Document v1m2az3bxQLBVv3jxR4QkRgOY
(
COMPANY U.S.A.
POST OFFICE BOX 1512 HOUSTON, TEXAS 77001 "STANSHIP HOUSTON"
^MARINE DEPARTMENT
J. H SWARTZ OPERATIONS MANAGER
A O. MOOKHOEK FLEET & BRANCH MANAGER
L. H. EARLE MARINE ADVISOR
H J. 0ORGEN MAINTENANCE & SERVICES MANAGER
Commanding Officer Marine Inspection Office U. S. Coast Guard Hampton Roads 300 E. Main Street Norfolk, Virginia 23501
September 14, 1978 EXXON WASHINGTON
Dear Sir:
The EXXON WASHINGTON, O.N. 273896, will enter a shipyard on or about October 12, 1978 for biennial inspection, dry docking, ABS 4 year hull survey, and repairs. The Coast Guard Certificate of Inspection will expire on October 14, 1978.
The tail shaft was last drawn in September 1974 at Newport News, Virginia and has operated satisfactorily since that time, and it is in compliance with 46 CFR 61.20-15 (b) (3).
Based on the above and in accordance with 46 CFR 61.20-15 (3), it is requested that the drawing of the tail shaft be extended for two years. At the dry dock period mentioned in the above first paragraph, the requirements 46 CFR 61.20-15 (3) (2) will be complied with. 46 CFR 61.20-15 (e),(2),(3),and (4) were conducted at the vessel's tail shaft drawing September 1974.
It is also requested that the present due date of September 1978 be extended to coincide with the Certificate of Inspection expiration date pending the granting of the two year extension.
Sincerely,
Jl.
E. J, Worrel, Jr. Asst. Repair Superintendent
EJW: bt
c: Master EXXON WASHINGTON
Mr. H. P, Leyendecker
A DIVISION OF EXXON CORPORATION
EXX-MOR-008558