Document vV7NVNr9Gqp7XQ9oype5JRJJ6
PLAINTIFF'S EXHIBIT
CHEVRON PRODUCTS COMPANY MANUFACTURING DEPARTMENT EL PASO,TEXAS
SPECIFICATION NO. EP-397-A August 22, 1980 (JKG) Page 1 of 6
SPECIFICATION NO. EP-397-A RUBBISH AND GARBAGE REMOVAL
EL PASO REFINERY
1.0 SCOPE
..
1.1 This Specification covers thSumishing of personnel and equipment required for removal of rubbish and garbage at the El Paso Refinery as requested by COMPANY.
1.2 This Specification supplements:the Contract Terms and Conditions of the Environmental Services Agreement dated August 1, 1996 (Pages 1 - 9), between Chevron Products Company STO SBP Corporation dba El Paso Disposal. In the event any discrepancy is deemed tojexist between this document and said Terms and Conditions, the provisions oTrfie latter shall be controlling.
2.0 GENERAL .. _ _
=_
2.1 CONTRACTOR will abide by the rules and regulations as set forth in El Paso Refinery Rules and Safety RegulationstTEI Paso Refinery Rules and Safety Regulations supplements the Contract Tefffis and Conditions of the Environmental Services Agreement dated August 1, T9S6 (Pages 1 - 9), between Chevron Products Company and SBP Corporatidfrdba El Paso Disposal.
2.2 Any equipment requirement,TStrvice, or additional instruction to CONTRACTOR that does not constitute a contracTthange, must be transmitted on an "Authorization". The "Authorization" may be inTfiated and authorized by the Company Representative and the agreement may be commenced immediately. Example: An "Authorization" would be required for the COMPANY to authorize one or more extra rubbish containers for use at special Ideations such as various short duration plant maintenance turnarounds.
2.3 Any equipment requirement, KSTvice, or additional instruction to CONTRACTOR that does constitute a contract change must be transmitted on a "Change". A "Change" would be required for the COMPANY to authorize an increase or decrease in the cost of any rubbish containerftlquired for use at regular locations.
Revised 8/96 (RLG)
WORD:\CONTRACT\SPECIFI\EP-397A.ClD
Chevron BB
015042
CHEVRON PRODUCTS COMPANY MANUFACTURING DEPARTMENT EL PASO,TEXAS
SPECIFICATION NO. EP-397-A August 22, 1980 (JKG) Page 2 of 6
3.0 DETAILS OF THE WORK
6-Yard Containers
3.1 CONTRACTOR shall furnish ruBlaish containers at regular locations as outlined in 3.11 below and service each regular container two times per week, on Tuesday and Fridays of each week.
3.11 Regular refinery location?, location numbers, rubbish container capacities, and refinery accesses Win be as follows:
Refinery Location Number
1R 2R 3R 4R 5R 6R 7R 8R 9R 10R 11R 12R 13R 14R
Container^Capacity" Cu. Yd.
6501 Trowbridge Regular Refinery
Location
6-
SW corner of Refinery
Training Building
6 SE corner of l&E
Building
6 NW corner of Main
Shops Building
6 -- North of CPL Maint.
Building
6 * NE corner of Octane
Test Lab
6 = NE corner of Octane
Test Lab
6 -- East of GOU Control
House
6 ~ West of CO Boiler,
F-1803
6 South of No. 6
Control House
6 South of No. 4/7
Substations
6 North of Tool Room
6 East Area 2&3 Maint. Shop
6 ^ North of Area 1 Maint. Break Room
6 " Southwest corner of Carpenter Shop
Accessed By Main Street Main Street Hill Road Industry Road Entrance Road Entrance Road Airline Way 1 st Street 1st Street Rack Street Main Street Main Street Field Road Hill Road
Revised 8/96 (RLG)
-- WORD:\CONTRACT\SPECIFI\EP-397A.ClD
Chevron BB
015043
CHEVRON PRODUCTS COMPANY MANUFACTURING DEPARTMENT EL PASO,TEXAS
SPECIFICATION NO. EP-397-A August 22, 1980 (JKG) Page 3 of 6
Refinery Location Number
15R 16R 17R 18R 19R 20R 21R 22R 23R
24R
25R
Container Capacity --
Cu. Yd.
6500 Trowbridge Regular Refinery
Location
6 Purchase and Stores
6 ^-- South of CPS Control Room
6 Boiler Plant
6 Front of Praxair Plant
6 Front of Praxair Plant
6 Fire House 6 Alky Control Trailers
6 * West of Main Control House
6 FCC Unit
6 -S Coker Plant
6 is Maintenance Pipe Shop
Accessed By
Allen Wells Road
Allen Wells Road
Main Street
Main Gate
Parking Lot
Control House Road
Control House Road
Control House Road
Christopher M. O'Neil Road
Christopher M. O'Neil Road
Allen Wells Road
The regular marketing rubbish iggntainer location, capacity and access will be as
follows:
..
Number
CapacityCu. Yd.^r _______ Location_______
Accessed By
1M
6
Warehouse-Marketing
Trowbridge
and Storehouse
Avenue
3.12
El Paso Refinery Mapshfpr North and South shows the regular location and location number of eagBLrubbish container required throughout the refinery and marketing facilitie's' located at 6500 and 6501 Trowbridge and are a part of this Specification. TTT
3.13 Revised 8/96 (RLG)
CONTRACTOR shall notify COMPANY if, as determined by use, the capacity of individual (rubbish cmitainers, as shown in 3.11 above, is incorrect and requires an increase oTJjecrease in size. If either case exists, a "Change",
ui word:\contract\specifi\ep-397a.cld
Chevron BB
015044
CHEVRON PRODUCTS COMPANY MANUFACTURING DEPARTMENT EL PASO, TEXAS
SPECIFICATION NO. EP-397-A August 22, 1980 (JKG) Page 4 of 6
must be initiated so aigytually negotiated increase or decrease in COMPANY payments may be effected by modification to the contract.
3.2 CONTRACTOR shall furnish rubjjish containers at special locations, for specified durations, as authorized and directed by COMPANY on an Authorization.
3.3 CONTRACTOR shall provide additional service for any regular and/or special location rubbish container as authorizcijnd directed by COMPANY on an Authorization.
3.4 CONTRACTOR'S trucks must Jg_ weighed in and out of the refinery at the Asphalt Plant scales.
20-Yard Through 30-Yard Roll-off ConTSiners
3.5 CONTRACTOR shall furnish roll-pff containers at special locations, for specified durations, as authorized and dlgcted by COMPANY on an Authorization.
3.51 CONTRACTOR shall furnish roll-off containers with supplies (polyliner) as authorized and directed by COMPANY on an Authorization.
3.52
CONTRACTOR shall furnish roll-off containers to be used for the temporary storage of insulation sgjitaining asbestos fibers as authorized and requested by COMPANY on an Authorization.
General ..
_
^
3.6 CONTRACTOR'S trucks shalLgTter and exit the refinery through the Main Vehicle
gates off Trowbridge Drive forall containers located inside the refinery at 6500 and
6501 Trowbridge.
jj=
3.7 COMPANY will maintain free lad clear accessibility to each container for CONTRACTOR'S service equipment.
4.0 CONTRACT PRICE
_
4.1 COMPANY shall compensatetOONTRACTOR for service and equipment in accordance with the latest approved revisWn of the Compensation Schedule, Exhibit A.
4.11 6-Yard Containers Ls;
4.111 COMPANY agrees to pay CONTRACTOR for regular container locations, theitfionthly lump sum price as shown in Section I of Exhibit A, PaglTl of 2.
4.112 COMPANY agrees to pay CONTRACTOR for special container locations and/gr additional service in accordance with Sections II and III of Exhibit ATIPage 1 of 2.
Revised 8/96 (RLG)
WORD:\'CONTRACT\SPEC!Fl\EP-397A.ClD
Chevron BB
015045
CHEVRON PRODUCTS COMPANY MANUFACTURING DEPARTMENT EL PASO,TEXAS
SPECIFICATION NO. EP-397-A August 22, 1980 (JKG) Page 5 of 6
4.12 20-Yard Through 30-Yatj Roll-off Containers
4.121 COMPANY agrees to pay CONTRACTOR for roll-off containers at special iocationOnd special roll-off supplies in accordance with Sections I and If of Exhibit A, Page 2 and 3 of 3.
4.2 In the event of any increase ofSecrease in any service rate or equipment rate prior to the termination of this contEJJt, CONTRACTOR shall notify COMPANY of the changes by submitting new raTTproposals, in writing, for approval. Acceptance by COMPANY may be in whole of part, and single service rates or equipment rates, as well as the entire proposal, may be subject to negotiation and compromise prior to acceptance of a modificatidfrto contract by COMPANY. No change will be considered approved until a duly authorized contract Change is processed.
5.0 ENVIRONMENTAL PROTECTION RESPONSIBILITY
5.1 Except as specified in Sectio/fJL2 below, the words "rubbish" and "garbage" as used throughout this SpecificfiHBn apply only to refuse which will impose no adverse effect upon the environment. CONTRACTOR'S rubbish containers will not be used to dispose of hazardous, regulated, or controlled waste such as asbestos insulation, oil-soaked rags, catalyst and/or chemicals in measurable quantities, large quantities of scrap wood and/qonetal, etc. COMPANY will appreciate CONTRACTOR'S notification sjjny disposal rule infraction, as observed during routine service calls, so inadvegpnt mistakes may be corrected prior to hauling rubbish and garbage out of the refinery.
5.2 At times a segregated contairifTwill be used for temporary storage of asbestos insulation. Access to this codtglner shall be restricted by COMPANY.
6.0 ACCOUNTING OF CONTRACT COSTSX
6.1 CONTRACTOR shall keep an accounting of all service and equipment furnished to COMPANY and shall submit, agon request, information as required by COMPANY.
6.2 . Invoicing Instructions
6.21
CONTRACTOR shall, for COMPANY'S accounting purposes, furnish invoices
in accordance with Paragraph 2 of the Contract Terms and Conditions, of
the Environment Services Agreement dated August 1, 1996 ( Pages 1 - 9),
between Chevron Products Company and SBP Corporation dba El Paso
Disposal.
JX
6.22 CONTRACTOR shall furpish one copy of the invoice when submitting a bill to COMPANY for payment.
6.23 Revised 8/96 (RLG)
Invoices should not include sales tax. COMPANY'S Direct Payment Exemption CertificatefrFpart of the contract agreement.
WORD:,CONTRACT\SPECIFI\P-397A.CLD
Chevron BB
015046
CHEVRON PRODUCTS COMPANY MANUFACTURING DEPARTMENT EL PASO,TEXAS
SPECIFICATION NO. EP-397-A August 22, 1980 (JKG) Page 6 of 6
6.24 All invoices shall be seniTo:
Chevron Products Company
Invoice Desk, Refinery Accounting
P. O. Box 20002
~
El Paso, Texas 79998
7.0 INFORMATIVE
_____
.
7.1 The following blank COMPANY forms are included with this Specification for CONTRACTOR'S information: TSL
7.1 1 Authorization 7.12 Contract Change
--
efinery Materials Manager
Revised 8/96 (RLG)
WORO:\CONTRACT\SPECIFI\EP-397A.CLD
Chevron BB
015047