Document vBvvXaLEGEYZnM8L0ODmL95pR

V I . APTEHDIX Chevron BB 013722 Chevron BB 013723 | SECTION VI - APPENDIX GENERAL FOBS AND DRAWINGS GO-i*53 GT-2818 EF-3U8 GB-S13870 GB-13990 GB-M2l|07i| GC-lli2 96 GB-1U3U7 GB-H318 GB-llt368 31323 GD.-L31368 - GE-31551* GS-31902 ,, GE-33336 B-51895 GB-68801 GB-78876 ^ (3-789it6 GC-79186 GB-7968U Maintenance Material Lists Classification Sheet for Refinery Piping Building Design Data Sheet Detail of Reinforced Concrete Gas Seal Catch Basin Typical Details of Trenches, Paving, Gutters, and Installation of Tile and C.I. Catch Basins Assembly and Details of Walkways, Stiles, Short Stairs and Bents - Positive Shutoff Lubricant Screw for Plug Cocks Guide Sheet No, 1 for Layout of Platforms and Ladders Guide Sheet No. 2 for Layout of Platforms and Ladders Standard Shop Wall Bench Standard Spacings for Pipe Lines Detail of Heavy Welding Boss for Connections to Vessels and Lines - Detail of Strainer for Bottom Outlet Nozzles i Instruction for Installing Corrosion Gage Point in 'Process Equipment __ Standard Details, Concrete Fireproofing for Structural Members Standard Details of Steel Flanged Monel, Channel Sections " Detail of 150# ancT300# Raised Face and Tongue and Groove Flanged Nozzles for Pressure Vessels Details of Welding, Support, Lug, Skirt Vent, and Small Con nection Standards for Pressure Vessels Assembly and Details of U-inch Diameter C.I. Individually Adjustable Cap, Riser and Strongback for Fractionating Columns Assembly and Detail of Steam Hose, Steam Nozzle, and Water Hosfc Assembly and Details of Thermocouple Skin Points for 5-inch O.D. Furnace Tubes Chevron.BB 013724 ! GENERAL FORMS AND DRAWINGS (CONTINUED) GB-87280 GB-P87601 GC-88167 GC-8839it GB-88595 GA-89559 GE-G920lt3 GB-99507 GE-K99519 GA-995k9 GB-99561 GB-L99S96 CS-S99617 GE-99618 GE-S99623 GD-101311 GC-J88609 GA-995Wt GA-P996ii7 Details of Built-up Manholes and Covers for Vessels Detail of Enameled Sign and Post for Marking Underground Electric Cables - - Engineering Department Design Guide Sheet for Pump Slabs Standard Details of Mountings for Welding Outlets Typical Lead Guards for Flanges and Valves Handling Hazardous (Vesicatory) Liquids Record Book Preparation Instructions for Domestic Refineries Standard Labyrinth Bearing Housing Closure for Pumps Standard Orifice Flange Assemblies Standard Guard for Flexible Coupling Standard Steel Deck Bridge, Reinforced Concrete Piers and Abutments with Spread Footings or Wood Piles Assembly and Details of Standard Steam Hot Plate Standard Steam Trap Manifold Standard Details of Rafts and Saddles for Vitrified Clay Pipe Sewers Standard Fire Hose Box, Vertical Type for 100 ft Permanently Attached 1-1/2-inch Hose Standard Horizontal Fire Hose Reel Design Guide for Refinery Lighting Details of Nameplates for Instrument Boards Standard Details of Mounting for Welding Outlets with Circuit Breakers _ Standard Lighting-Poles, Fixtures and Connections Chevron BB 013725 O lIttVIUM DD 013726 STOCK NO. REVISIONS 3 NUN os oUS m so Ot M M M - rX 4o1 OXt X X* Mx x 4O1 8 8 M -4 M 181* M X 8 MW M MO 8 M ON 6J <SJI M US M X MN MM N MO 5 Oi 5m 0 X rMr = a 40 m *4 7" m x P* - LINE DESCRIPTION On ex. O ?ojr oa < tr Sfit' 3 c3 SSO' o NOTES m o om 3 > 3 1 1 1 1 1 i j OPERATING DEPT. APP. ORDERING REFERENCE MAINTENANCE MATERIAL LISTS FOR COST S;S PH* RECOMMENDED STOCK MINIMUM MAXIMUM* (r* X om m a n S at o n o X / C* 3 LINEC4 US M us fS US us <3 " 3 X OXk X ON X 4S 41 fit C4 M X 41 O <4 40 U (4 *sj U o M III u X hi u (4 N hi hi N e IP M M K> K> M Oi Ul X hi PO N W M O <0 a >4 Ok U* X hi M - 0 40 m - <jf X hi M - / -G T - 2 8 4 6 CLASSIFICATION SHEET FOR REFINERY PIPING Chevron BB 013727 I CD CD c o 00 hr CN | Oo Chevron BB 013729 GT - 2 8 4 8 - CLASSIFICATION SHEET GASKETS I o ii m 1 If T II pii Si! siis still . i 1 ii I ji *i P: ia issiT I ! i s i! i i I ai H ii Ml i 9 3 5 1 CO i; UJ IS > < ill. > 55S * mt m i j im i 5 l 1- ' i. ? 3 If Si! i CO C9 ii! s z 1! H f IU Lu i t j J! u 3j333?*3 "i -% i i ii *-- 1 i T -5 1 I 1= 1l I! 1i !i m IS 1 Si Ii IS U Ii If? 3 \i i, 5 H\ m ill If i ss HS i s i s ! iS H! !| I ! ! -r . iS ! fT i ! i! If 3>W * s = !! li 1 5 = lii ii! I ni ji! 2- isi*i 1 lih' ?! li 11 II -5-3 ii iI : S..i III! sit is m ii i i ! ;* 5 *! 1! 1 I l CO 8 UJ o si Z < i j. u. 11 II pH:!! I i! I 38 i i i! 3 ti ii h li j 1 5Is*fcS 1 ::se5" I Si, ?E I Ii i 8 iS *=* 1 m m ii-r~rr 8.-t1J$ 11 mm M j------------ -- Hi I i! HI i =1 ! fn 1! HI I ml i ii s: :' III ii, st 3 2 li 1! m 1! pill f 1 - !< -I.'LiI- tLiLi li li li 1 ll "?5 t \i hi !! n Ii (lii! Pi iiiiii = h? ; 3 ii ;= 3 pti IS lii! 1 2 I 1 n Chevron BB 013730 -GT --2 8 4 8 CLASSIFICATION SHEET FOR REFINERY PIPING Chevron BB 013,731 GENERAL DATA USE________ LOCATIONHAZARDOUS AREA? APPROXIMATE AREA___ _____________ ^____________________ PRELIMINARY OUTLINE SKETCH: NUMBER FLOORS_ HEIGHT TO EAVE____________________ HEIGHT TO RIDGE' BUILDING CODE___________________ _________________________ PUNS FOR FUTURE ADDITIONS:____ __ OCCUPANTS: MALE TOTAL NUMBER _____________ MAXIMUM NUMBER PER SHIFT _____________ CONSTRUCTION DATA _ FOUNDATION_________________________________________ FLOOR______ EXTERIOR WALLS___________________ _________________ PARTITIONS. imiL FINISH ROOM FLOORS PARTITIONS EXTERIOR WALLS CEILING mm REVISIONS TJ APPROVALS UTILITIES AND FACILITIES PRESSURES WATER POTABLE NON POTABLE GAS *K. OSPT. SANITARY WATER CLOS. URINALS LAVATORIES STEAM ELECTRICITY AIR VOLTS CYCLE PHASE LIGHT POWER SHOWERS WATER HEATER DRINKING FTN. SLOP SINK AM'S. DCPT. CALC NONE LIGHTING___________________________ ________ HEATING---------------INSULATION________________________ AIR CONDITIONING. VENTILATIONCRANE RAIL ADDITIONAL REQUIREMENTS AND REMARKS CM..-- NOR.. REFERENCE DATA __ DRAWINGS: BASIC ENGINEERING DESIGN DATA SHEETPLOT PUN. BUILDING DESIGN DATA SHEET FOR Chevron BB 013732 Chevron BB 013733 Chevron BB 013735 013736 Chevron BB 013737 Chevron BB 013738 fiB -1 4 3 6 8 -U Chevron BB 013739 scc Note TABLE OF SPACING N0M.PIPE51ZE mm 1 3 ?PR0V*L* 4 SO, DEPT. 'R' DEPT. 10 12 4* 5* 6* 6* 10 12 5* 6* 5* 6* 7* 6'* 7* 8* 9* 10 11 11 12 13 M E N5 I 0H5 6* 7* 8* 8* 10 12 13 IN "A" INCHES 8 10 10 9 * 10 10 10* 12 12 13 11 1! 12 13 14 13 14 IS 14 15 16 N C H LS 12 12 12 13 13 14 15 16 17 SCALE tfateL...... DATE 4SJumpovers may be used where designated in Tabic thus * 6pacings "A" are for lines in pipeways,trenches etc. allowing for making-up joints and flanges staggered on either line. 5pacings for lines in pits that tie into one manifold are determined by the size of flanged fittings used in manifold. For sizes less than 12'not listed Juse next larger size. 1 This Drawing same, as Richmond Drwg.E~239IO l | M L 31323 STANDARD SPACiNGS FOR, PIPE LINES Chevron BB 013740 013741 Chevron BB 013742 "x J * 2 /png anju/ar srri^s of sams rnaierial as lining. INSTALLATTON FOX ALLOY LINED EQUIPMENT % /"*xf"long alloy gage point Materia! as specified. 2 alloy rods req'd. per gage point Location. Holding Jig INSTALLATION FOR UNL/NED EQUIPMENT OWO DEPT. MOTE:- T 1 - Place alloy rods in jig in contact with equipment at designated location and weld one end of rods. 2 - Remove jig, make sure that rods are snug against wall and weld other end of rods. 3 - When installing gage point rods avoid damage to outward extending cylin drical surfaces as these surfaces are used as datum for micrometer gaging. H - The material fgr gage point rods shall be as specified on the equipment . drawing. All 18-8 Cr.-Ni. (AISI Type 302) and l8-8-3.Cr.-Ni.-MoIy * (AISI Type 316) gage point rods shall be welded with 1/8" chrome-nickel- molyAISI Type 316 electrodes. Kastelloy A or B gage point rods shall be welded with 1/8" Haste Hoy 8 electrodes. .' 5 - Orientation (II or = ) of gage point rod sets shall be designated on the equipment drawing exactly as wanted. Alignment of gage point rods shall be in these indicated directions. - ___ Mm/2:..\ DATE -...M-./O-Ml Z::M KN6R.. MARK NS 6A6E POINT ROD MATERIAL ELECTRODE MATERIAL f 2 --3 ft"did. 18-8: Cr.-Ni; lupe SQZ AUou Steel. "-18-6 Cr.-tJi. 7y.pe3!L "din. 13-6-3 Cr.-Ui-Mallu Tune3!6 81. Jf. 6-/8-8 Cr. -Pi " Ec. 'diet. "HastelloU A1 AlloU- F'- Hastellou B Setls'faetery \ Mark 2 instead of Mk I Substitutes J Hastalloy instead of Hastalloy *A' lb Alccampony RP-5Z. | Q ' instructions for installing CORROSION GAGE POINTS IN PROCESS EQUIPMENTS GL-31902-3 Chevron BB 013743 Chevron BB 013744 Chevron BB 013745 Chevron BB 013746 ft. a Ifilx) Co -Co lo'lo b Cc b <oigJao lb> r> N ' ' *'-*ii"iiim'im,*i * `n*irt*-r'*n R IS-r x .* '! ?* U-~_-~.rv< 'pj '' . , -'* 1-1 "r ' ' r S35 II;I.I;iii'iiiffii!i o-<--j3o* r-fs-!2 s giP,sg-8 ffjT<s:a S i i.: : I.,..;.;, %:.. ------ ``(`A ill 0.0 0 "0 0'bo<y!oo o;aro ,oJp i**>r`c>: ioijj* 0 c^pJ^sTj'0 vi v-'o v v . tc o.U.U.U rCi cm oc`r- < liTlilfetsktiM^Ss: -u.!* IS^Pfeiv e> 'e^^IfnlJoi o'rp^s'3ieoier' 9 K rtjix^i,,j^o.c"cS>>|cc)*l'*,ll!'Wrl|cJn=i(',^1i` **%*)c!c^?^l*"i i*n,+> _J_ rvj n> I1 :'i*p O > r--w^K fe*e S"3 -----fe 5? is . !!- i* ~Ep Ti payosds sjauw jocoqajnd fiq p|9M pjdy jcy ajpcs-id 04 jsjnpvinuo^ poaq j9M0j uo sc p)SM auitss 9$n poaq doj uo pajinoaj ;ou si pi'm 'pjaij auaqM ^ io*p as? J9AO JOj ui>m SfS| `s| ^,uaqM P18M p|9lj' ptfSq oox" tQ-9 poaoxs Qi jou Ire 7~ mod j>,0-,9*> Q* qiixj^n-^ f Hi s *1 B & L L L L i.s**ir2sBmi Pmi i ! ! j 'fSSi 1 CP CMppp.CM.CM Is Cl JU` ^ih,1*!. H.2 u * c <s 6, L 1. L !. . rtww --ffyN pS li i4 emiun.olmIDift*vi?O?p<0 ^ a , . L U t g(T O "ZZ^ifMiCMifn , % tn ui *Z S3 O tiJ 5g<c a ur 2 U-Z o -8J k3 & = ',I S t ui Jin id p MiSua^s i(nj dO|8Ap 04 j / p|M -6u!4Pi3J9pun ok pPM^iyiinj Og ' aBuey jqBmj-is >0 pus -> moic poou o; uoouo ;oi- on ^ ^ Chevron BB 013747 013748 013749 GB-79684 Chevron BB 013750 013751 Chevron BB 013752 GB-Q88I67- ^ -v ti* <$8 V I J 0.* ^.5 vHfS>s^-SS: -$*$i! I**:**; ,<cQ^ 0c ,;^ K^'0a 5-a-S*9 <n 5* fJi ^59t.i8, <9-*5 ^.SCJ aHh^S,Q uf-O5V t1.ikJ'*i,jSaa.vu5?, y?ii ?iig if! ill' $g* :&$!!: *)_H>0o 'jk 'r-s-"$5* q* c$5>SV u*i. *cl * rst< *Q . 00C0 a! lltHtfrv^S'i-i! irnBps M xvw v5? ^5C 1:8* K <i.n 'q* Cn 5 *) > i Q J5Ut.S8^.J Is 3E5 n< nc . io* 65 *< g<Jbq. _15o UJ- _ &* ' Q Chevron BB 013753 013754 Chevron BB 013755 Chevron BB 013756 Chevron BB 013757 Chevron BB 013758 Chevron BB 013759 TONGUE GROOVE ASSEMBLY ............ Q IB $b!L.M K <'~ ,M IN T . ASSEMBLY L "........ ..................... flonof asseMBues _ IGB-99507 Chevron BB 013760 Chevron BB 013761 Chevron BB 013763 !S l co )o Chevron BB 013765 u 0xSfrJ \,2'Jx2ufcst J? o Carriage^ /0>ctrsX^~^ Joint Brass Butts with* Brass! pin $ 6~f long brass screwsd 0 j Hook-On door. j 2-cf t rj Host Alaphr, j 3 Angle vahe Lii *4 W with comp, disc.(Crane , Male. (Crane No. 70 or * > J Ho- 93 R) Ta/h ^ Gutnotch in ^ VT_^f/ack forPfe \J Post".-- 3x3" S4S. ' If ^' REVISIONS Redroodjor 'x3 3"steel , -angle /I ~rAr Ground'd i sn Nipple- B."Riser. HeightjT to suit boy. Km O/v' v mVvT l//K/ " Gca/eN'ti'-o" 5/DE VIEW '/Jp'AH screws to be $8 BK3T771 W5&o.p Side H7?UnNVn .lA mm,rw Back -Poor Butis pBottom Af. head bolts Side NA "" Screws m AN doon ^ iy4f"Door. 8n('VPicpl) DETAIL OF CORNERS - No Scale Recess door onlt/^ for butfa COEPT. SCALE d&JihpWL CONSTRUCTION NOTES /- /w- ^< //7 mounting omit post and fasten tc wall or studs with bolts or ,lag screws Hinge door on side nearest to wait* ` 2~ For outdoor use prefect top with 26gage ga/raniped sheet bent down /"oyer side and back, ti/nge doer on e/ther side. DATK .Sz&Z- DR h.^43 CM, ENGR,. O 3" Japp/p comp/ete w/th B-JOft /engths sing/e jacket rubber lined hose^ .,gashers nogg/e and spanner wrench- u 4- Supply hose, noggie, and hose thread adapter for ij> Hat Std. fire hose thread un/ess spec/Ned, otherwise to conform to iocai customs. 5- Make tor fromjf'-Sip/y waterproof pigwood. Paint red a// outside surfaces. ..>- Provide one 3 brass wire hook <f oye S STANDARD FIRE HOSE BOX, VERTICAL TYPE Ur OOCIQ-O FOR 100FT. PERMANENTLY ATTACHED //'HOSE'rL'>'0, U Chevron BB 013766 CVt-i-J/ > w 1a . i-rj* V [I i> ,hS: /" ,H / 8~iqX'? xlg iy- bars, equally spaced !l is r$C REEL CAPACITY: # 38*D/a. /OO i-k hose. 28 Dia-? So` n >< , Smooth bearing Surface *3 if'w Burn ventilating slots Js x 4 /y ; o\j on 28 dia. pfafe ' ^ `J and d>"x 6Vy on 38"'em, plate, 1o c ,X g h/eld, solder, or rivet I handle to top, \ 3 Bearinq surface teRj (Reelremo/able) x 3 "dia. stlpl, Z"Riser) I detaslX A-ASECTION xHandle -g ff/at sH. 22 6afOZ3d)sH. top Removable hood Wefdj solder or river side TO fop.---- *-f=: , I86a.C0478%H. sOe+t 2a did. z __ aofej ENG. DEPT. f A 2'BckdOPiL 300^2X2'td Black MJ. Tee OPfl-G. DEPT. SCALE /u:-p.:. DA TD z&=4L 2 5ch4Q Pipe tbsADfl.,,_________________ CNCR.. T^Separate Hydrant o ALTERNATE CONSTRUCTION it H* ft* 2xlji 200 Sod. "lose Brass Angle Hose Valve with comp, dis^ Breenberg **Hdor equal :NOTE Supply Hat Shd, Rose thread on raive, hose\ Z"5ch. 40 P/peRiser and nogg/e un/ess otherwise specified fo meet local customs. ttCom, position# disc reqt uired f Ground Level, "for high t closure ^ 1 in this service standard horizontal fire hose reel IGES3%E3i Chevron BB FOR Ih" HOSE 1 013768 TVsh i J3 a i i e ! 1 i iI i1 N ~~~ IH 1i i I* If ! Is I 7 tf I 1 i 5 " ^ | '-==r i ii 1! 1, ii u 1* I 1 slf 111 II IUI HI 1 S! ^ iii "3 E se 1 If si --- 2- -is' - * 2 i. i: i i = ij 2 5 i i5 S I3 i ii IUi i , It | y j t s 7 w_ ?! 6 !i M il ll 1 S a IS i2 fill ! II? 5*! il il ill lit ii| if j ! 1 \1 iH |s s SI is 1 rhISi1 ipnni inpiii Ill Si Hi I!8 iii iis Hi | g #5 i = * <ii if! II ii! Iii =;i iii iii- "P 5 ti ii ill III it! ii I! HI HJ Ii ft r! es e * I II 8 I s: S 23 Si M i g iM it iii iii iilipsi i! HI * SS5 - - -2 ms illli! mill f- - ! , is Ml 1o S HIE ill s 1 iii Is *' !; iii if in i in i 2 1I 2! I2 i2 ; :: ? I2 *J * p :n Ii II ii ii ;ns iii 2 s II1 : 1 8 -- S a 77 ss jil i ft *:7 7s? S88 * *2? 7 7 7 : !7 7 77 2 - !! ril \ ! L \5 y 1 !lliij111 111 s * i nil i iln n ii 55 1 1 iM t i Chevron BB 013769 Chevron BB 013770 12 13 18 18a 36 b2 13 33 65 66 68 69 121 153 15k 168 176 19U 221 222 22b 2bh SECTION 71 - APPENDIX EF FORMS Power Pump l$ata Sheet Steam Pumps Z Design Data for Shell and Tube Heat Transfer Equipment Design Data for Air-Cooled Heat Transfer Equipment Reference Data for"Relief Valves Schedule of Reference Data and Material for Recording and Controlling Instruments Schedule of Reference Data and Material for Pressure Gauges, Temperature Points, and Gauge Glasses Orifice Plate Data' API-ASME Code Pressure Vessel Design Sheet Design Sheets forlVertical Vessel Supports Painting Specification and Reference Data Centrifugal, Rotary, and Steam Pump Packing Specification Initial Field Hydrostatic Test Specification Centrifugal Pump Data Sheet Drawing Index Form ~ Fireproofing Specification for Column and Vessel Skirt Motor Data Sheet Furnace Design Data Sheet Steam Turbine Data Sheet Standard Details and List of Material for Insulation of Hot Lines ~ Standard Details and List of Material - Insulation for Hot Vessels and Lines Over 36 inches Summary of Utility Requirements ' Chevron BB 013771 EF FORMS (CONTINUED) 261* Rotary Pump Data Sheet 291* Standard Item List 302 List of Materials and Schedule for Steam Traps 335 Expenditure Control Statement 363 Standard Conduit Connections andWiring at Motors Chevron BB 013772 POWER PUMP DATA SHEET -( 100-CO * - 50) Chevron BB 013773 a s sp a 5 n s Chevron BB 013774 DIRECT-ACTING STEAM PUMP DATA SHEET - -(EF-1J 900-CD 4 50) nm.QTfSM 11 AT A FOR SHF11 ft TTIRF. HEAT TRANSFER FONTPVfr.NT SERVICE c)RDER NO. DUTI BTU/HR . . - MFR. -- > PERFORMANCE DATA Shell or Tubes HOT FLUID COLD FLUID Fluids & Quantities Density or Gravity at 60F. Average Molecular Weight Viscosity at F. Viscosity at F. Liquid Evaporated Vapor Condensed Temperature In F. Temperature Out F. Max. Working Temperature F. Inlet Pressure Lbs./sq.in.ga. Max. Work. Press. Lbs./sq.in.ga Computed Press.Drop Lbs./sq.in. Max.Press.Drop Lbs./sq.in. Nozzle Sizes, Inches Nozzle Ratings & Facings - - - s> 0 =:v 1 siohs SCALE Req'ei.Corrosion Allowance, In. Confined Gaskets Req'd. Stress Relief Req'd. Theo.Clean Transfer Factor - - Corrected Mean Temp. Diff. - Min.Trans.Factor for SDec. Service---^ Transfer Area,Sq.Ft.(Ext.TubeSurf.)- Min.Overall Fouling Resistance ^Based on Outside Tube Surface----------- 0.0 CONSTRUCTION DATE -- )R._________ - -- :h. :ngr ENG. DEPT. OPR'G. DEPT -- -- ~---- -- -- -- - Horizontal or Vertical Setting - Minimum Number of Units 123 Tubes-3/4" OD 14, 16, 18 BWG, 80 or 120 or 155 or 192 or 240 inches long Tube Layout -- 60 Triangular or Rectangular with 1/4" minimum Cleaning Lanes No.Shell Passes No.Tube Passes Shell Dia. Length of Unit PART MATERIAL No.of Tubes THICKNESS CORROSION INCHES ALLOWANCE PART Tube Pitch MATERIAL Shell Shell Cover Channel Chan.Cover Float.Head Float. T.S. Fixed T.S. Baffles Tubes Bolting (2) Gaskets (3) Chan.Cover Chan-Fixed T.S. Shell Fixed T.S. Shell Cover Floating Head NOTES ([_ , .. 1 = j units BTrJ/Sq.Ft. x Hr. x F. {2) Refer to opec. (3) Refer to Spec. ^ lor Bolting materials for C&sket Materials APPROVED DESIGN DATA FOR FOR SPECIFICATION NO. ^ . T AT - FLOW DIAGRAM NO. E- Ep-18 1206-CD-1Q-48) Chevron BB 013775 DESIGN DATA FOR AIR COOLED HEAT TRANSFER EQUIPMENT SERVICE - ORDER NO. -- DUTY BTU/HR. ,,1 f ' T-....... ...........M...F.R....... .......... PERFORMANCE DATA F.P. No. ............... ' HOT FLUID COOLING MEDIUM DATA FLUIDS l QUANTITIES DENSITY OR GRAVITY AT 60F. AVERAGE MOLECULAR WEIGHT VISCOSITY AT F. VISCOSITY AT F. LIQUID EVAPORATED VAPOR CONDENSED TEMPERATURE IN F. TEMPERATURE OUT F. DESIGN TEMPERATURE INLET PRESSURE LBS./SQ.IN.GA. DESIGN PRESS. LBS./SO.IN.GA. COMPUTED PRESS. DROP LBS./SQ.IN. MAX. PRESS. DROP LBS./SQ.IN. NOZZLE SIZES, INCHES NOZZLE RATINGS i FACINGS _ - ^ ^ -- "" ;S> $2 REVISIONS SCALE CONFINED GASKETS REQ'D. STRESS RELIEF REO'D. TOTAL EXTENDED SURFACE FT_________ TOTAL OUTSIDE BARE TUBE SURFACE, FTZ CORRECTED LHTD h: rfU) CONSTRUCTION ALTITUDE INLET AIR TEMP. OUTLET AIR TEMP. SCFM AIR (TOTAL) FANS NUMBER DIAMETER RPH HP PER FAN DRIVER HP RATING, EACH RPM VOLTS PHASE CYCLES XP (YES)(NO) INLET STEAM PRESS. OUTLET STEAM PRESS. LBS. STEAM/HR TOTAL BASED ON BARE OUTSIDE TUBE SURFACES DATE DR.-- TUBES-HORIZONTAL OR VERTICAL AIR FLOW-HORIZONTAL OR VERTICAL TUBES OD BWG INCHES LONG FORCED OR INDUCED DRAFT INSTALLED WEIGHT (EMPTY) TOTAL NUMBER OF REPLACEABLE IDENTICAL HEAT EXCHANGE SECTIONS AND ARRANGEMENT CH___ EKGR__________ ENGR. DEPT. OPRG. DEPT. PART TUBES FINS HEADER HEADER PLUGS FAN BUDES AIR CHAMBER RETURN BENDS MATERIAL THICKNESS CORR. ALLOW. NOTES (*) UN,TS BTU/SQ.FT. x HR. x F. APPROVED DESIGN DATA FOR FOR FLOW DIAGRAM NO. E AT EF-18-A (lOO--CD-1-51) Chevron BB 013776 F-36 (500-CD-S-U) EF-42 ( 200-8-49) Chevron BB 013779 EF- 4 3 (2oo C0-I2-U9J S310N 1 i 9?X io * say *S81 IVzUO <-uJ_ 9 a: SIHDNI W3OZNISC3TdHlOdNI r S E R V IC E | INST. NO. | ORIFICE PLATE DATA ss 5 o e o?x riaC Ii "<MSI <* rtu? 5nttNtvOftWnjM-'*i 5 13NOW *5Shown raaNo'vOo-HsTii 33131*10 v> ' Hd<3 Odg WdO D ShTsoT H/ldfD V013Y3 CHART DATA CHART HO- a UJ uadJ. si lj3i*-' ii INORMAL QUANT. 60'F. I avq -do "dH/tQI Wti3d SN0TIY9 AYO ttO h/$TSQ AYa/UTO Nomiw "aH^S'no CtoL XVOdHX 39NV13 F Q 9X, assn sv UJ 5 = AUO SPECIFIC GRAVITY AT60'F 1-dlV SV9 tOzH airton 'fll/ld no*ioA SKV31S OaiON aa?J A1ISOOSIA 9NIM01J Y0 Hl OS/W s'anssadd Ao dW3X M01:J , o* mmi u_ d UJ 2 O r if ic e P l a t e Da t a Fo r DATE JOB E Xu i1 SCALE OR__ W1QQ-. *1IaU- 0aa tuzJl 1 C5 o 3` i/i _L REFERENCE DRAW INGS 0<$> SNOISIA3U N OTES KINEMATIC( t ) VISCOSITY OF LIQUIDS IN STOKES. ABSOLUTE VISCOSITY OF GASES AND VAPORS IN POISES. OROER NO. Chevron BB 013780' | DESIGN SHEET FOR VERTICAL VESSEL SUPPORTS DETERMINATION OF CENTER GRAVITY: ' Weight Distance to Cent.of Gray. Moment Shell............. ft.atlbs./ft. Heads at-ribs'. eaj_Trays at_________________ lbs. ea ~a ___ _ ___________ ft.s . ft |K Manways 4 Nozzles Skirtft.at lbs./ = = X ........._______ ...........ft.- - - --- - - --ft. 1bs. .X ........... _.ft.= . Sub-Totals - Multiplying Factor () Weight of normal contents: (cu.ft. xlbs. 'cu . f t . S x - ___________________ft. ____________________ ft.lbs, Reboiler (full) S X . _______ ______ ft.--.------------------------------- ft.lbs. Insulation Walkways & Piping .: -X _ ____ ft. _ " r X. _ _________________ ft.-- ____________________ ft.lbs, TOTALS, W : ...M =__________ 2. EARTHQUAKE MOMENT, M EARTHQUAKE FACTOR, f = 0.I ( ) Me = Mfs----------------------------------- __----------------------------------- ------------------------_ _f t. I bs . Eccentric Moment (Reboiler, etc.) J b . xf t.f t. 1 bs . TOTAL, M | s ___________ ______ 3. WIND MOMENT, M2 WIND FORCE, F, = (15) ) lb./sq.ft. F2 = (20) ( ) lb,/sq.ft. >i>kmO REVISIONS Mw - 1 I' ) - + Dh2 (hl +-yT<: 2=-------------------------------------=------------------------------------ ft.lbs. 24 1 12 Eccentric Moment. Jb. -ft. = _ft. lbs. TOTAL, M2 =ft. 1 bs . (DrVessel outside diameter, Inches, h j = 60 ft.max. height over which F| is effective, h2= height above 60 ft. over which F2 is effective, feet). APPROVALS ENG. DEPT. 4. MAXIMUM MOMENT, M (M|, M^I=------------------------ --------- -------------------- ft. lbs. 5. SKIRT THICKNESS, t, t____ In. Max.allow.Stress. 10,000 psi. Min. t D_ 400 ` ........ ...........or 1/4". / 12M Y~ Stress : '(1L2 + = _ps i, OPR'fi. DEPT. SCALE DATE R._ __ __ __ __ __ __ H.__________ NGR.- - - - - - - - - - - - - - - - - Y Circumferential width (in Inches) of openings in skirt at horizontal plane representing greatest cross sectional metal area removed. Skirts operating above 400 F. should have special consideration to allow for decrease-ln yield point stress (Yield Point at 400 : 25,000 psi at 600 r 16,000 ps i at 800 = l3,OOOTsi). Check tall slim structures for periocTof vibration, T, (see Recommended Practice No. 57). -- s------------------ -----------------------7^-=-~-------------------- =--------------------------- ,T(From 87613 =------------------ Sec. D tsL _ L = Vessel height in feet. ts = Shell thickness ANCHOR BOLTS. No. of Bolts, N, = I /48M Load per bolt, B = -- N ................. , Bolt circle dia., D 1 Jrs. -PS Allow, stress for combined vertical Jbperating load and earthquake or wind 1.33 x normal stresses; therefore to choose proper bolts from Drwg. GC - 68922 divide above calculated load by I--33 1733 = := Bolt Sizes ------------- -------- In. From Standard Drawing 32084 HZ; 'bS' VESSEL: PLANT: DWG. -LOCATION ORDER EF-66 (200 - CD - 2-43) Chevron BB 013781 013782 6 9 -J 3 Chevron BB 013783 *|K SI 11 hk : ; .sti ss 1! I? I * i2 rirs: i* S1 ?l fi -1. : - ^.= rH=sH.iIli<ll ;:;"i HI ; 8 gs si jjS _| *| sei*j-sr 3.s" isjil -f=* tz I!Sfc S.*s h U Ihll ss 3 .s t| 1:i; *s I?=; g" '? 3f=ii Sssx * xs U!) x* ItzS tI t;J*?:=S P if *5 1, XI i ZZ i* slip fii s! *lj.s~i* ,-:h=*;=i;Jk*t*i :^u Hi4| tI iu I !:i * il-it k 5x r -I =5 i! =l:t ~x IIt . r S' St II I H i* ?i :i ? i]5i f.Tl il ; .. !< S; !\A7*1--3313 J*:it *a n. - 8 f1*!t 6|! , I M: s! st ;ul = :ss5c* iIi.l i1. J .1 - ft if t0 . :??:< *s '** ,, *s. 3Jii fit* r: xt. -*s-!15.CS 2I :u:!: J-.?ri J-srzs-c;! *;M~. s sis:: s* 1 JsifiCsi:*ml se** ,,*.ls=Si - St* * * a*t!S|i"S~'. ? * Sr t g4 4 4 4 fill . iI1S- s=Xi 21" vt15* H ? fi \{li *8 tZ I IS t; 2*!j* km --:* 44444 mm 4 i i s! | I l :=,*; ! | i * 3 s1 s , 5' a .g. jI ,, k ' ,,c ' ,,C;' rSi r5;. ?r ': ri'5c e f s1 c! K1 c. s! g| | 1 | g | 5 a !(aI1 5'M1 g { s J g 8 gI XI > 1--MP 4>* -fl m o>: * o 5: 94 Chevron BB 013784 i i s l Chevron BB 013785 THIS SHEET IS PANT OF SPECIFICATION NO.________________ HORIZONTAL CENTRIFUGAL PUMP DATA SHEET F IL E NO. INDEX OF CONSTRUCTION DRAWINGS EF-15* (2H-CO-12-*!) REVISION RECORD 1 SCUT TO | e (*) cm - o -- s s s s_J i 1 i 1 it 3 Ui B u. CK Ui Zo t a me Ui i; ft. o Ui i i ja a Ik mUel t2 p? CK UJ o t Ui cz a u E' B _g u ftf Ui c X Ui UI at UJ E X UI o t _a i Z i i ft 3 Ui u. a i iZ S 3 .| i u. 3 Ui uT za 1 Ui u. a c Ea. R 0 aUaI w Uoi Ui US moe X o ui n _ft.i CM uO - O :ai 03isand3n *ok m *r> aua: ae if o =ft>. *o v> sU1"i F X X X 5a x 3 z So X sf Fa<- ax X x Sa z a at --- x .j xX * * * _i _i 1 SX aX ae a Ui V- 3 %a a X UFaXi X U--i a U--i f X oX X on ui _i a. Bl rj M Is' **l '3J 'i*ll a ae ttabvw Wind ^a *oo * W Pl-AHT _______________PROJECT, W.O TITLE _____________________________________________ INDEX O F F O R ENGR. DEPT. OWQ. NUMBER Chevron BB 013786 Chevron BB 013787 SQUIRREL CAGE INDUCTION MOTOR DATA SHEET ,,.. / -- File No. MOTOR NO. A. PURCHASER'S SPECIFICATIONS 1. Horsepower Rating (Continuous) ( .Min.) 2. Synchronous Speed, RPM -- 3. Voltage -- 4. Frequency _ 5. Phase " 6. Enclosure (OP - Dripproof, SP - Splashproof, TEFC - Totally Enclosed Fan Cooled, XP - Explosion Proof. See C-2) 7. Temoerature Rise - C . B. NEMA Design Letter 9. Locked Rotor EVA Code Letter 10. Frame Number II. Mounting (H - Horizontal, V - Vertical Sol(37 Shaft, VH - Vertical Hollow Shaft 12. Bearing Type & 13. Bearing Lubrication (See C-3) IN. Insulation Class REVISIONS 15. Direction of Rotation (viewed from end V.. SCALE 16. Built-in Thermal Protection Required (See C--4)_ 17. _ IR- - . 19. ----- DATE B. SUPPLIER'S DATA __ )R._____ 1NGR.___________ ENG. DEFT. 1. Manufacturer 2. Manufacturer Type Designation 3. Full Load Soeed. RPM 4. Pull Load Current,. AMP 5. Outline Dimension Drawing No. 6. 7. B. ____ -- -- ^ - C. GENERAL SPECtFiCAT 1 OKS OPR'G. DEPT -- APPROVED 1. Motor shall be designed and fabricated in accordance with NEMA Publication No. MG 1-1949, "Standards for Motors and Generators." 2. Explosion-proof motors shall comply with the requirements of Underwriters' Laboratories for Class 1 Group D hazardous locations and shall bear their label. Motors designed with additional protection for use in the chemical industry are preferred. 3. Oil lubricated bearings shall be equipped with a device for maintaining constant oil level with visible indication of oil level. 4. Settings for thermal protection: -- Class A insulation I00C; Class B insulation - I20C. 5. Motor shall be designed for full voltage starting unless otherwise specified. EF-176 (SOO-CD - -50) Chevron BB 013788 r Furnace Designation: Serrlce IGENERAL OPERATING ^CONDITIONS Total Duty, Btu/hr Max. Allowable Raaiant Absorption Rate) gtu Actual Radiant Absorption Rkte ) "jy2 Actual Convection Absorption Rata jnr/ft Max. Allowable Pressure Drop, Psi Calculated Pressure Drop, Psi --^ Case Case Case . FEED Composition Case Case Case Case Mol. Wt. Gravity, 0 API Density, lb/gal F Quantity, lb/hr. Quantity, GPU F Dist. Curve Dwg. No. Case Case OPERATING CONDITIONS Temperature, F Pressure, Psi(Gage)(Absolute) Weight Percent Vaporized Viscosity, Liquid} Centipoise Viscosity, Vapor, Centipoise Enthalpy, Btu/lb. above 60F Inlet Case Case Case Outlet Case Case Case DIVISIONS AMKOViLl NS. DEPT. ;TUBES -------- Designation Effective Length, Ft. Diam. & Thickness, ins. Material Max. Allowable Skin Temp., F Radiant Area, Sq. ft. Convection Area, Sq. ft. Total Area,Sq. ft. opr's. ocrr. HEADERS - - - Designation Type Material: Header Body & Plug Holding Member Screw Screw Diameter, ins. Screw Thread SCALE OR.. BURNERS: Type:. Fuel gas: L.H.V. ____ Btu./cu.ft.j--Mol. wt., ___ } Pressure at Burner Fuel Oil: L.H.V. ____Btu./lb.; Gravity:____ _API at____ F _ Viscosity, SDS at____ F.____ _ Temp._ _F} Press.. Atomizing Provision; Miscellaneous Design Data: ENCR. psig. -Psig. DESIGN,DATA SHEET FOR FURNACE F ___________________ ,-- Section Plant at 0-194 (200-cib-S--)' Chevron BB 013789 /A CHECK STEAM TURBINE DATA SHEET AFTER THESE ITEMS MEANS THAT THEY ARE REQUIRED m a 5 3 U Iv>t * p Chevron BB 013790 -t F - M l (> -< - ) Chevron BB 013792 Chevron BB 013793 EF-2W (iM -ct - !-) ROTARY PUMP DATA SHEET *-5) W.O. cr SCU No._____ Plant " Page 1 of 12; " * Standard) ITEM LIST Tfcr JacEsSTLAHTs7 (Specific for Manufacturing Department Projects) (Project Title) PLANT NO. _______________(Location) (Project Division) APFROP. NO. .: NO. DESCRIPTION - S.O. ACCT* ITEM LABCR MAT'L TOTAL (FCR DEFINITIONS OF ITEMS SEE SPECIFICATION NO. E-977) GROUP I - TECHNICAL SERVICES-& IRORATE ITEMS A - Technical Services_ a. Engineering Department Service 1 ` Engineering & Drafting 2 Photoreproduction Serv. & Direct 3 Project Record Books _ 11 Outside Engineering Services Chgs. . 93 93 93 93 ' b. Manufacturing Department Service 30 Home Office Manufacturing Engineering Dept. 93 31 Refinery Engineering ' 93 32 Field Engineering Supervision & Inspection 93 33 Design Consultation by .Operating Department 93 3k Fire Watch and Gas Testing 9U c. Miscellaneous Technical Services IjO California Research Corporation 99 Ul Training Operators - 01 U2 Materials Inspection by Purch. & Stores Dept. 99 Technical Services^Subtotal - B. Prorate Items - 50 Erection Contractors Fee -- 01 51 Contractors Field Office Expense 01 52 Workmen's Compensation, Public Liability and property damage insurance, builder's risk insurance, and payroll taxes 01 53 Construction Equipment Rental & Expense 01 5k Purchase & Maintenance of Hand Tools 01 55 Purchase Of Consumable'Tool Supplies 01 56 Temporary Lines & Structures _ 01 57 Cleanup _ 01 Issue Date EF-29U (200-CD-7-50) Sheet 1 Chevron BB 013795 ITEM NO. DESCRIPTION ) _ W.O. or S.O. No.________ Plant ________ Page 2 of li; ' ACCT. ITEM LABOR MAT'L TOTAL 58 Utilities Used -During Construction 59 Staging & Form Lumber 60 Material Handling 61 Motor Transport Department -- 62 Consumable Construction Materials 01 01 01 99 01 Prorates Subtotal TOTAL GROUP I - GROUP II - PLANT EQUIPMENT ITEMS C - Columns, Strippers, Absorbers & Reactors (Inc. Internals and Packing) (Examples listed below) General Instructions for Allocating Charges 100 Alterations to Existing Columns, etc. 101 Repairs to Existing Columns, etc. 102 Dismantling Existing Columns, etc. 103 Atmospheric Column - C-101___ 10U Vacuum Column - C-205 - 105 Vacuum Column Side Cut Stripper C-206 106 Catalytic Reactor Tower C-301 05 06 0? )[)| lUt 1th id; 100 101 102 103 10U 105 106 107 108 109 no 111 Issue Date (200-CD-7-50) Sheet 2 Chevron BB 013796 W.O. or S0f No. Plant Page T^rm .. ITEM NO. 112 120 DESCRIPTION I _ ACCT. ITEM LA3CR MAUL TOTAL 121 122 123 12U tc 129 ~ D - Drums, Tanks and Other Containers (Incl. Internalslind Racking) (Examples listed below) 130 Alterations to Ebcisting Containers(Enumerate) 05 131 Repairs to Ebcisting Containers (Enumerate) 06 132 Dismantling Ebcisting Containers (Enumerate) 07 133 Atmospheric Column Overhead. Reflux Drum V-101 33 13k 1st Stage Acid Treater V-205 3h 135 2nd Stage Acid Settler V-206 3L 136 Primary Agitator V-301 32 137 Secondary Acid Retort V-102 = 50 138 Storage Tanks and Drums (Atmospheric or 31 Pressure Type) 139 - litO Storage Bins - 26 130 131 132 133 13U 135 136 137 138 Issue Date EF-29li (200-CD-7-50) Sheet 3 Chevron BB 013797 W.O. or SoC. No. PI ant ' Page FofTH ITEM NO. DESCRIPTION ACCT. ITEM LABOR MAT'L TOTAL 139 __________________________ HiO na __________________________ 1U2 __________________________ 1U3 __________________________ liih __________________________ to 159 __________________________ E - Exchangers} Condensers. Coolers, Heaters, & Cooling Towers (Examples listed below) " 160 Alterations to Existing Exchangers 05 161 Repairs to Existing Exchangers 06 162 Dismantling Existing Exchangers 07 163 Crude Asphalt Exchanger E-1Q1 [5 16U Rerun Column Reboiler E-3O3 ii5 165 Side Cut Cooler E-201 Ji ii5 166 . Feedwater Heater and Other WaterHeaters 80 167 Cooling Tower ._ 51i 160 161 162 163 l6ii 165 166 167 168 169 170 171 172 Issue Date EF-29lt (200-CD-10-L8) Sheet U Chevron BB 013798 W.O. or S.O. No. Plant ' Page i of lit ITEM NO. , DESCRIPTION' _ -- ACCT. ITEM LABOR MAT'L TOTAL 173 ________ ___________ - 17U 175 176 177 178 179 to 20? ,, F - Furnaces and Boilers, incl. Stacks & Flues (Examples Listed Below) ' 210 Alteration of Existing Furnaces, etc. 05 (Enumerate) _ 211 Repair Existing Furnaces, etc. (Enumerate) 06 212 Dismantling Existing Furnaces,etc.(Enumerate) 07 Furnace F-l 213 Brickwork and Burners - 2lh Steelwork (Frame, walks & stairs, etc.) 215 Tubes & Headers, tube support castings 216 Stack 217 Flues & Ducts - h7 hi it3 U6 ii6 Boiler F-201 _ 218 Brickwork and Burners ^ 219 Steel Work (including tubes and drums) 220 Stacks 221 Flues & Ducts =. 222 Inert Gas Generator F3 223 Kilns & Driers _ 22U Addition of Side Wall Tubes, etc. 210 . 211 212 Ii7 ' ii3 U6 W hi 52 U3 Issue Date EF-29U (200-CD-7-50) Sheet 5 Chevron BB 013799 W*0. or 3.C. No. , Plant _____________ Page 6 of lU ~~" ITEM NO. DESCRIPTION ' ACCT. ITEM LABCR MAT'L TOTAL 213 ______________ - 212* 215 216 217 218 219 220 221 222 to 239 G - Pumping Equipment and Drivers. Ind. Centrifugal, Reciprocating, Rotary) Jet & Ejector Types (.Examples listed below ) 2110 Alterations to Existing Pumps and Drivers 2111 Repairs to Existing Pumps and Drivers 22*2 Dismantling Existing Pumps and Drivers 2l*3 All Pumps _ 2ldi All Pump Drive Motors 2hS All Pump Drive Turbines _ 2i*6 All Pump Drive Engines - 22*7 All Vacuum Pumps and Ejectors 2U0 05 06 07 57 58 56 56 80 2Ul 2h2 2U3 22*2* 21*5 21x6 Issue Date EF-29ii (200-CD-7-50) Sheet 6 Chevron BB 013800 W#0# or &*0# No# Plant ______ __________ ___ Page 1. of 1U ! ITEM NO. DESCRIPTION, .= ACCT. ITEM LABCR MAT'D TOTAL 2h7 __________________________________ 2ii8 ________________________________ ______________ 2k9 ________________________________ 250 ____________________________________ 251 252 ^________ 253 _ 25U __________________________________ _______________ 255 ;2 256 ~ 25? ____________________________________ 258 - 259 2 J - Instrumentation _ (Examples listed below) / 260 261 262 263 26ii 265 266 267 268 269 270 271 272 273 27U Alterations to Existing Instrumentation Repairs to Existing Instrumentation Dismantling Existing Instrumentation New Instruments and Equipment_(including piping, wiring, conduit, and appliances) Control Valves _ Instrument Panel Boards Safety Valves Relieving Columns Safety Valves Relieving Tanks Safety Valves Relieving Agitators (Wash Tanks) and Bleachers Safety Valves Relieving Miscellaneous Vessel Safety Valves Relieving Continuous Treaters and Settling Drums _ Safety Valves Relieving Retorts Safety Valves Relieving Exchangers Safety Valves Relieving Pumps Safety Valves in Combination Relief System 05 06 07 59 ' 59 59 31 32 33 3^ 50 57 39 Issue Date W-29k (200-CD-10-U8) Sheet 7 Chevron BB 013801 W.O. or S*G. No. Plant ' ' Page 8 of ll* ITEM NO. 260 261 262 263 261; 265 266 267 268 269 270 271 272 273 27U DESCRIPTION/ -- _ -- "C3 -- ACCT. ITEM LABOR to 279 280 281 282 283 28U 285 286 287 288 289 290 292 293 K - Compressors, Blowers, and Other Mechanical Equipment - (Examples Listed Below) Alterations to Existing Equipment Repairs to Existing Equipment Dismantling Existing Equipment Feed Compressor K101 Oil, Grease &Misc. Mixers -- Filters, filter presses and centrifuges Cranes, derricks, and hoists Screening & Pulverizing Equipment Conveyors & Elevators Permanent Shop or Portable Tools & Machinery Ventilating Fans "Package" Refrigeration Unit _ "Package" Air Conditioning Unit 05 06 07 55 35 36 63 60 67 68 55 80 80 Issue Date BF-291* (200-DC-7-50) Sheet 8 Chevron BB 013802 ITEM NO. > DESCRIPTION 280 ________________________________ ________________ 281 - 282 - WiO. or S.O. No. Plant Page 9 of lh _ACCT. ITEM LABCR MAT'L TOTAL 283 28h ___________________________________ 285 ___________ ' 286 Lt 28? 288 ____________ 289 _ 290 _______________ 291 _________________________________ ________________ 292 ________________________________ ________________ 293 29h~______________________________________________ 295 _ 296 _ 29? _ 298 299 ; L - Lines (Piping) 300 Alterations to Existing Piping- 05 301 Repairs to Existing Piping, Valves 06 302 Dismantling Existing Piping _5 07 303 Process Piping (incl. off-plot Transfer Lines) 39 3Oh Utility piping - ho Issue Date EF-29h (200-CD-7-50) Sheet 9 Chevron BB 013803 EfflKO. -- DESCRIPTION " W.O. or SvO. Wc._______ Plant Page 10 of lit -- ACCT. ITEM LABOR MAT'L TOTAL 305 Eire Protection Lines 1 38 306 Vapor Recovery & Breathing -Piping Ul 307 (If "On Plot" and "Off Plot1') lines are both included in one item list,-assign separate item No's.) 309 3_____________________________________________ 310 to 319 320 321 322 323 32k 323 326 327 328 329 330 331 332 333 33)l 335 336 337 338 339 3h0 ------------------------------------------------------------------------M - Steel and Concrete Structures (Exel Foundations) Alterations to Existing Structures o Repairs to Existing Structures 06 Dismantling Existing Structures 07 Support Structures for Columns ^ Support Structures for Tanks 31 Support Structures for Agitators and Bleachers 32 Support Structures for Miscellaneous Single 33 Containers -- Support Structures for Continuous Treaters 3I4. and Settling Drums Support Structures for Retorts 50 Support Structures for Exchangers Support Structures for Filters, Centrifuges, 36 etc. jz Platforms, ladders, and stairs affixed to LL a single column ' "i Platforms, ladders, and stairs affixed to 31 a single tank __ Platforms, ladders, and stairs affixed to 32 a single agitator ^ Platforms, ladders, and stairf affixed to a single miscellaneous container 33 Platforms, ladders and stairs affixed to 3I1 a single continuous treater ]br settling dnm Platforms, ladders, and stairs affixed to a single retort 0 Platforms, ladders, and stairs affixed to a single exchanger - Elevated walks, stairs and ladders serving 71 more than one unit of equipment Low walks, stairs or stiles (steel or wood) 1I4. Loading racks and unloading racks for tank 27 cars -=- Issue Date EF~29ii (200-CD-7-50) Sheet 10 Chevron BB 013804 W. 0. or 3.-G. Nc. Plant________ * Page 11 of lli ITEM NO. , DESCRIPTION _ ACCT. ITEM LABOR MAT'L TOTAL 3iil Loading racks and unloading racks for trucks 27 3k2 Shelters for pumps, starter panels and other 80 equipment (includes shelters with roof, without four walls) 3^3 Pipe supports(brackets, hangers, stanchions, h2 sleepers), trestles and bridges for over head pipeways _ 3hh Retaining walls (except earth firewalls) 17 3U5 Bridges and trestles (excl. those for pipe 16 lines and excluding RJR. trackage) 3U6 Wharves and Docks ~~ 28 3h7 Davits -- 63 3U8 _________________________________ 3h9 _________________________________ _______________ 350 . 351 __________________________________ to 359 360 361 362 363 36Ii. 365 366 367 368 369 370 371 372 373 =___________________________________________ N - Insulation (Bxcl.JFurnaces) Alterations to Existing Insulation 05 Repairs to Existing Insulation 06 Dismantling Existing Insulation 07 Insulation on Columns _ Uj Insulation on Tanks 31 Insulation on Agitators and bleachers 32 Insulation on Miscellaneous containers 33 Insulation on continuous treaters orsettling 3^ drums Insulation on retorts 50 Insulation on exchangers __ ^5 Insulation on process oil, and vaporpiping 39 Insulation on Utility Piping___ 1;0 Insulation on Fire Protection Lines 38 Fireproofing ^ 02 37it 375 376 377 Issue Bate ____________________ EF-291* (200-CD-7-50) ' Sheet 11 Chevron BB 013805 0. or 5-0. No. Plant ' Page 12 of li; ITEM NO, 378 DESCRIPTION' ACCT. ITEM LABCR MAT'L TOTAL 379 P - Power & Lighting 380 Alterations to Existing Power & Lighting 05 381 Repairs to Existing Power flighting 382 Dismantling Existing Power &t Lighting 06 o? 383 Power & Electric Light Poles, incl. crossarms, 21 guys, supports, insulators and hardware (Trank line to substation) 38ii Telephone & Communication System incl. wire, 22 conduit, instruments and signaling equipment 385 Power & Lighting wiring on poles incl. pole 23 top switches, cutouts, etc. 386 Power transformers, switchgear, substation 23 and distribution panels but not motor branch circuit breakers or switches 387 Conduit systems incl. fittings, pull boxes, 23 manholes, etc. for feeder wiring 388 Feeder wiring, substation to~distribution 23 panels -^ 389 Lighting transformers, wiring, conduit and 23 fittings, switches and lighting fixtures outside buildings, (include- control houses and small buildings) 390 Lighting transformers, wiring, conduit and 25 fittings, switches and lighting fixtures inside buildings having feeder circuits separate from general plant-lighting 391 Motor Control Conduit Systems between distri- 58 bution panels and motors, incl. conduit fittings and pull boxes _ 392 Motor wiring, incl. power and control circuits58 between distribution panels and motors 393 Motor controls, including circuit breakers, 58 push buttons, safety devices, etc. between distribution panels and motors Q - Foundations =_ 100 Alterations to Existing Foundations U01 Repairs to Existing Foundations 102 Dismantling Existing Foundations U03 Foundations for columns liOU Foundations for tanks ii05 Foundations for agitators & bleachers 05 06 07 hh 31 32 Issue Date EF-29h (200--CD-7-50) Sheet 12 Chevron BB 013806 rf.O. or S-O. No. Plant' ___ ' Page 13 of izi ITEM NO. .DESCRIPTION ,, ACCT. ITEM LABCE MAT'L TOTAL bO 6 bo 7 ii08 b09 blO bn bl2 bl3 bib bl$ Foundations for miscellaneous containers Foundations for continuous treaters or settling drums Foundations for exchangers.^ Foundations for pumps ^ Foundations for buildings (includes floor slab) Foundations for stanchions}- sleepers and over-head pipe-way bridges_ Foundations for loading ancLunloading racks Concrete foundations serving more than one unit of equipment Piling (prorate at completion of job) 33 2b bS 57 25 b2 27 02 0? , to bl9 R - Control Rooms and Other Buildings b20 Alterations to Existing Buildings 05 b21 Repairs to Existing Buildings 06 b22 Dismantling Existing Buildings 07 b23 Control house or gager's house 25 b2b Office and locker room building 25 b2$ 3iop buildings, warehouses, pump houses, 25 starter houses, garages, & misc. buildings b26 Bunkhouses, cottages 25 b27 Furniture for control house 77 b28 Furniture for office & locker room buildings 77 b29 b30 U31 b32 b33 b3h h3$ b36 S - Services, Sewers, Roads & Misc. Alterations to existing equipment (misc. & minor not affecting plan-evaluation) Repairs to existing equipment Dismantling (general for clearing site) Grading & filling (NOTE: Large grading & filling jobs that add available acreage to plant site charge to "land" Acct. Item 12) Roads, walks and pavements including associated gutters & curbs (excluding steel walks see "M") Pipe trenches, culverts, pits, earth . res ervoirs Painting .^ 05 06 07 u ih h2 oh Issue Date EF-29h (200-CD-7-50) Sheet 13 Chevron BB 013807 ITEM NO, DESCRIPTION' ' ACCT. ITEM LABOR. MAT'L TOTAL B37 U38 U39 BBO i-lltl BB2 BB3 BBB BB5 BB6 BB7 BBS BB9 Equipment, fireprotection --L Equipment, First Aid Cabinets, Blankets, Gas Masks, etc. , Equipment, employee welfare &safety (Recreation facilities & equipment; general safety equipment) Equipment, laboratory excludingglassware Equipment, operator's handtools Equipment, perishable, including lab. glassware _ Hydrostatic testing Fencing 7F Firewalls (earth only) Railroad spurtrackage -- Sewers, oil & sanitary, excluding separators Separators,Settling Basins & Sumps Water Wells 72 7? 76 92 9? 96 93 15 72 18 37 30 53 T - Chemicals B60 Chemical charges to plant, incl. catalysts 91 Issue Date EF-29B (200-CD-7-50) Sheet lB Chevron BB 013808 EF-30Z(IfrCQ -4'5Q r EXPENDITURE CONTROL STATEMENT ANTICIPATED (6 + 9 ) FIN A L EXPENDITURES CM 1 + g2 4 -i 5 Os 3 TOTAL (7+ 8) ESTIMATED TO COMPLETE or * CO IS s fv < 5? <0 < + ei < heo- Ei LU 1X-- X Xo S* o uoo. < OUTSTANDINS O BLIG ATIO N S ow UaeJ o 91-- O CM s 1UaXJ. X UJ eu. 3 V, X l-X . oO UtJ *o o3 TOTAL (1+ 2) ; !i ! i i, ; 1 i :1 i i i i ,i i i 1j i i D E S C R IP T IO N QC3Vou--> cKo UxJ X uj -- 2-*?. CL Chevron BB 013810 EXPENDITURE CONTROL STATEMENT Chevron E 013811 Chevron BB 013812