Document v1vdo7E0oymKvMLvNGMwO7NVE

Roofing Division December 17, 1987 bcc: Mr Chamberlain Mr Hardy Mr Maloof Mr Patenaude File Mr Bernard Welch Bernie's Roofing and Siding Company 1030 Tolland Street East Hartford CT 06108 RE: SAINT ROSE SCHOOL 21 CHURCH STREET EAST HARTFORD CT 06108 Dear Mr. Welch: The ponding of water on any given roofing system is a bad practice. It leads to roof problems. Bird will not warrant any sections of its built-up roofing systems that hold ponded water over 24 hours. It is the responsibility of the designer and contractor to make certain that there are the proper number of drainage outlets to shed water off the roofing membranes. Thank you. Sincerely, Clifford J Patenaude Division Chemist CJP/bd BIRD 011308 >/ Bird Roofing Products Memo To: Cliff Patenaudb From:. MRoNHlliJe- C/Hhan4 berlaln Ct.. Saint Rose School, 2l Charoh St., East Hertford, Ct.. 06108 U/30/87" ouDjeci: --..... ------, --------- Date: _____________ Contractor: Bernie's Roofing & Siding Co. 1030 Tolland St., East Hartford, Ct* 0610$ / Specs: Poured Gypstun Back, Vapor Barrier, l~l/2 *" Biberboard Insul,., ' Bird 43# BAbq Sheet, y ply Asbestos Felt Coated. Smooth Surface 20 year roof Problear Roof ponds water and splits membranes. Berates Roofing makes repairs to this roof every year since application. They installed drains to eleviate the ponding, but the water still builds up on the roof. The architect wants Bernie to repair this' roof until 19$9 at kix Bemie's Expense. Bernie wants Bird to write him a letter stating that Bird will not be responsible /^ for their material on roofs that pond water. Please incorporate this in s. formal letter end send it to Bernie's Rfg at the' above address to the Attention of Barnard Welch. ( BIRD 011309