1. ALL LIGHTING FIXTURES, SWITCHES AND RECEPTACLES, INCLUDING CONDUIT AND WIRE TO BE INSTALLED COMPLETE.
2. CONDUIT TO BE RE-INSTALLED BETWEEN PB #12 AND PB 13. CONDUIT TO BE RE-INSTALLED BETWEEN PB 7 AND PB 8. CONDUIT TO BE RE-INSTALLED BETWEEN PB 7 AND PB 6.
3. CONDUIT BELOW PB 9, EXCEPT TO PB 11, TO BE RE-INSTALLED. CONDUIT BETWEEN PB 10, 2000 AMP SWITCH, 200 AMP SWITCH IS EXISTING.
4. INTERCONNECTING CONDUIT BETWEEN MACHINERY DECK, CAB AND CONTROL HOUSE TO BE RE-INSTALLED AND WIRE TO BE PULLED AND TERMINATED.
5. 4" CONDUIT FROM PB 14 TO PB 13 TO BE RE-INSTALLED AND CONDUIT FROM PB 16 DOWN TO LEG SILL TO BE RE-INSTALLED EXCEPT CONDUIT TO PB 17.
6. ALL WIRING TO BE RE-PULLED FROM PB 6 DOWN EAST LEG AND TERMINATED. 7. ALL WIRING TO BE RE-PULLED FROM PB 12 VIA PB 13 DOWN THE WEST LEG AND TERMINATED.
THE FOREGOING IS BASED ON OUR INTERPRETATION OF THE LETTER TO MR C. HANES FROM MORGAN CRANE. DATED MARCH 31, 1981. THE ELECTRICAL ESTIMATE DOES NOT INCLUDE ANY MATERIAL (CONDUIT, FIXTURES, ETC), CHECKING OUT THE SYSTEM OR INSTALLING CONNECTING CRANE HOT RAILS, OR ELECTRICAL SERVICE TO ORE BRIDGE CRANE.
McGCon 11975
DDUL, riUIN i t KAiNSMi 1 1 AL DATF.
SHEET May 29, 1981
TO Mr. Cliff Schroff - McGraw Field Office
BD PRINTS TO JOB
FROM
DiQk Pruett
SUBJECT Erecting Ore Bridge in Hamilton Plant Contract No. 1294
PRINTS TO DIVISION PRINTS TO OTHERS
WE ARE SENDING YOU HEREWITH THE FOLLOWING PRINTS: (DESTROY ALL FORMER
PRINTS OF THESE NUMBERS)
Drawings from Morgan Engineering
C-385356 C-385357 C-385395 C-385396 C-385397 C-385416 C-385552 C-381792 C-385135 - Sh. 1 of 2 C-385135 - Sh. 2 of 2 C-385136 - Sh. 1 of 4 C-385136 - Sh. 2 of 4 C-385136 - Sh. 3 of 4 C-385136 - Sh. 4 of 4 C-385137 C-385138 C-385322 C-385323 C-385324 C-385326 C-385350 C-385380 C-385382
C-385383 D-385392 D-385400 D-385410 D-385412 D-385413 D-385415 D-385414 D-38 5475 - 1/2 D-385475 - 2/2 ' D-385476 - 1/2 D-385476 - 2/2 D-385477 - 1/7 D-385477 - 2/7 D-385477 - 3/7 D-385477 - 4/7 D-385477 - 5/7 D-385477 - 6/7 D-385477 - 7/7 D-385479 D-385496 D-385500 D-385504 - 1/2
D-385504 - 2/2 D-385515 D-385517 D-385520 D-385524
PRINTS RELEASED FOR: ft CONSTRUCTION EXCAVATION STUDY
BLUE PRINT TRANSMITTAL RECEIPT
SHEET
BLUEPRINTS RECEIVED BY.
DATE
THIS RECEIPT TO BE RETURNED TO ARMCO MIDD. WKS. ENGR. OFFICE MIDDLETOWN, OHK
m.mm.s
McGCon 11976
CRANE #7834 - ELECTRICAL INSTALLATION 1. CONDUIT - RE-INSTALL AND TERMINATE 2. CABLE - RE-PULL AND TERMINATE 3. PULL BOXES - RE-INSTALL 4. LIGHTING, RECEPTACLES AND SWITCHES 5. MISCELLANEOUS 6. WIRE TAGGING 7. CHECKOUT, INCLUDING MEGGERING 8. COLLECTOR RAIL C216f-0'O
100 MH 337 MH
35 MH 200 MH
50 MH 330 MH 115 MH 225 MH
437 .472 672 722 1052 1167 1392
McGCon 11977
25 TON ORE BRIDGE GANTRY ARMCO - HAMILTON PLANT
RE: ELECTRICAL INSTALLATION SCHEDULE - JULY 29 THRU JULY 31, 1981
WED. - 7/29
1. COMPLETE HOIST CABLE PULLS 2. TERMINATE HOIST A2 8 SI SPLICE BARS
THURS.- 7/30
1. REWORK COLLECTOR (TROLLEY) CONDUIT 8 SUPPORTS 2. PULL TROLLEY CABLE 3. MAKE THROAT FOR HOIST LIMIT.
FRI. - 7/31
1. PULL MAIN MAG. FEED 2. TERMINATE MAIN MAG. 8 TROLLEY FEED
(PROPOSED WORK) - COMPLETE 500 MCM PULL 6 TERMINATE.
MON. 8-3-81
PULL CONTROLS TO CAB 8 TERMINATE.
THRU
REPLACE DAMAGE WIRE IN CONT. HOUSE.
WED. 8-5-81
START INSTALLING CROSS OVER RAILS.
MOUNT TROLLEY SLOW DOWN LIMITS.
McGCon 11978
25 TON ORE BRIDGE GANTRY ARMCO - HAMILTON PLANT
RE: ELECTRICAL INSTALLATION SCHEDULE - JULY 21 THRU JULY 23, 1981
TUES. 7/21 WED. 7/22 THUR. 7/23
1. INSTALL CONDUIT WHERE POSSIBLE (EXCEPT LIGHTING) ft)
2. COMPLETE TERMINATIONS TO COLLECTOR RAILS.
*?0%
1. INSTALL PULL BOX #7 S CONDUIT INTO PULL BOX #7.
2. COMPLETE COLLECTOR RAIL INSTALLATION @ "SPLIT" S ALIGN RAILS.
CQrtpLk' 7ti,
1. INSTALL PULL BOXES #25 THRU #31 ON MACH. DECK 6 INSTALL CONDUIT TO BOXES. (EXTRA WORK) (IF CRANE AVAILABLE TO ELECTRICIANS)
2. PULL WIRE WHERE POSSIBLE.
0c/^i>Cc7e W ptLcCCZZ
(PROPOSED)
FRI. 7/24 THRU 7/28
1. RE-INSTALL MISC. STARTERS, DISC. SWITCHES,
ON EAST SECTION GIRDER.
.2 RE-INSTALL CONDUIT TO MISC. STARTERS, ETC.
3. PULL WIRE.
4. SOME TERMINATIONS.
/ fj r'UoCS i
McGCon 11979
t-4 o x> 00 'O C7> VO
F
N> 4--
Ktfs* C kr *>, p
t 'o $i p r^ r tv * S > *> ct. * s **
*3
2
orn X( QcH
m rmotd?-Ho oto
Hm
52--4
mZPH sM: m CO o
uj
rm~
TJ rcr
o to fi
CO s4--:4 m/W
1--4
Zto H rn>~ r4--4 O X1H--4 tZ|> 1--n4 X H
71
m in
n Q 2u rrHmn oo uc*z--4 H >H O
71 o m
M tzo H nr>~ norr~ to ortXon
(S>
*>n mH
71
roHm7n3 oz
> Mr o Z
S3
(O s:
rn 1--4
nH
4H-< OZ
sQXHlOI
omH QZ Mo 7> O
r4--1 OXH--i z0
1 73
m3--4 Zto r> r*
ro n
mo 71 o
>o
z
in r CD O
n*7 7m1--14
n 4c--4 H
mhtO> H to m
tZo
-4
r>r~*
nH
42-H to
(D
4--4
n to
O73 >H
m
73
O
7H3 m
71
in
73 m e>
T) CO *=s=| n D *12"C mm-I
4m--1 2to Hir>* r-
n o oc42--4
KS
OM
zd^fc, i2--n|
"a0 u0
> r|--
v Tj
CO CO
>O-
o
4-4
to
O5 o
9 o
%g
* V S
7i m r Wm
H-i --4 t--
or m r in
mo
nm. -c<
O m73
'H
D
CD
1--4 zo in i-h Hm >o
rrn
cr> 5 --I to OH
=e
oo oo s 'J s 'Nl
4*
>'-j
fM *-4
N 0
N 0
s 4--* o
ro o
cn ro cn
cn
cn
cn
in g Hm
ro cn
!- H Ul . VJ1
> > in H%H m h
VO
to
*-- o
o-
cr
o >-< to
p ->< to
>p-< to
o>K to
p t>*o<
g >-< in
>-to<
Ho-* o >-< to
O O Ci
*
<#P dP
ooo
dP dP v
hO- VHO 00 H
O->< p>-<
o>1<
2 mto mH
to to to
o o dp
o o dP
n T3
so n
C r-< ro >--
\D
00
>M
0411-0*
011 0 4r
00 41-4
r1o
'rsI1oi
-p 041-04
010 4-*
o 041-04
H-4 04l-04
-P 1 00 4-4
00
tnI I
00
^4
\>I l - I
00
n SS rHn rID
h 2C m>
r
McGCon 11980
Itsr As. .fc /? i/*.
Lil_: i~/ktet 2 Cju>h fli/fR.
RjtiLi
\
..............
MSfra,nJ
CoMpLffra ~feeU.tr* SXoio</etok> t Pa/mJl. L/mri,
t* WfiJ .T/lyts fiFTifR
ftfi.tr *r7;
> ~ CcMfihtrTti . B-Ldtf Bm 3 *s nsr/f, -....... ........ V*
Sa>-M/m6 Chaocrtrs ju - Bn\pa-g Q#kuJtfT
S>
.3.
&y?Lerr --*//1
/Sem-rf..
^ GcMpUmf Jtb --Jktir.
-Ia/STXU ftHJVMS ) iftJtTfiS t jLs-6-s.......
6. JJt/srstll /04O IV tJtrac--fifrVfitFs.
rm
. rsf-
----V-/- T" 'Vi/ *
~ ItViraU BrjfJe MrvgTem Rrecto/ttro
7> ------------------------
- ...................... ...............
8. JHijsrfrJJ. Mo&se Cablr 0*J pfttJtu _ /l/w,
- '>v.
- Ref\n VoorJirvuiAi Lmr - ft*icsLedJt
F&*h Rub*
------- --------------------
__...
/2*. *S<yr_ Jhtsr XcuhtMuri &nrcftJ&trMtsfvietJ Jit,'Mil.
. .. '?>
. >'
' "-J:
/d--Srr^AtuJetKcncrtt --
~ IjuimlL Poibtrfi -PmT hrt, &uuU*-TfiCUft ^
p?)
i RdStsrcr* Raotfi.
.
H TfrPf fsnrtr TfialjLtrV, )L>tsr, Bfifififi.
A
/- JjmrAii Rea Li ftr <P*j Tini-ici Pena. Znxi.
JSfi. JjtSTAU puff yetf/iti Si&Vi. Cm SflKtf.
lO/R.<f Bitot* Tftavfl /Hap/* pMp. I _ _ _
* Xt/sr/rU . Zcoo A-- fvs*$--jAt-J$6ir-laXj*L
tifiiU.--________________ _____
_
..
.vi -.C'nty;f
- dcMjiLuT* JfiJtAfso*/ J/*b Svsri/* t /htJ
T**y KB*- ft* dJuro-x Dor
\/
-jf
- faff*tffi-- t Itofr,.U--Co^fi . /ifi Jib JUiST.
Cur* UJtfhs __0*i:.lfott^H*h/..6tlLrerc>A Srn&s,
dot\f>JLtmr Ctvtric Cat YetA/crelOai jLtAtrT,--*
Ra'fnin . D&nntro-~R**t*rcK. Mj,ou --k..
:V.'
XttsrfiU PhcAJtfnl -
frU ^Pvtf* J^_.
McGCon 11982
25 TON ORE BRIDGE GANTRY . ARMCO - HAMiLTON PLANT
RE: ELECTRICAL INSTALLATION SCHEDULE - JULY 21 THRU JULY 23, 1981
TUES. 7/21 WED. 7/22 THUR. 7/23
1. INSTALL CONDUIT WHERE POSSIBLE (EXCEPT LIGHTING)
2. COMPLETE TERMINATIONS TO COLLECTOR RAILS.
1. INSTALL PULL BOX #7 S CONDUIT INTO PULL BOX *7.
2. COMPLETE COLLECTOR RAIL INSTALLATION @ "SPLIT" S ALIGN RAILS.
1. INSTALL PULL BOXES #25 THRU #31 ON MACH. DECK S INSTALL CONDUIT TO BOXES. (EXTRA WORK) (IF CRANE AVAILABLE TO ELECTRICIANS)
2. PULL WIRE WHERE POSSIBLE.
(PROPOSED)
FRI. 7/24 THRU 7/28
1. RE-INSTALL MISC. STARTERS, DISC. SWITCHES, ETC. ON EAST SECTION GIRDER.
2. RE-INSTALL CONDUIT TO MISC. STARTERS, ETC.
3. PULL WIRE. 4. SOME TERMINATIONS.
McGCon 11983
D E S C R IP TIO N OF WORK
COMPLETE CONDUIT AT GIRDER S P LIC E IN S TA LL LIG HTING FIXTURES PULL CABLE & WIRE
TERMINATE WIRE & CABLE CHECK-OUT ELECTRICS
*- O lO M S O'
zin >--t rr~ n
o r r*
0
~m>--ni
73
nH5m--tSQih_--E< --oz>--Ii
9
m
oZomiiTz)
o1
H--i
m H 73
O z
n Mm
2 i--ZnI
n o
r7n3
8
h
2H 3H^
inc
m oz --i
LO O
o in
*3
o"0o m70'
at "C
irzH>n*
OO 2TJ
(-
n
mHrn. oci-i
mm
OM
zin "=o*o= r>H~ aiot r*
>. T> on CD
O- >o-i
0m1 CD
cn >
o
53
in o
(St Z
o>o
o
o
m12 rr
m73 rCnD
m
(fl 7in3 7m3 <n
-H
5cn
H
q n
ss
o7m0
-H "0
iHzn -wo
>o
5 O
H
rrn rin
CD
O
o
o> cr> cn
N
NN
s
ro ro
ro H-
oo
cn
cn U1
cn
cr gg >-< >-< cn cn
o D >-< in
o in OO >> -< -< cn in
00
O -< cn
o o
O
o
Oo
dP dP dP
100%
45% '
5%
7-21-81 8-10-81 8-4-81
8-14-81
CO i1 11 ro v-n
-P 1 1 00 oo --* --
t Vj4 h-
1 00 M
EST. START
DATE
7 /2 0 7 /2 0 7 /2 7
8 /4 8 /1 7
EST. T IM E
7 DAYS 10 DAYS 10 DAYS
9 DAYS 5 DAYS
PCT.
COMPL
C0MPL DATE
ACTUAL T IM E
McGCon 11984
25 TON ORE BRIDGE GANTRY ARMCO - HAMILTON PLANT
i-V/ip----- //
RE: ELECTRICAL INSTALLATION SCHEDULE - JULY 16 THRU 20
THUR. 7/16 TERMINATING 500 MCM CABLES IN MAIN LINE (2000A) DISC SWITCH.
fOO,
INSTALL PULL BOX #7 AND CONDUIT INTO PULL BOX #7. (jN^)
~O
FRI MON
7/17 7/20
INSTALL (7) PULL BOXES C#25 THRU #31) ON TROLLEY MACHINERY DECK IF CRANE IS AVAILABLE CSEE NOTE #1); TERMINATE FEEDERS TO COLL. RAILS7
PULL WIRE ON EAST LEG - COMPLETE CONDUIT ON WEST LEG - QcMhCejC &%
COMPLETE TERMINATIONS TO COLLECTOR RAILS
__________obfo
PROPOSED WORK - 7/21 THRU 24 1. COMPLETE ALL CONDUIT EXCEPT LIGHTING 2. SOME TERMINATIONS 3. INSTALL COLLECTOR RAILS AND ALIGN
NOTE #1. NOTE #2.
AS PER ITEM #15-A IN LETTER SUBMITTED BY MORGAN TO ARMCO - PULL BOXES #25 THRU #31 AND CONDUIT TO BOXES ON MACH. DECK WERE NOT INSTALLED
AS STATED.
(2) 100 HP TROLLEY MOTORS AND CD 275 HP HOIST MOTOR WERE NOT INSTALLED
(MCGRAW ELECTRIANS INSTALLED) AS PER ITEM 13 (LETTER) PULL BOX #14 AND CONDUIT WERE NOT INSTALLED AS STATED.
McGCon 11985
MCGRAW CONSTRUCTION COMPANY,INC/ENGINEERS G. CONSTRUCTORS
POST OFFICE BOX 369 MIDDLETOWN, OHIO 45042 TELEPHONE 513 / 422-4521
25 TON ORE BRIDGE GANTRY ARMCO - HAMILTON PLANT
RE: PROPOSED ELECT. INSTALLATION SCHEDULE - AUG. 5 THRU AUG. 7, 1981
WED. 8/5/81
1. TERMINATE LEGS - EAST S WEST 2. REPLACE DAMAGED WIRE IN CONTROL HOUSE 3. MOUNT LIMIT SWITCHES 4. TERMINATE TROLLEY SHOES 5. TERMINATE MAIN SHOES
THUR. 8/6/81 - 1. START CROSSOVER RAILS INSTALLATION.
2. MOUNT ASSOCIATED GEAR FOR CAB, SIREN, H.W. LIGHT, H.D. HEATER
FRI. 8/7/81
1. INSTALLATION OF CROSSOVER RAILS 2. RUN CONDUIT S WIRE FOR BLOWER MOTOR
V
V \
McGCon 11986
25 TON ORE BRIDGE GANTRY ARMCO - HAMILTON PLANT
RE: ELECTRICAL INSTALLATION SCHEDULE - JULY 29 THRU JULY 31, 1981
WED. - 7/29
1. COMPLETE HOIST CABLE PULLS 2. TERMINATE HOIST A2 SI SPLICE BARS
CO'X^^T^
THURS.- 7/30
1. REWORK COLLECTOR (TROLLEY) CONDUIT 8 SUPPORTS Co^yLeK-
2. PULL TROLLEY CABLE
pf
3. MAKE THROAT FOR HOIST LIMIT.
>
/
FRI. - 7/31
1. PULL MAIN MAG. FEED 2. TERMINATE MAIN MAG. TROLLEY FEED
Com/<, <f Vt' ' /M
(PROPOSED WORK) - COMPLETE 500 MCM PULL TERMINATE.
MON. 8-3-81
PULL CONTROLS TO CAB TERMINATE.
THRU
REPLACE DAMAGE WIRE IN CONT. HOUSE.
WED. 8-5-81
START INSTALLING CROSS OVER RAILS.
MOUNT TROLLEY SLOW DOWN LIMITS.
McGCon 11987
I
\ (
o
<1 <_l ZD H U<
CP o K\ LA CM N H 4" H SN
00 N 00 CO 00
_J tfP a. o o t3S o o Ol U
fO
VsoV <O#* V<so o <S -i X
v$ .fj ^ L \h
H UJ
in
Ui
>--*
-
in >.a< 00
<n >-
i>n-
<<
QO
LrHA Ho
to to to in in in in in >- >- >- >- >- >- >- ><< < < < < < < a aoQQQQQ
Ho
f-s
O
r^s
roH
o
r*H
CP
in
i-- UJ in LA ID
H h-
*-h
r--1 CM
in < < LU H o
s
ID
\N
ID ID
to
ID CM
Ooo o CM rH CM CM CM
N
NX
N
iD
f'v 1^.
I"*.
CD
UJ
ho
CO -J
to _l UJ _J u
in H
-J
CL
1--1 H- --1
<
o<
UJ < 10 -J
UJ 2
PUJ
to r" !--* in
_J Q 2
CL
H *--4
o tL
<< Q. uJ in
o
HH
ZD UJ
_l UJ CL
1-- W> UJ
a CO
_J to UJ in
X u to
cl z
o < Q UJ
or H < to
o OL
o co CL 0L
o UJ
UJ oi to
o U.)
b--* ZD
UJ
5 U.
UJ
K z H nc
uo
UJ
o -J CL -J -*
z (Ol ID P
o --*
to
h~
X --*
_J CO < in
tto
2 o -4
ha >-4
in 0\ H O
Q rH s 3*:
CO CO
CL v CP
H t--< UJ
Dh Q UJ 2 -J
O CL U ox
<O h 0C to M
ID O to --t H XO
UJ
<o 1to z zo l-H
UJ u oc h
UJ 1
_l UI < XL.
uo
<O
UJ --1
X s to z o
h>--* z> a
iD K2-4 h-
0L
CO
UJ oc
DC f-u UJ
b-* _J z X CO --i -J
h- _l o CD
?: UJ
U o u --i UJ
o in UJ
O
.J -J s < 00 H in
2 K-* o UJ UJ 0L --1
_J u _l
< 1- rm to Z t--i cn UJ a: Q.
_J in
_l
< H
fin
tt--
to < D z UJ Q -4 Z
UJ 7 o
aOo
s UI id to Z oc 2 111 o UJ *-- T. --4 H O H C X H U UJ id i--i U.) H K- 3 OL u. -J to UJ <
o
_i _j < Hto Z *--i
UJ H LJ _j CL
T o
U
-J
< H in z KH
<r (3
-j ZD
CL
UJ
< 2
X c2 iu h*
5 o
i x u UJ
X6
1A ID N OO O' O
McGCon 11988
McGRAW CONSTRUCTION COMPANY, INC./ENGINEERS & CONSTRUCTORS
MEMORANDUM
CONT.NO.
TO: FROM: SUBJECT:
Q- R. Reeder
n. R. Patel
Contract No. 1294 Erection of Ore Bridge Armco Inc. Hamilton, Ohio
DATE: August 4, 1981
Please bill Armco Inc. 90 per cent as of August 1, 1981. We are attaching a Schedule as a supporting document.
NRPrhr
McGCon 11990
*
MCGRAW CONSTRUCTION COMPANY, INC./ENGINEERS & CONSTRUCTORS
POST OFFICE BOX 369 MIDDLETOWN. OHIO 45042 TELEPHONE 513 / 422-4521
November 11, 1981
Armco Inc. East Works Engineering Middletown, Ohio 45043
Attention: Mr. Clyde E. Hanes
Subject:
One (1) 25-Ton Morbox Ore Bridge Gantry Crane Installation McGraw Contract No. 1294 Armco Purchase Order No. 541-280-12950
Gentlemen:
We respectfully request that subject Purchase Order be adjusted, based upon the following considerations.
The additional amounts to be added to the basic Purchase Order for the additional work performed by McGraw should be as follows:
1. McGraw Proposal No. 4091, Addendum No. 1, dated May 26, 1981 - The amount for this item was approved by Armco Inc. prior to the start of the work - FIVE THOUSAND SEVEN HUN DRED TWENTY DOLLARS ($5, 720. 00).
2. Work performed by McGraw to rework the Morgan Equipment was approved by Armco's representative during the course of construction. All time cards for such work were approved and signed by your representative. The accumulated craft hours to perform this work were 126. The total amount for this item, including fringe benefits and profit, is THREE THOUSAND TWO HUNDRED EIGHTYEIGHT DOLLARS AND TWENTY CENTS ($3, 288.20).
McGCon 11992
I
MCGRAW
CONSTRUCTION COMWNK INC ENGINEERS & CONSTRUCTORS Armco Inc. November 11, 1981 Page - 2
The total addition of Nine Thousand Eight Dollars and Twenty Cents ($9, 008. 20) to the original Purchase Order of TWO HUNDRED NINETY-FOUR THOUSAND DOLLARS ($294, 000. 00) adjusts the final Contract Amount to THREE HUNDRED THREE THOUSAND EIGHT DOLLARS AND TWENTY CENTS ($303, 008. 20). We are enclosing the Invoice for final payment. Should you need any further information, please let us know. Sincerely yours. McGRAW CONSTRUCTION COMPANY, INC.
Enclosure
McGCon 11993
MCGRAW CONSTRUCTION COMPANY, INC./ENGINEERS & CONSTRUCTORS
POST OFFICE BOX 369 MIDDLETOWN. OHIO 45042 TELEPHONE 513 / 422-4521
CHARGE TO
Armco Inc. P. O. Bex 1888 Middletown, Ohio 45848
L
November 11, 1981
DATE___________________________________ _
"I
11-2
INVOICE NUMBER-
CONT. NUMBER-
J Terms: Net 15 Days
M01284
PAY TOTAL AMOUNT SHOWN IN THIS COLUMN
Re: Your Purchase Order No. 54128012850 Dated Jane 28. 1881 Final Charge 282-1988-0171-1254
Furnish all supervision, labor, tools, construction equipment and incidental supplies required to receive, unload, asaemble, erect and put into operation one (1) Morgan 25-ton capacity Morboa Ore Bridge Gantry Crane.
Total Contract Price: $ 284,808,88
Construction Completed to Date: 108%
Less: Amount Previously Billed
284,088, 88 (284,880 80)
TOTAL AMOUNT DUE ON THIS INVOICE
8 28.400
Certified correct ns of this billing date. McGRAW CONSTRUCTION COMPANY. INC. By:_______________ __________________________
Q. R. Reeder, Adm. Vice Prealdeat aba
COPY
McGCon 11994
A- 1 5-M