Document v1waG28ybe8JGJXLyNbJgLwL6

J 1. ALL LIGHTING FIXTURES, SWITCHES AND RECEPTACLES, INCLUDING CONDUIT AND WIRE TO BE INSTALLED COMPLETE. 2. CONDUIT TO BE RE-INSTALLED BETWEEN PB #12 AND PB 13. CONDUIT TO BE RE-INSTALLED BETWEEN PB 7 AND PB 8. CONDUIT TO BE RE-INSTALLED BETWEEN PB 7 AND PB 6. 3. CONDUIT BELOW PB 9, EXCEPT TO PB 11, TO BE RE-INSTALLED. CONDUIT BETWEEN PB 10, 2000 AMP SWITCH, 200 AMP SWITCH IS EXISTING. 4. INTERCONNECTING CONDUIT BETWEEN MACHINERY DECK, CAB AND CONTROL HOUSE TO BE RE-INSTALLED AND WIRE TO BE PULLED AND TERMINATED. 5. 4" CONDUIT FROM PB 14 TO PB 13 TO BE RE-INSTALLED AND CONDUIT FROM PB 16 DOWN TO LEG SILL TO BE RE-INSTALLED EXCEPT CONDUIT TO PB 17. 6. ALL WIRING TO BE RE-PULLED FROM PB 6 DOWN EAST LEG AND TERMINATED. 7. ALL WIRING TO BE RE-PULLED FROM PB 12 VIA PB 13 DOWN THE WEST LEG AND TERMINATED. THE FOREGOING IS BASED ON OUR INTERPRETATION OF THE LETTER TO MR C. HANES FROM MORGAN CRANE. DATED MARCH 31, 1981. THE ELECTRICAL ESTIMATE DOES NOT INCLUDE ANY MATERIAL (CONDUIT, FIXTURES, ETC), CHECKING OUT THE SYSTEM OR INSTALLING CONNECTING CRANE HOT RAILS, OR ELECTRICAL SERVICE TO ORE BRIDGE CRANE. McGCon 11975 DDUL, riUIN i t KAiNSMi 1 1 AL DATF. SHEET May 29, 1981 TO Mr. Cliff Schroff - McGraw Field Office BD PRINTS TO JOB FROM DiQk Pruett SUBJECT Erecting Ore Bridge in Hamilton Plant Contract No. 1294 PRINTS TO DIVISION PRINTS TO OTHERS WE ARE SENDING YOU HEREWITH THE FOLLOWING PRINTS: (DESTROY ALL FORMER PRINTS OF THESE NUMBERS) Drawings from Morgan Engineering C-385356 C-385357 C-385395 C-385396 C-385397 C-385416 C-385552 C-381792 C-385135 - Sh. 1 of 2 C-385135 - Sh. 2 of 2 C-385136 - Sh. 1 of 4 C-385136 - Sh. 2 of 4 C-385136 - Sh. 3 of 4 C-385136 - Sh. 4 of 4 C-385137 C-385138 C-385322 C-385323 C-385324 C-385326 C-385350 C-385380 C-385382 C-385383 D-385392 D-385400 D-385410 D-385412 D-385413 D-385415 D-385414 D-38 5475 - 1/2 D-385475 - 2/2 ' D-385476 - 1/2 D-385476 - 2/2 D-385477 - 1/7 D-385477 - 2/7 D-385477 - 3/7 D-385477 - 4/7 D-385477 - 5/7 D-385477 - 6/7 D-385477 - 7/7 D-385479 D-385496 D-385500 D-385504 - 1/2 D-385504 - 2/2 D-385515 D-385517 D-385520 D-385524 PRINTS RELEASED FOR: ft CONSTRUCTION EXCAVATION STUDY BLUE PRINT TRANSMITTAL RECEIPT SHEET BLUEPRINTS RECEIVED BY. DATE THIS RECEIPT TO BE RETURNED TO ARMCO MIDD. WKS. ENGR. OFFICE MIDDLETOWN, OHK m.mm.s McGCon 11976 CRANE #7834 - ELECTRICAL INSTALLATION 1. CONDUIT - RE-INSTALL AND TERMINATE 2. CABLE - RE-PULL AND TERMINATE 3. PULL BOXES - RE-INSTALL 4. LIGHTING, RECEPTACLES AND SWITCHES 5. MISCELLANEOUS 6. WIRE TAGGING 7. CHECKOUT, INCLUDING MEGGERING 8. COLLECTOR RAIL C216f-0'O 100 MH 337 MH 35 MH 200 MH 50 MH 330 MH 115 MH 225 MH 437 .472 672 722 1052 1167 1392 McGCon 11977 25 TON ORE BRIDGE GANTRY ARMCO - HAMILTON PLANT RE: ELECTRICAL INSTALLATION SCHEDULE - JULY 29 THRU JULY 31, 1981 WED. - 7/29 1. COMPLETE HOIST CABLE PULLS 2. TERMINATE HOIST A2 8 SI SPLICE BARS THURS.- 7/30 1. REWORK COLLECTOR (TROLLEY) CONDUIT 8 SUPPORTS 2. PULL TROLLEY CABLE 3. MAKE THROAT FOR HOIST LIMIT. FRI. - 7/31 1. PULL MAIN MAG. FEED 2. TERMINATE MAIN MAG. 8 TROLLEY FEED (PROPOSED WORK) - COMPLETE 500 MCM PULL 6 TERMINATE. MON. 8-3-81 PULL CONTROLS TO CAB 8 TERMINATE. THRU REPLACE DAMAGE WIRE IN CONT. HOUSE. WED. 8-5-81 START INSTALLING CROSS OVER RAILS. MOUNT TROLLEY SLOW DOWN LIMITS. McGCon 11978 25 TON ORE BRIDGE GANTRY ARMCO - HAMILTON PLANT RE: ELECTRICAL INSTALLATION SCHEDULE - JULY 21 THRU JULY 23, 1981 TUES. 7/21 WED. 7/22 THUR. 7/23 1. INSTALL CONDUIT WHERE POSSIBLE (EXCEPT LIGHTING) ft) 2. COMPLETE TERMINATIONS TO COLLECTOR RAILS. *?0% 1. INSTALL PULL BOX #7 S CONDUIT INTO PULL BOX #7. 2. COMPLETE COLLECTOR RAIL INSTALLATION @ "SPLIT" S ALIGN RAILS. CQrtpLk' 7ti, 1. INSTALL PULL BOXES #25 THRU #31 ON MACH. DECK 6 INSTALL CONDUIT TO BOXES. (EXTRA WORK) (IF CRANE AVAILABLE TO ELECTRICIANS) 2. PULL WIRE WHERE POSSIBLE. 0c/^i>Cc7e W ptLcCCZZ (PROPOSED) FRI. 7/24 THRU 7/28 1. RE-INSTALL MISC. STARTERS, DISC. SWITCHES, ON EAST SECTION GIRDER. .2 RE-INSTALL CONDUIT TO MISC. STARTERS, ETC. 3. PULL WIRE. 4. SOME TERMINATIONS. / fj r'UoCS i McGCon 11979 t-4 o x> 00 'O C7> VO F N> 4-- Ktfs* C kr *>, p t 'o $i p r^ r tv * S > *> ct. * s ** *3 2 orn X( QcH m rmotd?-Ho oto Hm 52--4 mZPH sM: m CO o uj rm~ TJ rcr o to fi CO s4--:4 m/W 1--4 Zto H rn>~ r4--4 O X1H--4 tZ|> 1--n4 X H 71 m in n Q 2u rrHmn oo uc*z--4 H >H O 71 o m M tzo H nr>~ norr~ to ortXon (S> *>n mH 71 roHm7n3 oz > Mr o Z S3 (O s: rn 1--4 nH 4H-< OZ sQXHlOI omH QZ Mo 7> O r4--1 OXH--i z0 1 73 m3--4 Zto r> r* ro n mo 71 o >o z in r CD O n*7 7m1--14 n 4c--4 H mhtO> H to m tZo -4 r>r~* nH 42-H to (D 4--4 n to O73 >H m 73 O 7H3 m 71 in 73 m e> T) CO *=s=| n D *12"C mm-I 4m--1 2to Hir>* r- n o oc42--4 KS OM zd^fc, i2--n| "a0 u0 > r|-- v Tj CO CO >O- o 4-4 to O5 o 9 o %g * V S 7i m r Wm H-i --4 t-- or m r in mo nm. -c< O m73 'H D CD 1--4 zo in i-h Hm >o rrn cr> 5 --I to OH =e oo oo s 'J s 'Nl 4* >'-j fM *-4 N 0 N 0 s 4--* o ro o cn ro cn cn cn cn in g Hm ro cn !- H Ul . VJ1 > > in H%H m h VO to *-- o o- cr o >-< to p ->< to >p-< to o>K to p t>*o< g >-< in >-to< Ho-* o >-< to O O Ci * <#P dP ooo dP dP v hO- VHO 00 H O->< p>-< o>1< 2 mto mH to to to o o dp o o dP n T3 so n C r-< ro >-- \D 00 >M 0411-0* 011 0 4r 00 41-4 r1o 'rsI1oi -p 041-04 010 4-* o 041-04 H-4 04l-04 -P 1 00 4-4 00 tnI I 00 ^4 \>I l - I 00 n SS rHn rID h 2C m> r McGCon 11980 Itsr As. .fc /? i/*. Lil_: i~/ktet 2 Cju>h fli/fR. RjtiLi \ .............. MSfra,nJ CoMpLffra ~feeU.tr* SXoio</etok> t Pa/mJl. L/mri, t* WfiJ .T/lyts fiFTifR ftfi.tr *r7; > ~ CcMfihtrTti . B-Ldtf Bm 3 *s nsr/f, -....... ........ V* Sa>-M/m6 Chaocrtrs ju - Bn\pa-g Q#kuJtfT S> .3. &y?Lerr --*//1 /Sem-rf.. ^ GcMpUmf Jtb --Jktir. -Ia/STXU ftHJVMS ) iftJtTfiS t jLs-6-s....... 6. JJt/srstll /04O IV tJtrac--fifrVfitFs. rm . rsf- ----V-/- T" 'Vi/ * ~ ItViraU BrjfJe MrvgTem Rrecto/ttro 7> ------------------------ - ...................... ............... 8. JHijsrfrJJ. Mo&se Cablr 0*J pfttJtu _ /l/w, - '>v. - Ref\n VoorJirvuiAi Lmr - ft*icsLedJt F&*h Rub* ------- -------------------- __... /2*. *S<yr_ Jhtsr XcuhtMuri &nrcftJ&trMtsfvietJ Jit,'Mil. . .. '?> . >' ' "-J: /d--Srr^AtuJetKcncrtt -- ~ IjuimlL Poibtrfi -PmT hrt, &uuU*-TfiCUft ^ p?) i RdStsrcr* Raotfi. . H TfrPf fsnrtr TfialjLtrV, )L>tsr, Bfifififi. A /- JjmrAii Rea Li ftr <P*j Tini-ici Pena. Znxi. JSfi. JjtSTAU puff yetf/iti Si&Vi. Cm SflKtf. lO/R.<f Bitot* Tftavfl /Hap/* pMp. I _ _ _ * Xt/sr/rU . Zcoo A-- fvs*$--jAt-J$6ir-laXj*L tifiiU.--________________ _____ _ .. .vi -.C'nty;f - dcMjiLuT* JfiJtAfso*/ J/*b Svsri/* t /htJ T**y KB*- ft* dJuro-x Dor \/ -jf - faff*tffi-- t Itofr,.U--Co^fi . /ifi Jib JUiST. Cur* UJtfhs __0*i:.lfott^H*h/..6tlLrerc>A Srn&s, dot\f>JLtmr Ctvtric Cat YetA/crelOai jLtAtrT,--* Ra'fnin . D&nntro-~R**t*rcK. Mj,ou --k.. :V.' XttsrfiU PhcAJtfnl - frU ^Pvtf* J^_. McGCon 11982 25 TON ORE BRIDGE GANTRY . ARMCO - HAMiLTON PLANT RE: ELECTRICAL INSTALLATION SCHEDULE - JULY 21 THRU JULY 23, 1981 TUES. 7/21 WED. 7/22 THUR. 7/23 1. INSTALL CONDUIT WHERE POSSIBLE (EXCEPT LIGHTING) 2. COMPLETE TERMINATIONS TO COLLECTOR RAILS. 1. INSTALL PULL BOX #7 S CONDUIT INTO PULL BOX *7. 2. COMPLETE COLLECTOR RAIL INSTALLATION @ "SPLIT" S ALIGN RAILS. 1. INSTALL PULL BOXES #25 THRU #31 ON MACH. DECK S INSTALL CONDUIT TO BOXES. (EXTRA WORK) (IF CRANE AVAILABLE TO ELECTRICIANS) 2. PULL WIRE WHERE POSSIBLE. (PROPOSED) FRI. 7/24 THRU 7/28 1. RE-INSTALL MISC. STARTERS, DISC. SWITCHES, ETC. ON EAST SECTION GIRDER. 2. RE-INSTALL CONDUIT TO MISC. STARTERS, ETC. 3. PULL WIRE. 4. SOME TERMINATIONS. McGCon 11983 D E S C R IP TIO N OF WORK COMPLETE CONDUIT AT GIRDER S P LIC E IN S TA LL LIG HTING FIXTURES PULL CABLE & WIRE TERMINATE WIRE & CABLE CHECK-OUT ELECTRICS *- O lO M S O' zin >--t rr~ n o r r* 0 ~m>--ni 73 nH5m--tSQih_--E< --oz>--Ii 9 m oZomiiTz) o1 H--i m H 73 O z n Mm 2 i--ZnI n o r7n3 8 h 2H 3H^ inc m oz --i LO O o in *3 o"0o m70' at "C irzH>n* OO 2TJ (- n mHrn. oci-i mm OM zin "=o*o= r>H~ aiot r* >. T> on CD O- >o-i 0m1 CD cn > o 53 in o (St Z o>o o o m12 rr m73 rCnD m (fl 7in3 7m3 <n -H 5cn H q n ss o7m0 -H "0 iHzn -wo >o 5 O H rrn rin CD O o o> cr> cn N NN s ro ro ro H- oo cn cn U1 cn cr gg >-< >-< cn cn o D >-< in o in OO >> -< -< cn in 00 O -< cn o o O o Oo dP dP dP 100% 45% ' 5% 7-21-81 8-10-81 8-4-81 8-14-81 CO i1 11 ro v-n -P 1 1 00 oo --* -- t Vj4 h- 1 00 M EST. START DATE 7 /2 0 7 /2 0 7 /2 7 8 /4 8 /1 7 EST. T IM E 7 DAYS 10 DAYS 10 DAYS 9 DAYS 5 DAYS PCT. COMPL C0MPL DATE ACTUAL T IM E McGCon 11984 25 TON ORE BRIDGE GANTRY ARMCO - HAMILTON PLANT i-V/ip----- // RE: ELECTRICAL INSTALLATION SCHEDULE - JULY 16 THRU 20 THUR. 7/16 TERMINATING 500 MCM CABLES IN MAIN LINE (2000A) DISC SWITCH. fOO, INSTALL PULL BOX #7 AND CONDUIT INTO PULL BOX #7. (jN^) ~O FRI MON 7/17 7/20 INSTALL (7) PULL BOXES C#25 THRU #31) ON TROLLEY MACHINERY DECK IF CRANE IS AVAILABLE CSEE NOTE #1); TERMINATE FEEDERS TO COLL. RAILS7 PULL WIRE ON EAST LEG - COMPLETE CONDUIT ON WEST LEG - QcMhCejC &% COMPLETE TERMINATIONS TO COLLECTOR RAILS __________obfo PROPOSED WORK - 7/21 THRU 24 1. COMPLETE ALL CONDUIT EXCEPT LIGHTING 2. SOME TERMINATIONS 3. INSTALL COLLECTOR RAILS AND ALIGN NOTE #1. NOTE #2. AS PER ITEM #15-A IN LETTER SUBMITTED BY MORGAN TO ARMCO - PULL BOXES #25 THRU #31 AND CONDUIT TO BOXES ON MACH. DECK WERE NOT INSTALLED AS STATED. (2) 100 HP TROLLEY MOTORS AND CD 275 HP HOIST MOTOR WERE NOT INSTALLED (MCGRAW ELECTRIANS INSTALLED) AS PER ITEM 13 (LETTER) PULL BOX #14 AND CONDUIT WERE NOT INSTALLED AS STATED. McGCon 11985 MCGRAW CONSTRUCTION COMPANY,INC/ENGINEERS G. CONSTRUCTORS POST OFFICE BOX 369 MIDDLETOWN, OHIO 45042 TELEPHONE 513 / 422-4521 25 TON ORE BRIDGE GANTRY ARMCO - HAMILTON PLANT RE: PROPOSED ELECT. INSTALLATION SCHEDULE - AUG. 5 THRU AUG. 7, 1981 WED. 8/5/81 1. TERMINATE LEGS - EAST S WEST 2. REPLACE DAMAGED WIRE IN CONTROL HOUSE 3. MOUNT LIMIT SWITCHES 4. TERMINATE TROLLEY SHOES 5. TERMINATE MAIN SHOES THUR. 8/6/81 - 1. START CROSSOVER RAILS INSTALLATION. 2. MOUNT ASSOCIATED GEAR FOR CAB, SIREN, H.W. LIGHT, H.D. HEATER FRI. 8/7/81 1. INSTALLATION OF CROSSOVER RAILS 2. RUN CONDUIT S WIRE FOR BLOWER MOTOR V V \ McGCon 11986 25 TON ORE BRIDGE GANTRY ARMCO - HAMILTON PLANT RE: ELECTRICAL INSTALLATION SCHEDULE - JULY 29 THRU JULY 31, 1981 WED. - 7/29 1. COMPLETE HOIST CABLE PULLS 2. TERMINATE HOIST A2 SI SPLICE BARS CO'X^^T^ THURS.- 7/30 1. REWORK COLLECTOR (TROLLEY) CONDUIT 8 SUPPORTS Co^yLeK- 2. PULL TROLLEY CABLE pf 3. MAKE THROAT FOR HOIST LIMIT. > / FRI. - 7/31 1. PULL MAIN MAG. FEED 2. TERMINATE MAIN MAG. TROLLEY FEED Com/<, <f Vt' ' /M (PROPOSED WORK) - COMPLETE 500 MCM PULL TERMINATE. MON. 8-3-81 PULL CONTROLS TO CAB TERMINATE. THRU REPLACE DAMAGE WIRE IN CONT. HOUSE. WED. 8-5-81 START INSTALLING CROSS OVER RAILS. MOUNT TROLLEY SLOW DOWN LIMITS. McGCon 11987 I \ ( o <1 <_l ZD H U< CP o K\ LA CM N H 4" H SN 00 N 00 CO 00 _J tfP a. o o t3S o o Ol U fO VsoV <O#* V<so o <S -i X v$ .fj ^ L \h H UJ in Ui >--* - in >.a< 00 <n >- i>n- << QO LrHA Ho to to to in in in in in >- >- >- >- >- >- >- ><< < < < < < < a aoQQQQQ Ho f-s O r^s roH o r*H CP in i-- UJ in LA ID H h- *-h r--1 CM in < < LU H o s ID \N ID ID to ID CM Ooo o CM rH CM CM CM N NX N iD f'v 1^. I"*. CD UJ ho CO -J to _l UJ _J u in H -J CL 1--1 H- --1 < o< UJ < 10 -J UJ 2 PUJ to r" !--* in _J Q 2 CL H *--4 o tL << Q. uJ in o HH ZD UJ _l UJ CL 1-- W> UJ a CO _J to UJ in X u to cl z o < Q UJ or H < to o OL o co CL 0L o UJ UJ oi to o U.) b--* ZD UJ 5 U. UJ K z H nc uo UJ o -J CL -J -* z (Ol ID P o --* to h~ X --* _J CO < in tto 2 o -4 ha >-4 in 0\ H O Q rH s 3*: CO CO CL v CP H t--< UJ Dh Q UJ 2 -J O CL U ox <O h 0C to M ID O to --t H XO UJ <o 1to z zo l-H UJ u oc h UJ 1 _l UI < XL. uo <O UJ --1 X s to z o h>--* z> a iD K2-4 h- 0L CO UJ oc DC f-u UJ b-* _J z X CO --i -J h- _l o CD ?: UJ U o u --i UJ o in UJ O .J -J s < 00 H in 2 K-* o UJ UJ 0L --1 _J u _l < 1- rm to Z t--i cn UJ a: Q. _J in _l < H fin tt-- to < D z UJ Q -4 Z UJ 7 o aOo s UI id to Z oc 2 111 o UJ *-- T. --4 H O H C X H U UJ id i--i U.) H K- 3 OL u. -J to UJ < o _i _j < Hto Z *--i UJ H LJ _j CL T o U -J < H in z KH <r (3 -j ZD CL UJ < 2 X c2 iu h* 5 o i x u UJ X6 1A ID N OO O' O McGCon 11988 McGRAW CONSTRUCTION COMPANY, INC./ENGINEERS & CONSTRUCTORS MEMORANDUM CONT.NO. TO: FROM: SUBJECT: Q- R. Reeder n. R. Patel Contract No. 1294 Erection of Ore Bridge Armco Inc. Hamilton, Ohio DATE: August 4, 1981 Please bill Armco Inc. 90 per cent as of August 1, 1981. We are attaching a Schedule as a supporting document. NRPrhr McGCon 11990 * MCGRAW CONSTRUCTION COMPANY, INC./ENGINEERS & CONSTRUCTORS POST OFFICE BOX 369 MIDDLETOWN. OHIO 45042 TELEPHONE 513 / 422-4521 November 11, 1981 Armco Inc. East Works Engineering Middletown, Ohio 45043 Attention: Mr. Clyde E. Hanes Subject: One (1) 25-Ton Morbox Ore Bridge Gantry Crane Installation McGraw Contract No. 1294 Armco Purchase Order No. 541-280-12950 Gentlemen: We respectfully request that subject Purchase Order be adjusted, based upon the following considerations. The additional amounts to be added to the basic Purchase Order for the additional work performed by McGraw should be as follows: 1. McGraw Proposal No. 4091, Addendum No. 1, dated May 26, 1981 - The amount for this item was approved by Armco Inc. prior to the start of the work - FIVE THOUSAND SEVEN HUN DRED TWENTY DOLLARS ($5, 720. 00). 2. Work performed by McGraw to rework the Morgan Equipment was approved by Armco's representative during the course of construction. All time cards for such work were approved and signed by your representative. The accumulated craft hours to perform this work were 126. The total amount for this item, including fringe benefits and profit, is THREE THOUSAND TWO HUNDRED EIGHTYEIGHT DOLLARS AND TWENTY CENTS ($3, 288.20). McGCon 11992 I MCGRAW CONSTRUCTION COMWNK INC ENGINEERS & CONSTRUCTORS Armco Inc. November 11, 1981 Page - 2 The total addition of Nine Thousand Eight Dollars and Twenty Cents ($9, 008. 20) to the original Purchase Order of TWO HUNDRED NINETY-FOUR THOUSAND DOLLARS ($294, 000. 00) adjusts the final Contract Amount to THREE HUNDRED THREE THOUSAND EIGHT DOLLARS AND TWENTY CENTS ($303, 008. 20). We are enclosing the Invoice for final payment. Should you need any further information, please let us know. Sincerely yours. McGRAW CONSTRUCTION COMPANY, INC. Enclosure McGCon 11993 MCGRAW CONSTRUCTION COMPANY, INC./ENGINEERS & CONSTRUCTORS POST OFFICE BOX 369 MIDDLETOWN. OHIO 45042 TELEPHONE 513 / 422-4521 CHARGE TO Armco Inc. P. O. Bex 1888 Middletown, Ohio 45848 L November 11, 1981 DATE___________________________________ _ "I 11-2 INVOICE NUMBER- CONT. NUMBER- J Terms: Net 15 Days M01284 PAY TOTAL AMOUNT SHOWN IN THIS COLUMN Re: Your Purchase Order No. 54128012850 Dated Jane 28. 1881 Final Charge 282-1988-0171-1254 Furnish all supervision, labor, tools, construction equipment and incidental supplies required to receive, unload, asaemble, erect and put into operation one (1) Morgan 25-ton capacity Morboa Ore Bridge Gantry Crane. Total Contract Price: $ 284,808,88 Construction Completed to Date: 108% Less: Amount Previously Billed 284,088, 88 (284,880 80) TOTAL AMOUNT DUE ON THIS INVOICE 8 28.400 Certified correct ns of this billing date. McGRAW CONSTRUCTION COMPANY. INC. By:_______________ __________________________ Q. R. Reeder, Adm. Vice Prealdeat aba COPY McGCon 11994 A- 1 5-M