PROJECT ORGANIZATION AND PROCEDURE CEfl 2080
SOLID AROCLOR EXPANSION - 20M LBS/YEAR ORGANIC DIVISION Anniston, Alabama
Project Manager - R. S. Yates
DISTRIBUTION
0. A. Bremer/p. K. Nunn R. Q. Brown/M. Kaye L. R. Burchfield J. W. Campbell/R. B. Degenhardt F. W. Enoch W. C. Geil/T. W. Jackson B. B. Hedleston R. C. Herman R. E. Howard/R. M. Kountz 0. A. Klingler J. L. Mathews/R. R. Cook
c. L. Parish J. B. Phifer L. H. Todd H- E. Waldrep - Anniston R. B. West/K. J. Johnston
R. s. Yates
Central File
Organic Division
Ml - Anniston (2)
0346026
TOWOLDMONOQ48347
TABLE OF CONTENTS
1. INTRODUCTION 2. DESCRIPTION OF FACILITIES
2.1 General Description 2.2 Specific Description 3. PROJECT ORGANIZATION 4. SECURITY 5. CED-PLANT RELATIONSHIPS 6. REVIEW AND APPROVAL 7. DISTRIBUTION 8. PROCUREMENT 9. CONSTRUCTION 10. ACCOUNTING 11. PROJECT COMPLETION
APPENDICES
PROJECT ORGANIZATION CHART
REVIEW AND APPROVAL RESPONSIBILITIES
DISTRIBUTION OF DESIGN INFORMATION FOR COMMENTS
DISTRIBUTION OF PROJECT INFORMATION
DISTRIBUTION OF VENDOR PRINTS AND
DRAWINGS FOR APPROVAL
'
DISTRIBUTION OF VENDOR FINAL PRINTS, DRAWINGS, DATA
PROJECT DISTRIBUTION LIST
POP, CEA 2080 2/24/69
Page No.
1 1 1 1 2 3 3 4 4 5 5
6
Appendix 1 "2 "3
"4 "5
"6
"7
0346027
TOWOLDMONOQ48348
POP, CEA 2080 2/24/69 Page 1
1. INTRODUCTION
This document describes the organization and procedure for the design, procurement, construction and start-up of manufacturing facilities at Monsanto's Anniston, Alabama, Plant. Communication channels for approval and distribution of documents are established.
Any suggested corrections to this procedure shall be sent to the Project Manager and all revisions will be issued by him.
2- DESCRIPTION OF FACILITIES
'
2.1 General Description
This project provides for the expansion of the Solid Aroclor facilities of the Organic Chemicals Division at its Anniston, Alabama, Plant from the present 9.6M lbs/year to 29.6M lbs/year. The estimated cqsts are:
Capital Expense Total
$1,100,000 90,000
$1,190,000
Target completion date is January, 1970. Low capital cost is important to this project; however, a December, 1969, or earlier start-up even at some increased capital cost is desirable.
2.2 Specific Description
Aroclors are reaction products formed by the chlorina tion of biphenyl or terphenyl using an iron catalyst. The by-product HCl gas is absorbed in water. Crude Aroclors are produced in chlorination reaction vessels, air blown and distilled. Solid Aroclors are produced in chlorinator reaction vessels, air blown and dis tilled. They are drummed, flaked, or flaked and ' milled and packaged for shipment. Distillation resi dues are discarded as waste or sold as Mpntars. This pioject, to simplify control, will pe considered as Area 1 in its entirety.
3. PROJECT ORGANIZATION
3.1 Process design and engineering design of all facili ties are being done by CED.
0346028
TOWOLDMONOQ48349
POP, CEA 2080 2/24/69 Page 2
3.2 procurement will be by CED. ment .
See Section 8 - Procure
3.3
All construction at the plant site will be done by construction contracts--either on a lump sum or cost basis. See Section 9 - Construction.
3.4
Cost accounting will follow CED procedures. Section 10 - Accounting.
See
3.5
All project participants within CED should communi
cate freely with each other and should keep the
Project Manager informed by copies of communications
of significance.
.
Communications involving decisions, approvals or other action shall be through the key individuals named below:
Between CED and Organic Division
See Section 5 - CED Plant Relationships
Between Monsanto and Construction Contractor H. E. Waldrep
SECURITY
4.1
Monsanto employees shall maintain the security of proprietary information in compliance with CED Procedure No. 27, "Security of Information." Members of CED, when visiting the plant site, shall comply with security requirements of the plant.
4.2
Arrangements for admission of contractor's employees connected with execution of this project will be made by Anniston, Alabama, management and the Field Construction Superintendent.
4.3 Permission to visit the plant site can be obtained from the following:
H. E. Waldrep, Field Superintendent - All Visitors W. E. Voss, Manufacturing Liaison - All Visitors
4.4
Drawings, specifications, etc., will be issued to the contractors for construction by the Field Superinten dent oriLy. Reclaiming all such data from the con tractors at the end of construction will be the respon sibility of the Field Superintendent.
0346029
TOWOLDMONOQ48350
POP, CEA 2080 2/24/69 Page 3
5. CED-PLANT RELATIONSHIPS
5.1
Communications involving decisions, approvals or other action between CED and the Organic Division shall be through the key individuals named below:
R. S. Yates and W. E. Voss
5.2 Trips to the Anniston Plant should be kept to a minimum to conserve travel costs.
Trip itinerary copies shall be sent to the Project Manager and ACM Design Coordinator so that maximum information can be obtained on each trip.
Use the Plant Representative, W. E. Voss, or H. E. Waldrep, the Field Superintendent, to obtain field information as much as possible to minimize the number of trips to the field.
Trips to the plant should be cleared through the Project Manager, who will clear with the Plant Representative. After return to the office, a brief trip report should be issued summarizing accomplishments. Copies should be sent to the Project Manager, Design Coordinator, and Plant Representative and any others who need to know.
6. REVIEW AND APPROVAL
6.1
To prevent delays of project execution, comments arising from review of drawings or other documents must be transmitted to the Project Manager within five working days from receipt of material for plant personnel and three working days for CED personnel. Comments may be made by telephone, followed by written confirmation.
6.2
On documents requiring review or approval from the Organic Division, initials of W. E. Voss will indi cate that concurrence of appropriate operating and maintenance personnel has been obtained.
6.3 Review and approval responsibilities for this project are shown in Appendix 2.
6.4
The originating design engineer will transmit copies of design information for design review in accordance with Appendix 3.
0346030
TOWOLDMONOQ48351
POP, CEA 2080 2/24/69 Page 4
7. DISTRIBUTION
7.1
The originator of specification data sheets, process data sheets or drawings will be responsible for the final distribution.
7.2 The Project Manager will issue approved documents to Project Manual holders only.
7.3
Distribution, including the number of copies of information generated for this project, is shown in Appendix 4.
7.4 Vendor prints for initial approval are distributed according to Appendix 5.
7.5 Vendor prints and data for final distribution are issued according to Appendix 6 and 7.
8. PROCUREMENT
8.1
The appropriate design engineer will initiate bid solicitations and purchase requisitions. Bids are generally solicited before design review is complete. However, design review shall proceed simultaneously with the bid solicitation.
8.2
All purchase orders for numbered equipment items will require the signature of the Project Manager. All other purchases will require his signature unless he specifically delegates this responsibility.
8.3
Instrument and electrical items will be purchased by the instrument and electrical engineers after approval of the respective design bases by the Project Manager. Exceptions will be for major items which will require the signature of the Project Manager.
8.4
The Material Control System for piping, instrument,
and electrical material will be used on this project.
The Materials Control Engineer for piping and for
instruments and electrical will coordinate the
activities involving the Materials Control System.
Procurement of the following will be handled by CED
at St. Louis:
'
8.41
All numbered equipment items
8.42
All instruments, including panel boards
8.43
All major electrical items, including feeder
cables (if required), lighting fixtures,
thermocouple wire, motor control center,
transformers
03*6031
TOWOLDMONOQ48352
POP, CEA 2080 2/24/69 . Page 5
8.44
All structural steel, grating, floor plate, handrail and stair treads
8.45
All pipe, valves and fittings
8.46
Permanite waste disposal piping materials
8.5
Bill of materials for piping and electrical items will be furnished by the AC&M and EI&U design sec tions to the purchasing section.
8.6
Procurement of the following selected contractors subject Construction Superintendent, CED Purchasing Manager:
will be handled by to approval of the H. E. Waldrep, and
the the
8.61
Concrete and reinforcing steel
8.62
All building items
8.63
Backfill
8.64
Thermal insulation materials
8.65
Waste disposal piping materials other than Permanite
8.66
Sheet metal ductwork
8.67
All carbon steel pipeand fittings less than
lk"
9. CONSTRUCTION
9.1
Supervision Of contract construction personnel will be exercised exclusively by H. E. Waldrep, Field Construction Superintendent. Contact with the Con struction Contractor or their employees must be through H. E. Waldrep or his representative.
9.2
Shutdowns for tie-ins to existing equipment, steam mains, relocating instrument control panel shall be scheduled by agreement with Mr. Waldrep and Mr. Voss. Any delays in this area should be brought to the attention of the Project Manager.
iO. ACCOUNTING
10.1
All field invoices, approved by the Construction Superintendent, shall be forwarded to the Project Accountant for payment by Monsanto.
10.2
Accounting procedures shall be those specified by
C. R. Becker, Project Accounting Supervisor at
St. Louis.
.
0346032
TOWOLDMONOQ48353
POP, CEA 2080 2/24/69 Page 6
PROJECT COMPLETION
11.1 Mechanical Completion
CED Procedure No. 125 outlines the general procedures and responsibilities for determining when facilities are mechanically complete to release to the Division for start-up.
Punch list procedures and records of mechanical test ing to assure the facilities are mechanically complete will be developed jointly by the Project Manager and Construction Superintendent.
11.2 Process Simulation and Project Demonstration
The Organic Division has the primary responsibility for planning and performing the process simulation ("water batching") and for proving accomplishment of project objectives.
R. S. Yates will review these plans, participate in the process simulation and arrange for participation of other CED personnel as required.
11.3 Initial Operation
The Organic Division is responsible for the initial operation of the facility. This is the early chemical operation of the facility in which each unit of the plant is operated, debugged if necessary, and put on stream. R. S. Yates will represent CED during this phase and will work out an agreement with W. E. Voss on correction of deficiencies made evident by initial operation.
11.4 Project Demonstration
The Organic Division will carry out the project demon stration which is a planned operational run of pre determined duration. The objective is to produce material at the quality, yield and rate as specified in the Process Manual and Project Manual and in com plete accordance with safety standards.
R. S. Yates and W. E. Voss will work out an agreement on termination of CED participation. This will occur when progress toward meeting the project objectives has reached the point where further joint effort is not warranted. W. E. Voss will make the formal report.
03-16033
TOWOLDMONOQ48354
POP, CEA 2080 2/24/69 Page 7 11.5 Project closing R. S. Yates will notify C. R. Becker, CED Accounting, when project demonstration has been completed and work out details of fiscal closing with Mr. Becker. Partial closures will be made when facilities are completed and placed in service.
0346034
TOWOLDMONOQ48355
3w >-l>
C -9 gS
^ *5
. .H WSft.g
ri
9 f,
S3 g
x dog
4J
*U0
&fO
c
<D C
tn C
<D 3
23
Q 523 Eh O OH
W
CQ X
D
OO 03 01
03 CU 04 X
W
W
> H 23 Eh O< H * CO 23 Hw >w Hw O 03
O
W 03
0346035
TOWOLDMONOQ48356
POP, CEA 2080 2/24/69 Page 9
APPENDIX 2
REVIEW AND APPROVAL RESPOSIBILITIBS
A - Approve R - Review 0 - Originate
GENERAL Design Basis Arrangement Drawings Scope Changes
tn
il U
0 jJ
U 0 *0
0> Cn Jh
0C M
cu & Of.
u C0
&> -P h fd c (D -P Q^
P 20 U0 <o
c flj B (I) 8
,
o
0?
c tn P P W fl> O <D QC
P tn uc <u
A,0 A, 0 A, 0
A
PROCESS________________________:
,ngr. Plow Diagram Perf. Data Sheets Inst.r. Per Data Sheets
A, 0 A, 0 A
R
MF.CHANICAL & STRUCTURAL
Equip. Specs. Equip. Drawings Foundation Drawings Structural Drawings Undergr. Util. Drawings Piping Drawings
A A A A A A
R R R R R R
A,0 A, 0 A, 0 A, 0 A, 0 A, 0
ELECTRICAL
Electrical Drawings Electrical Specs
AR AR
INSTRUMENTATION
Instrument Drawings Instrument Specs
AR AR
PROJECT EXECUTION
Instrument Purchases ;lectrical Purchases ACM Purchases Cost Status Reports Project Schedule Procur. Status Reports Construction Specs Construction Contracts
R R A R A,0 R A A
R R R R R
0 -
>4 C0 Cn -P h rd to d 0 -P D XJ
p D0 H0 M CJ
c
.ro
f(f1i)
o
.p
C d)
g ^0 rne
p
p
sc
JJ *P o
Cto
cv>
C
X
-rt
H
tP id up H O P0 p c 0 *P 0) cn H C ww
G 0 P CO ,r
h0
*
0 > P
ITS
P cG 0O P 10 0 p Vi > Qi P ' a u.
CO O >
,
R R RK
R
R R, 0
R R R
RR RR
R R R RR
A, 0 A, O
R R
A,0 A, 0
R R
A, 0
A, 0
R
RR
R
R 034603b
R
J___
1
TOWOLDMONOQ48357
POP, TEA 2080
2/24/69 Page 10
APPENDIX 3
DISTRIBUTION OF DESIGN INFORMATION
FOR COMMENTS
.
'
Number in parenthesis is the number of copies distributed 03A6011
TOWOLDMONOQ48358