D. B. Hosmer - E1SF General Offices April 12, 1972 WGK PLANT WATER POLLUTION ORGANICS SEWERED IN DROWNED W1 Minutes of Meeting - 4/10/72 Pre sent: F. J. Holzapfel J. R. Savage H. C. Carder P. B. Hodges D. B. Hosmer D. B. Hosmer outlined the problem: (1) large quantities of presently wasted HC1 are drowned to the sewer from several operations. This HC1 is mostly from chlorination of organics and is saturated (at least) with the organics. The organics go to the river. eo (2) Sauget Village plans for final waste treatment do not include removal of the organics. We will have to request a variance from the reg ulations for the planned waste treatment. Con tinued discharge of the organics from drowning HC1 will be unacceptable and would make granting of a variance unlikely. CNI J I Ni (3) An immediate problem exists with intermittent sewering of HCl from PCB's production. With the lower chlorinated PCB's, we sewer about 2 lbs/to. This cannot be continued because of present federal and expected state pressures against PCB's entering the environment. Some of the federal activities: a) The Chicago Regional Office has sampled our outfall directly for PCB's and, we believe, has analyzed some of the numerous outfall samples taken primarily for mercury analysis. b) PAUL HODGES DEPOSITION ,May 31 - June 1 1994 EXHIBIT NO. 38 The Office of Science and Technology is con sidering recommending to EPA that "zero" (no detectable level; discharge be permitted CER from PCB's producers and users. Proposed standard for river water quality is 0.01 ppb, almost below present limits of detectability. A more reasonable approach is being urged to the Office of Science and Technology. How- 013072 HARTOLDMONOOQ7322 ! -2- ever, even optimistically, we can expect to be allowed no more than some fraction of a lb /day. (4) Somewhat indefinite plans for scrubbing the HC1 from FOB'S are Inadequate to meet present needs. We must move very quickly to stop sewering the HC1 unless the PCB's are completely and positively removed before sewering. (5) Need to stop sewering of "dirty" HC1 from other sources is not as immediate as for PCB's. How ever, we should be proceeding to collect and sell all of the muriatic acid possible and to sewer only thoroughly cleaned-up HC1. This clean up can be done either at the producing depart ments or at a central absorption and clean-up facility. The ensuing discussion brought out these points: (1) Sewering of FOB'S HOI depends on ability of chlorosulfdnic acid (03) to accept the HOI for product ion. No facilities exist for drowning excess HOI at the OS Department. Apparently, the FOB'S in HC1 used at CS are no longer identifiable as PCB's after the scrubbing step with CS acid. At this time we do not know what happens to the FOB'S (what compounds are formed, environmental impact of these compounds, etc.). (2) No PCB's HOI is allowed to come in contact with the food-grade muriatic produced from chloro benzene manufacture. Therefore, clean-up and sewering of the PCB's HOI is not possible at the food-grade muriatic department unless we sacri fice that business, which yields a substantial return. (3) The proposed adiabatic absorber system which would collect all excess HC1 for sale as commer cial grade muriatlo acid, would not of itself do anything to decrease sewering of organics. While it does a reasonably effective Job of separating the organios from the HOI (so as to reduce sub sequent carbon usage), the organics are sewered and no reasonable means are obvious at this time to provide for disposal alternate to sewering. Therefore, cleanup of the HOI would probably be done prior to absorption through use of scrubbers, carbon, etc. WOK-TSD is studying this as a pro ject apart from the muriatic collection project (and MIC Research is also studying clean-up of HC1). HARTOLDMONOOQ7323 CWMOT lM 92SV-2 -MHDS 0 1 3 o ?3 -3- Actions Planned (1) Aroclors production will be tied to CS usage so that no HC1 will be sewered in the Aroclors area. The drowning facilities will be blanked-off and approval of Jim Savage will be required to re instate use of the drowning system;; This action will be commenced immediately with target of being an established practice by 5/1/T2. Jim Savage will handle. (2) Homer Carder will alter and expedite the HC1 collection and clean-up projects to provide for: a) Collection of all HC1 - not Just that portion economically attractive. b) Clean-up of all the HC1 so that when drowning is necessary, organics will not be sewered. Depending on the degree of pr-absorption cleanup, this may require additional carbon treatment following absorption for either sale and/or drowning. It is realized that the above actions will be expensive, with a risk of inconveniencing some Aroclor customers. However, these are necessary steps if the WOK Plant is to avoid prohibitive expenditures for external waste treatment and if the Aroclor1! Department is to mini mize risk of a shutdown order from federal or state agencies. Desmond B. Hosmer /ms CONFIDEKTIAL 82-W-2M-IDS CER 013074 HARTOLDMONOOQ7324