Document vVOGzEGj0vayxKJdkr6eBOvL8

PLAINTIFF'S i| EXHIBIT IS DOW-134 ! DOW CHEMICAL U.S.A. July 17, 1986 LOUISIANA DIVISION P. O. BOX 160 PLAQUE MINE. LOUISIANA 70766-0160 604 386-8000 Bob Morgan Legal Department Building 2306 cc: Dean Cooper Mike Nevill Bruce Heinze Terry Campbell Roddey Peebles APPLICABILITY OF LESHAP REGULATIONS TO PROPOSED ASBESTOS PROJECTS We would like your opinion as to whether three proposed asbestos pro jects are subject to the notification requirements of 76.6 of the Louisiana Emission Standards for Hazardous Air Pollutants. The three projects are completely independent of each other. ASBESTOS STORAGE Attachment 1 is a description of the Asbestos Storage project. The only potential for asbestos emissions would be when a baj bursts and the amount of emissions in such a case would be very small and cer tainly there would be "no visible emissions" as required by the regu lations. Any spilled material will be cleaned up by means of an OSHA - approved vacuum cleaner. Since the project will not result in any emissions, we do not believe that it should be classified as a "modification" under 76.2, and also it should not require a permit. However, it is not clear if notification of the DEQ is required under 76.6. CATHODE WASH SYSTEM UPGRADE The method for removing asbestos from the cathodes will be changed in order to improve the asbestos handling procedures and to minimize per sonnel exposure. Currently, some of the asbestos must be manually removed from the sump and then spread on to a concrete surface (while covered with a plastic sheeting) in order to remove sufficient water by drainage to allow disposal in a landfill under the current RCRA regulations. After the asbestos has been removed from the concrete, the surface is thoroughly washed down to prevent the formation of any residue which could dry out and become airborne. ST0108282 AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY -2- The new project will eliminate the need for manual removal of asbestos from the sump and will also eliminate the need to spread the material out for dewatering. Thus, the potential for emissions will be reduced even further than at present. Currently, there are "no visible emissions" and monitoring by OSHA methods indicates very low levels of airborne contamination. Therefore, the project should not be classified as a "modification" nor require a permit, it is not clear, however, if the notification requirement of 76.6 is applicable. EXPANSION OF PRODUCTION CAPACITY Attachment 2 is a copy of the LESHAP Source Report of July 9, 1984 as required by 81.5 (a similar report was also submitted on September 16, 1983 as required by 76.11). As noted in Item 3, the average amount of asbestos used at that time was 35,500 pound/month. The expansion will permit a maximum usage of 44,000 pound/month (an increase of 12.7*). Physical changes costing about $60,000 were required in order to increase the capacity. Again, there will be no increase of emissions as a result of this project and, therefore, it should not constitute a "modification" nor require a permit, but is notification required under 76.6? We would greatly appreciate a written response as soon as possible. Bob Kalish Environmental Services ST 0100283