Document v1ke2XvVxg7k1Y3GyQM5G7Mg8
ST0U082U0
FIRED' TECHNICAL NOTES FOR SHELL HEATERl AND TUBE HEAT EXCHANGERS
DIVISION
TS REQ.. HEDD-67095
PACE 1 of' 12
REVISION 1
date
May 1977
SHELL AND TUBE EXCHANGER DESIGNS INDEX
I. o 2. 0 3. 0 4. 0 5. 0 6. 0 7. 0 B. 0 9. 0 10. 0 11.0 12. 0 13. 0 14. 0 15. 0 i 6. 0 17. 0 18. 0
Scope Specifications Materials Thicknesses Weld Details Gaskets Nozzles Tubes and Tubesheets Floating Heads and Channels Tube Bundles Provisions for Maintenance Bolting Stacked Exchangers Nameplate and Warning Plate Testing Preparation for Shipment Drawings Manufacturer's Reports
50760 B- 4 -4 005 -63-
2- m 1977
FLU 02 r.r: H -l.tiUlN) LTD.
APPROVED'
Ex:i;r ^ noted
no v'lviTY :3
fui the
ACCLF.ACV Or S/jO? DIMEftSiOAS
<^
As5_T?
ST0408240
ST0408241
FOSTER WHEELER LIMITED
FIRED HEATER DIVISION
TECHNICAL NOTES FOR SHELL AND TUBE HEAT EXCHANGERS
TS REQ HEDD-67095 rage2 of 12 REVISION I DATE May 1977
SHELL AND TUBE EXCHANGER DESIGNS
1. 0
SCOPE
1. I Tha design 'package' issued with this specification gives a full mechanical design in accordance with the relevant codes, specifications and standard drawings. This document is intended to specify general requirements applicable to all Foster Wheeler designs.
1.2
In cases of conflict between this TS Requisition, client specifications or the FW design 'package', the most stringent course of action should be followed.
1. 3
Cases of inconsistency between design requirements shall be brought to the attention of Purchaser for olarificatioo.
2. 0
SPECIFICATIONS
2. 1 The Vendor shall ensure that he complies with all the require ments of the codes, specifications and drawings listed on the Foster Wheeler design. Normally information contained in the client's standards will not be repeated on the Foster Wheeler design or specifications.
2. 2
The Vendor's quotation should confirm that all standards, etc. have been reviewed and any exceptions/substitutions muse be listed.
3. 0
MATERIALS
3. 1 The Vendor shall submit all proposed material substitutes for Foster Wheeler approval. A copy of sheet 2 of Foster Wheeler designs amended to show the proposed substitutes should be forwarded in all cases. Material A515 is not acceptance under any circumstances.
All material substitutes should be stated with quotations and must be equal to, or better than, the material required. This applies to pressure and non-pressure parts.
3. 2
Reductions in thickness will not normally be allowed for materials with higher strengths.
4
4 Ji
ST0408241
FOSTER WHEELER LIMITED
TS REQ HEDD-67095
FIRED TECHNICAL NOTES FOR SHELL HEATEB AND TUBE HEAT EXCHANGERS DIVISION
paoe 3 of 12
REVISION 1
BATE Hay 1977
I
znzsonou -
3. 0
MA TERIALS (Continued)
3. 3
Where material specifications allow alternative heat treatments,
|
Vendor shall specify appropriate heat treatment to achieve required mechanical properties.
4. 0
THICKNESSES
! i i. j [
-!
4. 1
All thicknesses specified are minimum as built; TEMA machining tolerances may be applied.
i
r
4. 2
Dished heads to be spun or pressed from blanks of sufficient thickness to obtain at least the minimum thickness shown in the design.
4. 3
All dimensions include cladding or corrosion allowances as specified.
4. 4
Any-increase in thickness shall be submitted for approval. Con sideration must be given to impact requirements which may depend on thickness. If the barrel thickness is increased, a taper shall be provided at the flange junction to maintain the flange shape as specified on the design.
5. 0
WELD DETAILS
5. 1 Weld details shown on the design are schematic only. All welds are to comply with the code, specifications and local requirements
(' as applicable.
f-
6. 0 GASKETS
6. 1 6. 2
Gaskets shall have the following maximum brinell hardness:-
Solid soft iron Solid steel Solid monel Solid low alloy up to5 Cr Solid 13 Cr Solid or jacketed 18/8
90 120 110 135 135 160
Metal clad gaskets must be double jacketed.
I ii 1
ST0408242
ST 0408243
FOSTER WHEELER LIMITED
FIRED
TECHNICAL NOTES FOR SHELL
HEATER AND TUBE HEAT EXCHANGERS
DIVISION
TS REQ. HEDD-67095
mqe 4 of ' 12
REVtSIOM
1
DATE
May 1977
6. 0
GASKETS (Continued)
6. 3
When spiral wound gaskets are. specified the design will be based
on Flexitallic Bulletin 171. Gasket manufacturers will demonstrate
to Purchaser's
satisfaction their ability to manufacture
in accordance with the Flexitallic criteria. Details of the flange
design will be required by gasket manufacturers. The Vendor
shall submit a bolting-up procedure for approval including the
measurement of at least eight studs to ensure correct pretention.
6.4
Flange gasket faces shall have the following surface finish:-
Asbestos gaskets Spiral wound gaskets Metal clad or solid metal gaskets
125 to 250 RMS 1 25 RMS
63 to 125 RMS
6. 5
Stacked units shall be supplied with gaskets and bolting for interconnecting nozzles. Vendor will be advised in writing of type of gaskets required,
6. 6 Vendor to supply two spare sets of gaskets for all joints, including girth flanges, interconnecting nozzle flanges and blind flanges for instrument connections etc.
7. 0
NOZZLES
7. 1 Nozzle flange dimensions to conform to ASA B16. 5 for sizes 24" NB. and below. Larger sizes to be to MSS SP44 for large diameter carbon steel flanges.
7. 2 7. 3
Forged slip-on flanges may be used for fabricated nozzles, except above 300 pound standard rating or fOOC design temperature, unless shown otherwise.
Flanged supplementary nozzles to be provided with gaskets, bolting and blind flanges. Couplings to have bar stock plugs at least 75 mm long.
7.4
Pressure and temperature connections to be initially located transverse to exchanger longitudinal centre line. Vendor will be advised in writing, or on marked-up fabrication drawing, if different orientations are required. All temperature connections to be fitted at an angle of 1 5 up from the horizontal, unless specified otherwise on marked-up fabrication drawing.
7. 5 Nozzle reinforcing pads to be provided with at least one y API threaded tell-tale hole which shall be plugged with a plastic plug.
FWL UUn
ST0408243
ST 0 408244
FOSTER WHEELER LIMITED
TECHNICAL NOTES FOR SHELL FIRED
AND TUBE HEAT EXCHANGERS HEATER DIVISION
TS REQ. HEDD-6709. PAGE 5 of. 12
REVISION 1
date Hay 1977
7.0
NOZZLES (Continued)
7. 6
Where specified on the Foster Wheeler design all shell inlet nozzles to be fitted with impingement plates approximately 25 mm greater than nozzle opening all round.
8. 0
TUBES AND TUBESHEETS
8. 1 When expanded tube/tubesheet joints are specified, the Vendor is to ensure that they are satisfactory for the test pressure and design conditions. Consideration to be given to full thickness rolling if necessary. Tubesheet holes to be machined with at least two grooves, each approximately 3 mm wide and 0. 4 mm deep. For clad tubesheets one groove shall be in the cladding and the cladding shall extend 3 mm beyond the groove.
8. 2
Tubes shall extend 3 mm beyond the face of the tubesheet except on vertical exchangers when they will be flush with the face of the top tubesheet.
8. 3
Strength welded tube to tubesheetJoints shall be in accordance with Fluor specification SP 50780B/507903-90. 3.
8.4
Tapped holes for pulling eyes to be provided in stationary tubesheet for all removable bundles per TEMA. Details to Buit refinery bundle pulling gear where applicable. Plugs to be fitted for protection.
9.0
FLOATING HEADS AND CHANNELS
9. 1
Floating head dish-to-flange weld shall be spot or full radio graphed as specified. If radiography does not give satisfactory results, Vendor may offer ultrasonic examination as an alternative.
9. 2
Pass partition plates to be provided with 6 mm diameter hole for drainage and edges may be tapered back to 10 mm where necessary to fit 13 mm wide grooves.
ST0408244
ST0408245
FOSTER WHEELER LIMITED
FIRED HEATEB DIVISION
TECHNICAL NOTES FOR SHELL AND TUBE HEAT EXCHANGERS
TS REQ. HEDD-67095
PAGE 6 of 12
REVISION
1
DATE
May 1977
10. 0 TUBE BUNDLE
10. 1
If the tube layout drawing is not supplied at the enquiry stage, the Vendor shall give a price per lb. or leg. for sealing strips. Sealing strips may vary between 13 mm and 250 mm in width and will normally be 6 mm thick. On 'U' tube exchangers Vendor to give price per lb. or kg. for dummy tubes to seal gap between innermost tube bends.
10. 2
All "S" and "T" type exchangers to be provided with a support plate at the floating head end of the tube bundle as required by TEMA. The centre of the support plate to be cut out and/or segments cut off at the periphery to minimise the dead area of shell at the floating end.
10.3
Bundle runners are required where the shell diameter exceeds 610 mm. On smaller diameters the Vendor may use his direction.
10.4
Kettle type reboilers, etc. shall be provided with guide rails or tracks and a "hold" angle or bar above the floating head (or full diameter support plate on 'U' tube bundles) to keep bundle in place during shipment and handling.
10. 6
'U' tube exchangers to have support plate close to tangent line of tubes if necessary to keep maximum unsupported tube length within TEMA limits. Support plates to be cut to allow flow over 1 Ur bends.
1 0. 7
Baffles to be notched for drainage unless prohibited in client's specification.
11.0 PROVISIONS FOR MAINTENANCE
11.1
Lifting lugs to be provided at C <f G fee all charnels, flat covers, shell covers and floating head covers. On lower exchangers of stacked units two lifting lugs at approximately 45 should be provided on each part. For vertical exchangers provision shall be made for handling in the vertical position.
11.2
On vertical "single pass" floating head exchangers, the Vendor is to recommend to Foster Wheeler the required attachments for assembly and dismantling in the vertical position.
:
i
ST0408245
ST0408246
FOSTER m FIRED
WHEELER
HEATER
TECHNICAL NOTES FOR SHELL AND TUBE HEAT EXCHANGERS
TS REQ. HEDD-67095
RAGE 7 o 12
REVISION 1
I LIMITED
DIVISION
DATE May 1977
II. 0 PROVISIONS FOR MAINTENANCE (Continued)
11.3
Vertical exchangers installed in "channel down" position shall have 4 collar boltB minimum for retaining the bundle in the shell when the channel is removed.
11.4
All "single pass" floating head exchangers, fitted with bellows shall be provided with restraining bars to protect the bellows assembly during handling. Normally these will also protect bellows during hydrotest. Details of bellows to be submitted for Foster Wheeler approval.
Ii ;
j i
j L i
11.5 All bellows units to be protected by external shroud.
( 11.6 Jack screws to be provided at the shell cover, channel cover
and pull-through floating head cover joints for dismantling.
12. 0 BOLTING
12.1
All bolting shall, before assembly, have bolt threads and nut contact surfaces coated with lubricant FEL PRO C-5A. For temperatures above 427 C the lubricant shall be suitable for high temperature service.
12.2
If hydraulic bolt tensioners are specified, the Vendor is to submit bolt-up procedure for approval.
13. 0 STACKED EXCHANGERS
13.1
Where two or more exchangers having interconnecting nozzles are to be stacked, they shall be checked in the shop for nozzle match. In no case shall the gasket faces of the flanges be out of parallel by more than 0. 8 mm. Interconnecting nozzle flanges to be bolted together with gaskets before final welding.
14. 0 NAMEPLATE AND WARNING PLATE
14. 1
The nameplate shall include all details required by the code, TEMA, local regulations, and DOW specification E92-651. Included in the nameplate shall be the words - main contractor Fluor (Great Britain) Limited together with the Fluor Logo.
T i
ii
ST0408246
ST0408241
' FOSTER
WHEELER 11
LIMITED
FIRED HEATER DIVISION
TECHNICAL NOTES FOR SHELI TS REQ. HEDD-67095 AND TUBE HEAT EXCHANGERS PAOe 8 of 12
REVISION
1
DATE May
1977
14. 0 NAMEPLATE AND WARNING PLATE (Continued)
14. 2
The following wording "Designed by Foster Wheeler Limited of Reading, England" and the "FW" monogram shall be included on the nameplate.
14. 3
Warning plates are required for differential pressure or temp erature designs, low temperature operations, hydrogen service expansion bellows limitations or assembly procedures and any other special cases.
15.0 TESTING
15. 1
All heat exchangers shall be hydrostatically tested and certified by the Vendor and witnessed by a Purchaser's inspector in accordance with the provisions of the ASME Unfired Pressure Vessel Code. Section VUI (latest revision). Sufficient number of tests shall be carried out to test fully
(a) Shell side (b) Tube side (c) Both tubesheets for leakage
15.2
The fabricator shall satisfy himself and Foster Wheeler that the temperature of the water used during hydrostatic test it sufficiently hyjh to avoid the risk of brittle fracture. A temp erature of 21 C may generally be regarded as satisfactory without impact testing of the material.
15. 3
It is preferred that the following procedures be observed when carrying out hydrostatic tests. Where Vendors wish to adopt alternative procedures they should submit their proposals to Foster Wheeler Limited for approval.
15.3.1 U-TUBE EXCHANGERS
15. 3. 1. 1 Tubeside pressure greater than shellside.
(a) Test channel and bundle outside shell to full tubeside test pressure.
(b) Assemble complete exchanger with new contract gaskets. Test shellside and tube-
side, not simultaneously.
15. 3. 1.2
Shellside pressure greater than tubeside, with Type 'A' Channel.
ST0408247
viFOSTER
WHEELER LIMITED
TECHNICAL NOTES FOR SHELL
FIRED
AND TUBE HEAT EXCHANGERS
HEATER
DIVISION
TS REQ. HEDD-67095 pace 9 of 12
REVISION 1
DATE May I.977
ST0408248
15.0 TESTING (Continued)
15.3.1 (continued)
(a) Assemble bundle in shell with channel fitted and contract gaskets either side of tubesheet. Channel cover removed. Test to sheUside test pressure.
(b) Test fully assembled exchanger as in 15. 3. 1. 1(b)above.
15. 3. 1.3
Shellside pressure greater than tubeside, with Type 'Br Channel.
(a) Fit bundle in shell with channel removed and test ring in place. Test shell to shellside test pressure.
(b) Test fully assembled exchanger as in 15. 3. 1.1(b) above.
15.3.2 FLOATING HEAD EXCHANGERS
Although bundles are finally tested outside the shell where tubeside pressure is greater than shellside, it may be necessary during manufacture to insert the bundle and test with shellside pressure in order to locate any leaks at either fixed or floating tubesheet. This necessitates the use of a test ring at the floating end for this type of exchanger. The proposed testing procedure for exchangers with pull through type floating heads shall be subject to agreement with Foster Wheeler.
15. 3. 2. 1 Tubeside pressure greater than shellside.
(a) Test channel and bundle outside shell to full tubeside test pressure.
(b) Test fully assembled exchanger as in 15. 3. 1. 1(b) above.
15. 3. 2. 2
Shellside pressure greater than tubeside but no removable cover at floating end of shell. Test as 15. 3. 2. 1 (a) and (b).
15. 3. 2. 3
Shellside pressure greater than tubeside with Type 'A' Channel.
ST0408248
FOSTER WHEELER LIMITED
FIRED HEATER DIVISION
TECHNICAL NOTES FOR SHELL AND TUBE HEAT EXCHANGERS
TS REQ. HEDD-67095 pace 1 O' of 12
REVISION 1
DATE
May 1977
15.0 TESTING (Continued)
ST04082U9
15.3. 2 FLOATING HEAD EXCHANGERS (continued)
(a) Fit bundle in shell with channel fitted and contract gaskets either side of tubesheet. Floating head cover, shell cover and channel cover removed. Test ring to be fitted on floating end. Test to shellside test pressure.
(b) Fit channel cover and floating end cover. Test tubeside to full tubeside test pressure.
(c) Fit shell cover and test fully assembled exchangers as in 15.3.1.1 (b).
1 5. 3. 2. 4
Shellside pressure greater than tubeside with Type rB' Channel.
(a) Fit bundle in shell with floating head cover, shell cover and channel removed. Test ring3 to be fitted on floating end and at fixed tubesheet. Test to shellside pressure.
(b) Fit channel and floating head cover, shell cover and channel removed. Test rings to be fitted on floating end and at fixed tubesheet. Test to shellside pressure.
(b) Fit channel and floating end cover, test tubeside to full tubeside test pressure.
(c) Fit shell cover and test fully assembled exchanger as in 15.3.1.1 (b).
15.3.3
STACKED UNITS
15. 3. 3. 1
On completion of initial shell and tubeside hydro static tests the units shall be fully assembled and stacked in the shop with contract type gaskets fitted in all joints, for the final hydrostatic test.
15. 3. 3. 2
For mating joint and saddle faces a higher standard of alignment is necessary than that allowed by TEMA tolerances. During the stacking of units in the shop, it must be demonstrated to the inspecting authority that none of the bolting at these locations will be subject to undue stresses because of any 3uch misalignment.
fw. .4ai
ST0408249
ST0408250
*. FOSTER WHEELER LIMITED
FIRED HEATEB DIVISION
TECHNICAL NOTES FOR SHELL AND TUBE HEAT EXCHANGERS
TS REQ. HEDD-67095 ,,GE u Qf \z
. Revision 1
date May 1977
15. 0 TESTING (Continued)
15.3.3 STACKED UNITS (continued)
15.3.3.3
The shop-stacking requirements and testing procedure for multiple stacked or close-coupled units must be approved by Foster Wheeler.
16. 0 PREPARATION FOR SHIPMENT
16.1 For stacked units, shims are to be supplied in consolidated thickness and are to be tack welded and match mark stamped
/ in case they are displaced during transit. Thickness of shim is to be stamped on each support.
16. 2
After completion of fabrication, the heat exchanger shall be thoroughly cleaned. Loose mill scale, spatter and debris 3hall be removed. Exposed machined surface shall be coated with an easily removable rust preventive. Flanged openings shall be protected.
16.3
Shop surface preparation and painting shall be carried out as required by DOW Standard as specified.
17. 0 DRAWINGS
17. 1
The Vendor shall provide fully detailed drawings of the actual construction of the heat exchanger.
17.2
The Vendor's drawings must be checked and signed before sub mission and must include:-
Fluor (Great Britain) Ltd. contract number Foster Wheeler Limited design number Item number Plant name and location List of all applicable codes and DOW, Fluor (Great Britain) Ltd. ,
F. W. Ltd. specifications. The statement "Designed by Foster Wheeler Limited" Details of, or reference to, welding procedures
17.3 A separate drawing must be supplied showing gasket details.
ST0408250
FOSTER WHEELER LIMITED
FIRED ' HEATER DIVISION
TECHNICAL NOTES FOR SHELL AND TUBE HEAT EXCHANGERS
TS RED. HEDD-67095 M0.12 of ,12 .
REVISION <
date May 1977
18. 0 MANUFACTURER'S REPORTS (Retained by Fabricator for 10 years)
Heat exchanger manufacturer's reports shall include:(1) Form U-l of ASME Code Section VHI
* (2)A
Weld Procedure Specification - to be submitted- on the FW form, see Appendix A.
(3) Welder Performance Qualification - Form QW-484- of the ASME Code Section IX
s (4) Details of the chemical and mechanical properties of all pressure containing parts with a key to those parts.
(5) Stress relieving charts where necessary.
(6) Pressure test charts where available.
(7) Outline drawing showing the location and reference numbers of radiographs.
(8) Rubbing of heat exchanger stamping
* (2)B NOTE
Procedure qualification records on P.Q.R. forms similar to ASME QW 483 preferred,
All weld procedures need qualification.
ST040825 f
ST0408251
ST0408252
WELDING PROCEDURE DATA 1TO BE COMPLETED BY FABRICATOR ON F. W. DESIGNED EXCHANGERS)
APPENDIX A
1 JOINT DESIGN
Show here a sketch of joint used to qualify this procedure. Shop drawing must show actual detailed design.
CONTINUATION SHEET
2 PROCEDURE DETAILS Show here a sketch or sketches giving number and disposition of weld beads
3 Welding position:.................... (1G,2G, 3G, 4G, 5G or 6G>
If necessary a separate sketch should be given for each weld position
4
BEAO NO.
ELECTRODE SIZE
AMPS
VOLTS
5
6
7
RATE OF TRAVEL mm PER SEG {NOTE
GAS SHIELD FLOW RATE
(NOTE 2)
GAS PURGE FLOW RATE
lNOTE 3)
9
10
NOTES 11 (1) Rate of trawl mandatory for automatic weics. Also for M.M.A. and M.l.G. ferritic weld? subject to preheat. 12 12> Gas shield flow rate required for all gas shielded processes. 13 (3) Gat purs* rate required for all single-sided butt joints welded by T I.G. or M.l.G. using inert gas.
SHSET 2 of 2
Rev ................ .....
FWL 2103/61
ST0408252
ST0408253
(wPS?.
WELDING PROCEDURE DATA (TO BE COMPLETED BY FABRICTOR ON F. W. DESIGNED EXCHANGERS )
Vendor:........................................................................................... Vendors Ref. No..
Vendors Procedure No..................................................................... Welding Process...
Materials Wekled ............................................................................................... (STATE: MATERIAL SPEC., P HTJMBER, THICKNESS RANGE)
APPENDIX A
WELDING PROCESS
FILLER
MANUAL METALLIC ,
ARC
ELECTRODE
SUBMERGED ARC
WIRE FLUX
T.I.G.
OR M.I ,G.
WIRE
GAS SHIELD (COMPOSITION)
GIVE FOLLOWING DATA
Method of preparing welding edge: .
CONSUMABLE TRADE NAME
MAKER
AWS/BSI CLASS
A.C./D.C. POLARITY
+-
Method of fit-up (e.g. tacks, brackets, clamps etc):
State welding procedure No. ).
and praheet for fii*up welds: I
1.
Preheat temperature: .............................
Interpaw temperature
Method of apply ing preheat/ I
PWHT/interpesa temperature: )
)-
Describe control of cooling I
after welding:
I
Describe treatment between
)-
cooling end eny PWHT (Note 1) I
Portweld treatment temperatura:
Oescribe treatment of I....................... reverse side of weld: . I
(Giving method ...................
Describe treatment of
).
electrodes, i.e. storage and baking: )
Describe type and size of
).
tungsten electrode when applicable: I
Any other details:
Note 1: Describe any temporary postweld heat treatment or prolongation of interpan temperature.
SHEET 1 o` 2
Rev..................--
FWL 2103/60
ST0408253