Document vB6w5aZZmzeGq7GJwx8npMovm

FOSECQ, I EMC. INTER-COMPANY AND INTER-DEPARTMENTAL CORRESPONDENCE to-. P. A. Partington H. C. Fletcher from: Corporate Quality Control oate: October 8, 1973 SUBJECT: BINDER AND NON-ASBESTOS MEETING: Thursday, October 4, 1973_____ 1. Present: PAP, WJV, AS, WCF. 2. Items discussed and actions agreed: 1.1- EP 5452A (Issued 10/1/73) remains the standard PROFAX recipe and replacement for PROFAX 31. 1.2- EP 5465 continuer as the asbestos-free recipe for Armco Middletown, Armco Ashland, and other accounts for which it is approved. 1.3- Testing of EP 5465 for other items, e.g., #699; #685, #688, etc., will continue at a reasonable approved rate. The EP-modifications will be replaced by standard recipes as tests permit. 1.4- AS is working on reducing the cost of EP 5465. 1.5- Copperveld #685 will continue in P-31. A test on the 4-cavity K-4 tool using EP 5465 will be made as soon as possible. The proposed >B' machine test will be cancelled. 1.6- PAP will investigate the production problems of using the hammermilled dry scrap and will review green scrap usege. 1.7- Vollastonlte supply and health hazards were discussed. 1.8- PAP reported that the Premizing station was about 3 months lead time, but that Stage 1 (drumming of bulk silica) was in progress. 1.9- PAP confirmed that Chicago and Mt. Breddock are to follow the program as outlined in the recent "New Binder" minutes. Copies of these are sent to TRB end CRB. UCF:mlr ce: RCP, PAP, WJV, WCS, HDS, FAB, SB, GF, GHF, JCM, AS, RTC, TRB HDW, NDW, JDS, DL, MSW. gIb, wjb.'kt 1753