I Monsanto MOM (NAMf A IO^ATiOn) TO plaintiffs exhibit Carol Holmes - MISD Texas City fOA-151 X2265 April 7, 1982 cc Dennis Kos George Danner Zone 'I" 1st Qtr. Inspection Warehouses A,B,C InspectorsTrom Ryan Helen Haynes Tom Crump George Chestnut File: SHAC Book - Qtr Inspections The following items were noted during the inspection conducted April 6, 1982: Warehouse A 1. General: high stacking of cartons which are leaning. Appears cluttered; recent moves of material to build new restroom. Warehouse B 1. Isle to sprinkler system blocked - by scale and pallets. 2. Needs general clean-up - paper, pallets. 3. Very poor housekeeping. 4. Hand rail between B C warehouse needs to be re-anchored. Warehouse C 1. Looks much better than B. Your written response to these items should be sent to Carol Holmes, OA-15, by April 30, 1982. Carol Holmes /mj l. SC 002003 LAM003208 *CC *50*30 Monsanto 'nam * ioe*noN)` Carol Holmes ' MISD Texas City COA-15) X2265 April 7, 1982 Zone T 1st Qtr. Inspection ec Bill Lancaster Dennis Kos Howard Bafvr CED Office Warehouse Inspectors: Tom Ryan Helen Haynes TO J. D, Stone George Chestnut File: SHAC Book Inspections The following items were noted during the inspection conducted April 6, 1982: CED Warehouse - Howard Bahr 1. Instrument Warehouse - communication cable stored on top shelf could fall off - not all the way on shelf. Old CED Warehouse 1. Blocked fire extinguishers. CED Offices 1. Cords running across floors tripping hazards. Several offices. Your written response to these items should be sent to Carol Holmes (0A-1S) by April 30, 1982. ~ Carol Holmes /mj 00200* SO LAM003209 0 *c< 9io Monsanto o~in*mi>locAtoNi' Carol Holmes - MISD Texas City (OA-15) X2265 o wutcr M'ltCNCC TO April 7, 1982 Zone 'I1 1st Qtr. Inspection Depts. 44,45,46 Horace Congor cc Carlos Navarrete Horace Congor Dennis Kos Inspectors:Tom Ryan Helen Haynes George Chestnut File: SHAC Book Qtr. Inspections The following items were noted during the inspection conducted April 6, 1982: 1. Inspection Department Room at Control House cluttered in all corners. 2. Lab Area - Boxes on cabinets and on floor. 3. P-Bulletins are up-to-date. Safety Suggestion Book active. 4. Breaker Room - Two wooden ladders without inspection tags. 5. Unit - Brooms, dust pans, shovel lying out. 6. Hose without green tag - should be blue used with Hunter Chemicals, Inc. Tank needs to take last inspection tape off of hoses when adding new tape. 7. Deluge System Pumphouse - wood leaning against. 8. Consider removal of wooden scaffolds. 9. Fire Ext. 44-13 cabinet used for storage - on top and inside. 10. By tanks 45F401-2 rubber and metal hose running to drain-a tripping hazard. 11. Need to rack ladders at South wall of tank 45T408-1. 12. Metal blinds on tank container wall at 45T408-2. . Machinist Shop 1. Storage room very cluttered paper, oily rags, trash; heater is bum hazard. General Comnent - Safety looks good; housekeeping needs improvement. T~^v&r^tne^gT?nder, face shield not in container. Your written response to these items should be sent to Carol Holmes, OA-15, by April 30, 1982. ^ C Carol Holmes /mj SC 002005 LAM003210 <C ^}C920 Monsanto. *Om |NAm( 4 LOCATION) r Suiter whinci TO Carol Holmes - MISD Texas City (OA-15) X2265 ( April 7, 1982 Zone 'C* - 1st Quarter Inspection R. Arnold M. A. Riddle J. T. White F. Herzog cc D. E. Kaldenberg D. D. Kos M. Holder - Inspector G. Johnson " G. A. Danner " File: Quarterly Inspection The following items were noted during the inspection conducted April 1, 1982: Personnel Building (R. Arnold) 1. Overcrowded storage room (next to taping room). * 2. Wires on ceiling in the taping room held in place withpaperclips. 3. Seal missing on fire extinguisher in hall. 4. Sprayer on floor at entry to Records and Benefits. 5. Boxes and bags behind door in janitor closet. 6. Boxes on floor and on file cabinet in Records and Benefitsfile room. 7. Abandoned ten-foot section of 1-1/2" pipe on ground east side of l Personnel Building. 8. Badly corroded conduit at base of power pole on east side of Personnel Building. 9. Should 4160 transformer have some personnel protection around it? 10. Temporary building - 6' x 12' piece of wood, rebarb and window screen on ground. Safety Supply and Locker Buildings 1. Weeds in back of building should be cut. 2. Shower heads plugged or inoperable in mens locker room. 3. Crows foot not pinned on hoses behind building. Main Gate 1. Two storage closets cluttered with boxes. Fire Station 1. Breathing air gas cylinder has been secured. Your written response to the items noted above should be sent to Carol Holmes (0A-15) by April 30, 1982. * These items are repeats. l. /mj Carol Holmes LAM003211 SC 002006