Document vB4MdnO05zzD6oodmBk72EqzZ

PROJECT ORGANIZATION AND PROCEDURE CEfl 2080 SOLID AROCLOR EXPANSION - 20M LBS/YEAR ORGANIC DIVISION Anniston, Alabama Project Manager - R. S. Yates DISTRIBUTION 0. A. Bremer/p. K. Nunn R. Q. Brown/M. Kaye L. R. Burchfield J. W. Campbell/R. B. Degenhardt F. W. Enoch W. C. Geil/T. W. Jackson B. B. Hedleston R. C. Herman R. E. Howard/R. M. Kountz 0. A. Klingler J. L. Mathews/R. R. Cook c. L. Parish J. B. Phifer L. H. Todd H- E. Waldrep - Anniston R. B. West/K. J. Johnston R. s. Yates Central File Organic Division Ml - Anniston (2) 0346026 TOWOLDMONOQ48347 TABLE OF CONTENTS 1. INTRODUCTION 2. DESCRIPTION OF FACILITIES 2.1 General Description 2.2 Specific Description 3. PROJECT ORGANIZATION 4. SECURITY 5. CED-PLANT RELATIONSHIPS 6. REVIEW AND APPROVAL 7. DISTRIBUTION 8. PROCUREMENT 9. CONSTRUCTION 10. ACCOUNTING 11. PROJECT COMPLETION APPENDICES PROJECT ORGANIZATION CHART REVIEW AND APPROVAL RESPONSIBILITIES DISTRIBUTION OF DESIGN INFORMATION FOR COMMENTS DISTRIBUTION OF PROJECT INFORMATION DISTRIBUTION OF VENDOR PRINTS AND DRAWINGS FOR APPROVAL ' DISTRIBUTION OF VENDOR FINAL PRINTS, DRAWINGS, DATA PROJECT DISTRIBUTION LIST POP, CEA 2080 2/24/69 Page No. 1 1 1 1 2 3 3 4 4 5 5 6 Appendix 1 "2 "3 "4 "5 "6 "7 0346027 TOWOLDMONOQ48348 POP, CEA 2080 2/24/69 Page 1 1. INTRODUCTION This document describes the organization and procedure for the design, procurement, construction and start-up of manufacturing facilities at Monsanto's Anniston, Alabama, Plant. Communication channels for approval and distribution of documents are established. Any suggested corrections to this procedure shall be sent to the Project Manager and all revisions will be issued by him. 2- DESCRIPTION OF FACILITIES ' 2.1 General Description This project provides for the expansion of the Solid Aroclor facilities of the Organic Chemicals Division at its Anniston, Alabama, Plant from the present 9.6M lbs/year to 29.6M lbs/year. The estimated cqsts are: Capital Expense Total $1,100,000 90,000 $1,190,000 Target completion date is January, 1970. Low capital cost is important to this project; however, a December, 1969, or earlier start-up even at some increased capital cost is desirable. 2.2 Specific Description Aroclors are reaction products formed by the chlorina tion of biphenyl or terphenyl using an iron catalyst. The by-product HCl gas is absorbed in water. Crude Aroclors are produced in chlorination reaction vessels, air blown and distilled. Solid Aroclors are produced in chlorinator reaction vessels, air blown and dis tilled. They are drummed, flaked, or flaked and ' milled and packaged for shipment. Distillation resi dues are discarded as waste or sold as Mpntars. This pioject, to simplify control, will pe considered as Area 1 in its entirety. 3. PROJECT ORGANIZATION 3.1 Process design and engineering design of all facili ties are being done by CED. 0346028 TOWOLDMONOQ48349 POP, CEA 2080 2/24/69 Page 2 3.2 procurement will be by CED. ment . See Section 8 - Procure 3.3 All construction at the plant site will be done by construction contracts--either on a lump sum or cost basis. See Section 9 - Construction. 3.4 Cost accounting will follow CED procedures. Section 10 - Accounting. See 3.5 All project participants within CED should communi cate freely with each other and should keep the Project Manager informed by copies of communications of significance. . Communications involving decisions, approvals or other action shall be through the key individuals named below: Between CED and Organic Division See Section 5 - CED Plant Relationships Between Monsanto and Construction Contractor H. E. Waldrep SECURITY 4.1 Monsanto employees shall maintain the security of proprietary information in compliance with CED Procedure No. 27, "Security of Information." Members of CED, when visiting the plant site, shall comply with security requirements of the plant. 4.2 Arrangements for admission of contractor's employees connected with execution of this project will be made by Anniston, Alabama, management and the Field Construction Superintendent. 4.3 Permission to visit the plant site can be obtained from the following: H. E. Waldrep, Field Superintendent - All Visitors W. E. Voss, Manufacturing Liaison - All Visitors 4.4 Drawings, specifications, etc., will be issued to the contractors for construction by the Field Superinten dent oriLy. Reclaiming all such data from the con tractors at the end of construction will be the respon sibility of the Field Superintendent. 0346029 TOWOLDMONOQ48350 POP, CEA 2080 2/24/69 Page 3 5. CED-PLANT RELATIONSHIPS 5.1 Communications involving decisions, approvals or other action between CED and the Organic Division shall be through the key individuals named below: R. S. Yates and W. E. Voss 5.2 Trips to the Anniston Plant should be kept to a minimum to conserve travel costs. Trip itinerary copies shall be sent to the Project Manager and ACM Design Coordinator so that maximum information can be obtained on each trip. Use the Plant Representative, W. E. Voss, or H. E. Waldrep, the Field Superintendent, to obtain field information as much as possible to minimize the number of trips to the field. Trips to the plant should be cleared through the Project Manager, who will clear with the Plant Representative. After return to the office, a brief trip report should be issued summarizing accomplishments. Copies should be sent to the Project Manager, Design Coordinator, and Plant Representative and any others who need to know. 6. REVIEW AND APPROVAL 6.1 To prevent delays of project execution, comments arising from review of drawings or other documents must be transmitted to the Project Manager within five working days from receipt of material for plant personnel and three working days for CED personnel. Comments may be made by telephone, followed by written confirmation. 6.2 On documents requiring review or approval from the Organic Division, initials of W. E. Voss will indi cate that concurrence of appropriate operating and maintenance personnel has been obtained. 6.3 Review and approval responsibilities for this project are shown in Appendix 2. 6.4 The originating design engineer will transmit copies of design information for design review in accordance with Appendix 3. 0346030 TOWOLDMONOQ48351 POP, CEA 2080 2/24/69 Page 4 7. DISTRIBUTION 7.1 The originator of specification data sheets, process data sheets or drawings will be responsible for the final distribution. 7.2 The Project Manager will issue approved documents to Project Manual holders only. 7.3 Distribution, including the number of copies of information generated for this project, is shown in Appendix 4. 7.4 Vendor prints for initial approval are distributed according to Appendix 5. 7.5 Vendor prints and data for final distribution are issued according to Appendix 6 and 7. 8. PROCUREMENT 8.1 The appropriate design engineer will initiate bid solicitations and purchase requisitions. Bids are generally solicited before design review is complete. However, design review shall proceed simultaneously with the bid solicitation. 8.2 All purchase orders for numbered equipment items will require the signature of the Project Manager. All other purchases will require his signature unless he specifically delegates this responsibility. 8.3 Instrument and electrical items will be purchased by the instrument and electrical engineers after approval of the respective design bases by the Project Manager. Exceptions will be for major items which will require the signature of the Project Manager. 8.4 The Material Control System for piping, instrument, and electrical material will be used on this project. The Materials Control Engineer for piping and for instruments and electrical will coordinate the activities involving the Materials Control System. Procurement of the following will be handled by CED at St. Louis: ' 8.41 All numbered equipment items 8.42 All instruments, including panel boards 8.43 All major electrical items, including feeder cables (if required), lighting fixtures, thermocouple wire, motor control center, transformers 03*6031 TOWOLDMONOQ48352 POP, CEA 2080 2/24/69 . Page 5 8.44 All structural steel, grating, floor plate, handrail and stair treads 8.45 All pipe, valves and fittings 8.46 Permanite waste disposal piping materials 8.5 Bill of materials for piping and electrical items will be furnished by the AC&M and EI&U design sec tions to the purchasing section. 8.6 Procurement of the following selected contractors subject Construction Superintendent, CED Purchasing Manager: will be handled by to approval of the H. E. Waldrep, and the the 8.61 Concrete and reinforcing steel 8.62 All building items 8.63 Backfill 8.64 Thermal insulation materials 8.65 Waste disposal piping materials other than Permanite 8.66 Sheet metal ductwork 8.67 All carbon steel pipeand fittings less than lk" 9. CONSTRUCTION 9.1 Supervision Of contract construction personnel will be exercised exclusively by H. E. Waldrep, Field Construction Superintendent. Contact with the Con struction Contractor or their employees must be through H. E. Waldrep or his representative. 9.2 Shutdowns for tie-ins to existing equipment, steam mains, relocating instrument control panel shall be scheduled by agreement with Mr. Waldrep and Mr. Voss. Any delays in this area should be brought to the attention of the Project Manager. iO. ACCOUNTING 10.1 All field invoices, approved by the Construction Superintendent, shall be forwarded to the Project Accountant for payment by Monsanto. 10.2 Accounting procedures shall be those specified by C. R. Becker, Project Accounting Supervisor at St. Louis. . 0346032 TOWOLDMONOQ48353 POP, CEA 2080 2/24/69 Page 6 PROJECT COMPLETION 11.1 Mechanical Completion CED Procedure No. 125 outlines the general procedures and responsibilities for determining when facilities are mechanically complete to release to the Division for start-up. Punch list procedures and records of mechanical test ing to assure the facilities are mechanically complete will be developed jointly by the Project Manager and Construction Superintendent. 11.2 Process Simulation and Project Demonstration The Organic Division has the primary responsibility for planning and performing the process simulation ("water batching") and for proving accomplishment of project objectives. R. S. Yates will review these plans, participate in the process simulation and arrange for participation of other CED personnel as required. 11.3 Initial Operation The Organic Division is responsible for the initial operation of the facility. This is the early chemical operation of the facility in which each unit of the plant is operated, debugged if necessary, and put on stream. R. S. Yates will represent CED during this phase and will work out an agreement with W. E. Voss on correction of deficiencies made evident by initial operation. 11.4 Project Demonstration The Organic Division will carry out the project demon stration which is a planned operational run of pre determined duration. The objective is to produce material at the quality, yield and rate as specified in the Process Manual and Project Manual and in com plete accordance with safety standards. R. S. Yates and W. E. Voss will work out an agreement on termination of CED participation. This will occur when progress toward meeting the project objectives has reached the point where further joint effort is not warranted. W. E. Voss will make the formal report. 03-16033 TOWOLDMONOQ48354 POP, CEA 2080 2/24/69 Page 7 11.5 Project closing R. S. Yates will notify C. R. Becker, CED Accounting, when project demonstration has been completed and work out details of fiscal closing with Mr. Becker. Partial closures will be made when facilities are completed and placed in service. 0346034 TOWOLDMONOQ48355 3w >-l> C -9 gS ^ *5 . .H WSft.g ri 9 f, S3 g x dog 4J *U0 &fO c <D C tn C <D 3 23 Q 523 Eh O OH W CQ X D OO 03 01 03 CU 04 X W W > H 23 Eh O< H * CO 23 Hw >w Hw O 03 O W 03 0346035 TOWOLDMONOQ48356 POP, CEA 2080 2/24/69 Page 9 APPENDIX 2 REVIEW AND APPROVAL RESPOSIBILITIBS A - Approve R - Review 0 - Originate GENERAL Design Basis Arrangement Drawings Scope Changes tn il U 0 jJ U 0 *0 0> Cn Jh 0C M cu & Of. u C0 &> -P h fd c (D -P Q^ P 20 U0 <o c flj B (I) 8 , o 0? c tn P P W fl> O <D QC P tn uc <u A,0 A, 0 A, 0 A PROCESS________________________: ,ngr. Plow Diagram Perf. Data Sheets Inst.r. Per Data Sheets A, 0 A, 0 A R MF.CHANICAL & STRUCTURAL Equip. Specs. Equip. Drawings Foundation Drawings Structural Drawings Undergr. Util. Drawings Piping Drawings A A A A A A R R R R R R A,0 A, 0 A, 0 A, 0 A, 0 A, 0 ELECTRICAL Electrical Drawings Electrical Specs AR AR INSTRUMENTATION Instrument Drawings Instrument Specs AR AR PROJECT EXECUTION Instrument Purchases ;lectrical Purchases ACM Purchases Cost Status Reports Project Schedule Procur. Status Reports Construction Specs Construction Contracts R R A R A,0 R A A R R R R R 0 - >4 C0 Cn -P h rd to d 0 -P D XJ p D0 H0 M CJ c .ro f(f1i) o .p C d) g ^0 rne p p sc JJ *P o Cto cv> C X -rt H tP id up H O P0 p c 0 *P 0) cn H C ww G 0 P CO ,r h0 * 0 > P ITS P cG 0O P 10 0 p Vi > Qi P ' a u. CO O > , R R RK R R R, 0 R R R RR RR R R R RR A, 0 A, O R R A,0 A, 0 R R A, 0 A, 0 R RR R R 034603b R J___ 1 TOWOLDMONOQ48357 POP, TEA 2080 2/24/69 Page 10 APPENDIX 3 DISTRIBUTION OF DESIGN INFORMATION FOR COMMENTS . ' Number in parenthesis is the number of copies distributed 03A6011 TOWOLDMONOQ48358