Document vBzeLpNVm0Yngzd7Na99dDM1Z

FILE NAME Colonial Sugar Refinery CSR DATE 1962 Apr 11 DOC CSR096 DOCUMENT DESCRIPTION Govt Inspection Results - Ventilation Australian Blue Asbestos Ltd - Wittenoom - High Dust Counts & Failure to Address the Issue ewe PLAINTIFF'S EXHIBIT . The State Hining Engineer vO Nines Department a PERTI - 64 KAIGCOFLIE .11th .11th April 9162 . . ; Wittenoom Wittenoom .- Simmons . Herewith Herewith in duplicate a | reportby Inspector . > paragraphMunrd.eSritmhmeonheehaadsinsguGmmeendeurpalconocnicsonceislelyy inhis opening ventilation~VcionsduitailonIsInnsppeceticontsi:o-ns aloneare uselessas regards 4 Administration There no Kine > is doubt that the is making some attempt to improve conditions and that the . underground department department has taken the lead in this direction . with the result that the past twelve months general underground mining conditions have improved beyond my expectations the crux of the matter le ventilation UHndoewregvreorund Ventilation The eurouits are being approached in a realistic manner and wan the work of isolating the ventilation circuits in both the upper and lower is completed far better conditions till prevail It appears to mo that although the Management is making some attempt to control dust generated in the Section they are not approaching the situation ir the correct manner The inability of the present dust collecting systen is well knownto all and Mr. Simmons says that dust is being generated at all points yet we also note that Hr Simmons through reanrks on increated dust will be generated It must follow that more Simmons cannont agree I with Inspector remarks in paragraph 2 page 2 of his report I fail to see total and concerted effort on the part of the Management and the SupervisorSs upervisors in the matter of improving conditions A Studyof the Tabulation of Dust Counts shows the following 1- Count . Remarks . 370 100 from ducting 1000+ . Boring from ducting 370 Ducting extended to face 220 . 300 _(t. .Ducting Boring - 60 from ducting Preparing to bore - de dpocket ventilation 520 _ . Boring dead pocket ventilation 350 1000+ 0 . Ducting extended towards face. Doad pocket ventilation dirt dry & dusty | 70 410 410 + . Sr we. damaged Vent split dust delivery poor was and 40 from faci Dirt vent was extended and dirt voter Duct150 negligible From Duct ela Tt ** 828 828 - ; 1000+ ; down before work 70 from faceface was commenced ; Delivery to face - face end . t obs ao wee rs . These bad conditions were found by an intrector when everyone in the mine would know ho was present It must follow that such bad conditions cotion practice and must be known to the Management and Supervisors emplyees I must agree that the emplyees are not operating but at the some time I must also that it is the Karagamnets responsibility through Supervisors to mein- Clean Houockeeping and to settle domestic probles.6 . Conese --- an If Inspector descrepancies the they would before more mus tobuleted are found by roustat absent : .. It may be that the number of Superviscera is insuffi- 6, the wu...) 6. 1. cient and that Supervisors carnet maintain corrrect or adequate contact with their sen this matter will be checked ; However if a Supervisor finds continued unsefe practise he ae . should check on the matter - --. tne i . eee in the of An i have of Mines are not to carry Supervisors It is the past often stated Inspectors out the Cuties of Bederground Managor's responsibility Bederground enforce the Requirements of the linea Regulation Act and Pogulations on his mine and if his policy a ^fingufficiertthen we vill have to Act to ensure that he meets his obligations correctly .- I intend to maintain eloce usted on the position time will time myself make a - visit to Witterson in DS Catonelle . Cr e sa? The Benior Inspector of Mines , Mines Department . | KALGOORLIEL Ventilation Colonial Australian Eln^'Asbestos Ltd. : ae Colonial Mine- Wittenoom __. on act inspection Accompanied by I carried Assistant Inspector Murphy day shift on an inspection during A check inspection during afternoon shift order one was done in gain an overall : if picture also tren an d y partial airflow survey of _ the Colonial Mine done As the work of isolating the upper and lower seem circuits is not complete no value could be gained from a complete` survey An inspection of the treatment plant was also carried Ce : . Visually conditions throughout the mine generally appear to be at last approaching the satisfactory level The recorded however dust counto concentrations This is particularly shift when the only bad areas were still show above normal evident on afternoon 41 X. and 42 N. lower seam but from the recorded dust counts all areas visited -showed high dust concentrations The following figures are of interests Average dust count on n e oe e on ; day June shift for , RnR November , . 1960 = 230 19610 80 2 p.P.C. p.p.c. hour vo 7 ba * > Pal - oo Coweta Ln ^' 8 8 8 - - afterno n afternoon --*August ' 2 March =" November St a Lt | August 1961 420 p.P.C. - 19632 70 p.p.c. 1960 - 110. P.P.C. 2 hour break 1961 630 p.p.o. . The check points conditions following figures are those obtained from our i.e. An average section of the working coo ; Average dust count on afternoon shift for October 1961 - 750 . bal bd . P.P.Cal " bed December 1961 - 275 bal bal . J bal bad * day fi * Narch . 1962 - ... 660 P.P.C. fi * December 1961 - 305 foe wy ; . P.P.C. - ot that the period From the average dust count lowest results were obtained figures it during the can be seen 21 hour break ... an & cael understandable 61 This is , for afternoon shift but seems strange hoi _ the day shift should be affected unless it was coincidencet Also noticeable is the low counts obtained during Assistant Inspector Loxton's stay in December 1961 : - It was pleasing to note the efforts on the Nanagements part to improve conditions unfortunately the they are not receiving and employee's assistance it appears that we Inspectora must take a strong line of action against the minera concerned Now that the supervisors are more than interested in conditions and are doing their utmost if we do not strongly support them in their duties them we may lose their interest so can00 to conditioagnaisn deteriorate | . " watered man has been delegated to keep the bench and Main Adit watered down and no doubt this bas decreased the dust areas liberated from these The Kain ^ ditappeared quite clear bar This , on all occasions one one exception was caused by dry : dirt airflow into the No. 2 Ross Chain Feeder flushing . its good airflow airflow level ";, airflow not the Adit Adit action - flushing flushing flushing . airflow of 30,000 eumine airflow not passing N^'.+, Adit vas | not Adit This . found be passing not = Adit volume * _, variable is Ventilatiomnosotflfyiacreorusnd according to the officers wihytones eat the 15,000 cumins region Feet te 7 tot _ of Underground Wampger it was Wherever possible stoping faces are being worked up the dip instead down dip an before After consultation with the and staff regarding a complete abandonment of down the dip stoping after conditions during the inspecti deo cidn ed that it was impracticable at present owing to development being behind to abandon down the dip stoping At present all stoping faces are adequately ventilated mostly through airway by a but where no airway exist Electric Fan then a Xeco E.F. 4 A. with 15 ducting is provided The Underground Manager work all future stoping faces up the dip whenever possible been made and A door has is ready to instal at the Main Adit entrance A trap door is incorporated so that ot the change of shifts when the door is closed and looked men can still pass through . During the shift the door will de left open and so allow the Main Adit to downoast At the change of shifts the door will be closed and locked thus pass air causing more to be drawn into the bottom of the mine and so allow a larger volume to into the stopes from the lower Air Measurement~ s . ase eee tS Ventilation of this mine is now carried on by two Richardson 60 A.F. Class A axial Flow Fans One is still upper seam exhausting at the cliff face on the drawing air from both seams at present but is actually The other fan is operating from No. 5 leval and is positioned Just south of the forms 54 S. surface rise which . the only intake airway for this fan Work is still being done in an endeavour to completely isolate the two seams and so create two independant airways Once completed the fan at the cliff opening will exhaust air from the lower seam whilst the fan on No. 5 level will force air through the upper s^' From air measurements directions and observations made during this inspection the idea of isolating the two seams and so provide independant airways is no longer a dream but is almost a proved and working system The fan on No. 5 level is at present only passing 57,000 cumins Once all brattices etc. have been completed it will be speeded up to its full oppacity sme _ , js am reenter nee me : wet eee : Le Tae ae me ee ... he an eo ka 27 at . ie . . of The - total volume of air passing through the mine was measured 112,000 cumine of which 66,500 cumine ventilates the lower 45,500 . | seam and 45,500 aumins ventilatos the upper seam It will . is hoped once both fans are working at full capacity to have an excess of 180,000 cumine passing through the mine of which | both seams receive an equal amount ,,8 . > measured during The recorded volumes measured at the Yain points this visit were as follows - | ip Kain Adit clier Intake |. =. 30,000 cumins "et 2 - opening - ; ry No. level Clier = * .. * 2,000 _ opening opening + 4% : Cn +) . ^' No.3 laval alifr ial 2,000 * . opening a o . Moj Zeval olser se opening 7 8 ' - 5 3 11,000 . Ho 5.leval Burface | * |. 57,000 * . . . 7 * se - wy : . an ar) Main Surface Fan Neco E.P. 6 Fan - 0 Exhaust . 8. 98,500 98,500 cumins 13,500 a H o: . . TOTAL = s_.._: 112,000 camina = " The Neco I.F. Electric Fan exhausting at 11 8. is . only a temporary installation It was fond necessary to place it there because of leakages in the manway brattices between upper and lower seams Before its installation the air was downeasting to the levels via manwaye etc. but once * this fan began operating its influence overcame most troubles - Once all brattices ete are satisfactory this fan will not be required The reason behind the poor brattices etc. was that over the holidays supervision was abort also Mr. Kulbolland was on holidays and before he returned the separate circuits . = were brought into being with the aforementioned troubles Upon returning to work Mr. Mulholland immediately appraised the situation and set about reatifying sama At the time of our visit only a small amount of work remained to complete the programme . - Lone, . . ; . The following is the proposed airways for each seam drawn drawn Beam down = Under the influence of No. 5 level fan air will be 54 8. Surface Rise and will then be distributed along Nos 6 and 7 levels from where it passes up manways etc. to - the upper seam workings Lower Beam air - Under the influence of the Burface Exhaust Fan drawn into the mine via the following points Mein Adit Nos 3 and 4 level Cliff openinga It then passes up manways etc. to the lower seam workings By : the installation of brattions in the manways and ore passes ' above the lower seam this air is prevented from entering the upper seam workings . Treatment Plant <0,|. in 1. Conditions the mill appear consistent with previous inspections ' The crushing section appeared more dust free _ this time than previous times Coe an ..... on an Average dust counts recorded are as follows , 59 Overhaul Crushing Section Sectio June : 1960 September1960 November 1960 August 1961 December 1961 Karch 1962 300 P 280 * / 430 460 p.p.8.0 440 390 Or 460 510 p.P.Q.Q. 435 300 P.P.C.0 250 P.P.OzCo 320 PoPo// 410 Q~- 480 P.Pe/.C 320 p.p.a.d. 620 p.p.4.0 p.p.4.0 380 P p.P.Q.Q p.P.Q.Q p.p p.P Q fi.6 p.p.0.0 the _.. Although dust count is lover this time it could possibly be discarded altogether Unfortunately we inspected the mill on Friday morning 23rd March The mill was stopped when we arrived and apparently had been so since 5 a.m. The mill was started at approximately 10.00 a.m. and we started the . inspection at approximately 10.30 a.m. It is therefore probable that the true picture of the mill particularly the | as crushing section was distorted so to favour better conditions The crushing section appeared better this time than it has ever done but the men working in it claim it is dustier than ever - ~ The` Management are definitely trying to control the . dust and are spending much money on it but owing to increased ~~ through and the ability of the present dost collection system to handle it success seeme highly imporbable . An experimental bag type filter is to be tried in the near future and it is to be hoped this proves # BUSCOBB Until the dust is collected at its source however no filter arrange- ment outside can do much for incide the mill It is quite obvious most dust is created at all points within the mill at various times is joined by dust from outside sources and Men through the mill generally seem to be wearing macke especially through the crushing section : On our next visit to this mine an inspection of mill will be done during the initial part of our stay and another one or two checks before leaving the district the possib Generalt ; As stated earlier conditions through the mine appe much better than before On afternoon shift conditions appeare good except for area . Previously thick snoks accompanied by the characteristic smell of fumes was present through the mine on afternoon shift The men do not have these bad conditions to work in now but the dust hazard is still there as can be seen from the recorded dust counts It is therefore use less and misleading for anyone to gange the conditions from visu observations only The results of this inspection have proved dust counts this beyond all doubt and not until the recorded ar lowered to a satisfactory level can we be satisfied with conditi on this mine : Some asbestos was seen in the underground samples whereas much fibre was seen in the mill samples especially thes taken in the crushing arcas If the mill walls beame atc were to be regularly cleaned down perhaps some of the dust could be stopped inside the mill ; The experimental stoping block is ready for the longwall method of stoping to be tried No definite date has been nominated for the stoping to commence but now the Underground Manager is back from holidays operations may soon be under way . ... ne es tee erate ae = 8. os Theventilation * officer -Hulholland ur i -in soutinuing ' his . excellent work and the problems should become lesser in magnitude under his influence It is pleasing report the . . ming responsible being given excellent operation us by all 3 . personnel co i, . -, os 7 ~ eter een ammttall tassel AD ae mene, Gs q