DuPont agrees to monitor only total metals concentrations in the ground water.
- It was agreed that, based on the requirements, there is sufficient
coverage of the F-Zone at Letart with the existing monitoring wells (1 upgradient and 3 downgradient). However, DuPont will
conduct a field investigation to the northeast of the active portion of the landfill to identify any seeps that could also
serve as ground water monitoring points.
- Water quality data from the analyses conducted to-date, demonstrate that anaerobic biodegradation is not occurring in the shallow zones at LMWs 1, 4, and 8. Therefore, we will discontinue the additional analytical parameters included for this evaluation.
8444-2
EID939405
; ' . Dr. L. Eli McCoy
-
3 -
Hay 26. 1993
Due to the difficulty associated with remediation and reversing
existing natural aerobic conditions to anaerobic in low permeability zones, such as those encountered at Letart, the affects of hazardous constituents at Letart will be evaluated using a risk assessment approach. Regulation 4.11.5 of the Solid Waste Management Regulations states that where there is ground water contamination, the Chief may require appropriate corrective or remedial action. and such action "shall take into account any applicable ground water quality protection standards, the existing use of such waters, the reasonable uses of such waters, background water quality, and the protection of human health and the environment". He interpreted this to mean a risk assessment approach could be used in completing this evaluation. The new West Virginia ground water
quality regulations will also be reviewed.
We appreciated the opportunity to review our plans for closing the Letart Landfill with the members of your staff.
If you have any questions or need additional information, please
contact me at (304) 863-4271.
Very truly yours,
1/^M^^
W. M. Stewart Sr. Environmental Washington Works
Control
Consultant
/hew Attachments