Document vBnq6B4j8np5nrqbkZKk4Dzb6

May 18, 1992 To: Herm Waltemate cc Bob Grahek From: Dan Gleghom Subject: VCM Monitoring Results For Compounding Operations 1989 - 91 The attached monitoring results, for VCM, are for the period 1/1/89 through 12/31/91. These are the results from the Corporate Medical Surveillance System. There are no results for the Canadian Plants or Terre Haute. I have included those job which only have exposure to Compound Operations. The highest result was in Plaquemine where the Operations Specialist/Technician - Compound had a 0.92 ppm average reading. Most plants do not monitor for VCM in Compounding operations. The result < 0.12 is a number entered into the computer which represents 1/2 the Detection Limit and indicates the results were below the Detection Limit of the analytical method used. GVD has always used 0.25 ppm for the detection limit when monitoring with the Reizener Badges. If a charcoal tube and pump were used a specific volume of analyte could be drawn and a much lower detection limit would be achievable. Under the present circumstances I recommend more accurate monitoring be conducted. We no longer are dealing with simple OSHA compliance issues and therefore need more sophisticated monitoring technics. I hope this will help you with your project. 21569011 deg 05/18/92 LETTERS\VCMCMR.HW BFG15242 IMS REPORT NO. 052 PROGRAM CMS8CM65 EXPOSURE PROFILE BY EXPOSURE IXPOSURE: 00148 VINYL CHLORIDE 1910.101? <001.00 PPM) LANT: 0010 CHEM LOUISVILLE 502-772-5900 DEPARTMENT: 5790 MAI NT-A1-CMP,TEMP,LB TIME PERIOD: 01/89 - 12/91 lOB CODE JOB NAME RANGE STD AVG DEV UNITS EXP SAMPLES TIME PERIOD LVL 802579203 PIPEFITTER 802579309 MECHANIC 802579314 INSTRUMENT MECHANIC 802579318 LAGGER 000-000 000-004 0.24 0.2 PPM 0.93 2.0 PPM 000-000 < 0.12 0.0 PPM 000-000 < 0.12 0.0 PPM 000-000 < 0.12 0.0 PPM 000-000 < 0.12 0.0 PPM 000-000 < 0.12 0.0 PPM 11 01/89 - 09/89 6 03/90 - 03/90 2 05/89 - 05/89 2 03/90 - 03/90 2 01/89 - 05/89 1 03/90 - 03/90 1 03/90 - 03/90 REPORT DATE NO. EMPL s B F G 15243