Document v1ark9woBoyr9JwZmeRgM68pq
PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING October 16, 1984
Present were:
E. P. Bailey G. W. Bostick K. Finney for G. L. Wofford R. L. Hammond B. C. Lancaster G. Orum for R. A. Forsthoffer
S. G. Pappas M. A. Riddle for R. T. Hammann G. T. Ryan J. G. Trafton W. Triplett for D. W. Metten G. L. Tromblee
I. REVIEW OF STATISTICS - M. A. Riddle A. Texas City Plant Safety Performance Summary - September
(A) INJURIES WITHOUT LOST WORKDAYS (medical treatment only)
(B) LOST WORKDAYS CASES RESTRICTED ACTIVITY DAYS AWAY FROM WORK CASES
(C) FATALITIES
TOTAL RECORDABLE CASES
1983 SEPT YTD
28
00
88
00
28
1984 SEPT YTD
00
00
80 0 00
02
1984 TARGETS
7 1 "" -- 8
INJURY RATES PER 200,000 MANHOURS
1983
1984
SEPT YTD SEPT YTD
1984 TARGETS
1984 MFIC
AUG TARGET YTD
TOTAL INJURY-TIR TOTAL RECORDABLE-TRR TOTAL LOST WORKDAY-TLWR DAYS-AWAY-FROM-WORK-DAWR
12.95 11.95 0.00 0.73 0.00 0.00 0.00 0.00
13.19 0.00 0.00 0.00
9.15 0.19 0.00 0.00
__
0.67 0.08
--
0.95
--
--
0.95 0.30 0.25
B. Comments on Statistics - M. A. Riddle
There were no recordable injuries in September and the total injuries year to date are the lowest ever for the Texas City plant.
SC 13782
STG 2430588
LAM015531
PMSB Meeting Minutes - October 16, 1984
f
Page 2
The number of fire and spill alarms was also discussed. Following is a table showing plant-wide fire and spill alarms from 1980 to 1984 year to date:
1980
1981
1982
1983
1984* (thru Oct. 15)
Fires SpilIs False Alarms
9 8 _8
906
9 15
7
10 _6 _2
9 9 _1
Total Alarms 25 28 21 15
19
Spills in 1984 include overturned rig at Dept. 44 reformer and car crash into Gulf ethylene metering station.
Areas having a high or increasing cumulative monthly injury rate are:
Dept. 53 Pumper/Gaugers
Areas showing good or improving injury rates are:
Dept. 48/56 Boilermakers Machinists
Areas having excellent safety records are:
Power 2 Dept. 33 Instrument Electricians Analysts Dept. 50 Dept. 44/45/46 Stores Painters Insulators Dept. 513
5 months without an injury 5 months without an injury 5 months without an injury 6 months without an injury 6 months without an injury 7 months without an injury 7 months without an injury 8 months without an injury 10 months without an injury 14 months without an injury 25 months without an injury
II. NON-MONSANTO SAFETY - B. C. Lancaster
A. Contractor Safety
There were four injuries in the maintenance contractors supple mental force and only one minor injury in the capital projects contractor work force in September.
There were no recordable injuries.
SC 13783
STG 2430589
LAM015532
PMSB Meeting Minutes - October 16, 1984
f Page 3
B. CEP Safety
There was one minor injury in September - no recordables.
C. Crane Incidents
Three recent major crane incidents in our plant were discussed.
(1) Dept. 51 - 8/2/84. Cherry picker overturned while attempting to move a motor from pump location at CT9. See incident investigation No. C84-5.
(2) Dept. 44 - 10/13/84. Tower crane incident. Incident investi gation is underway.
(3) Dept. 50 - 10/16/84. Crane boom struck ladder and platform on heavy ends" 50D203 column.
III. REPORT OF THE SAFETY ADVISORY COMMITTEE (SAC) - G. T. Ryan
A. Rattling of Exchangers
Plant policy published by SHAC.
B. Backflow Preventers
All manufacturing units were surveyed to see whether or not backflow preventers should be installed on plant air. The only units where it was indicated there is a need for backflow preventers were Methanol, PA and Oxo-Esters. The survey indicated there was no need for other units to comply.
IV. REPORT OF THE PLANT SAFETY AND HOUSEKEEPING ACTION COMMITTEE (SHAC) -
E. P. Bailey------------------------------------
---------------------------------------------- ---------
A. EPP Drill - Steve Moncla
Recommended November 15 and will involve many of the plant's safety organizations. The scenario will be a spill at the cryogenic ammonia tank. We will involve one outside group at Danforth. It will be necessary to notify the media.
B. Annual Safety and Housekeeping Inspection
Conducted September 19-21, 1984. Feedback session in cafeteria was well accepted with good positive remarks from the inspection team. A critique was held and documented for next year's committee.
C. Eyebath Freeze Protection - Thurman Payne
The new plant procedure is being circulated for review.
sc 13784
STG 2430590 LAM015533
(
PMSB Meeting Minutes - October 16, 1984
Page 4
D. Contractor Safety
The AN-5 shutdown critique was used to improve the overall approach to the Methanol-Acetic Acid shutdown. An attempt is being made to improve the five-minute safety meetings at the start of each shift.
Contractor Videotape for Visitors, Truck Drivers, etc.: The script is in progress.
E. Hourly Safety Committee
There was one item of old business which involves traffic signs in the plant. There are a few Stop signs in the plant that have the wording "Stop for Pedestrians" on the Stop sign. It was recommended that we should use only a standard Stop sign where we want vehicles to stop and a Yield sign where we want vehicles to yield.
V. REVIEW OF INCIDENTS
Monsanto Incidents:
Date 8/8/84
Incident No.
84-7 (issued)
Description
Pipefitter received laceration to cheek (5 stitches) while loosening bolts on a flange with impact wrench. (Richards)
Contractor Incidents:
Date
Incident No.
Description
8/23/84
C84-06 (issued)
Explosion and fire in south breaker room of AN-5 when 4160 volt motor starter faulted during initial startup of new motor. (Noel)
VI. MISCELLANEOUS - M. A. Riddle
A. STOP Program
1. Hourly
Unit I - 90% complete. Unit II - 75% complete. Unit III planned between the "Methanol and Styrene shutdowns".
2. Non-Exempt
The program is underway. Units I and II are complete and Unit III will be conducted during the weeks of October 29, November 5, and November 12.
SC 13785
ST6 2430591
LAM015534
PMSB Meeting Minutes - October 16, 1984
Page 5
3. Exempt
A program for all the exempt people that have not had the STOP training is planned to begin in November.
4. Orientation of New Employees
Gene expressed need for all new employees to be given an indepth safety orientation within their first few days of employment. LP&S is currently giving orientation.
B. Quarterly Safety and Housekeeping Inspection
SHAC was asked to consider the two following concerns:
1. The department would like an immediate feedback of any type of problem areas at the conclusion of the inspection. In one case, there was very little said by the inspection team and then a long list of items came out in the report.
2. The need for continuity was discussed and it was felt that at least one person of the team should be rotated forward. This would aid in the evaluation of how a department had improved and responded to the previous inspections report.
VII. PLANT MANAGER'S COMMENTS - G. L. Tromblee
Gene indicated that we have an excellent momentum going in the area of safety and that we need to keep this going through the Methanol/Acetic and upcoming Styrene shutdowns.
/dgb
M. A. Riddle
SC 13786
STG 2430592
LAM015535
PLANT MANAGER'S SAFETY BOARD
E. P. Bailey
2Z
G. W. Bostick
0-8
R. A. Forsthoffer 0-5
R. T. Hammann
0-22
R. L. Hammond
0-12
J. S. Hagood
0-7
B. C. Lancaster D. W. Metten S. G. Pappas G. T. Ryan
CED OA-19 0-10A 0-5
G. E. Small J. G. Trafton G. L. Tromblee G. L. Wofford
OA-12 0-6 0-10 OA-7
R. F. Arnold Ron Attra E. W. Bell R. B. Bradley D. N. Campbell J. V. Cavender C. M. Cruse M. T. Devore E. R. Dupuis P. W. Evans E. G. Fiesinger 0. L. Hamilton C. M. Hancock W. M. Haynes J. H. Jackson R. S. Jackson
SMD OA-15 OA-19 OA-9 2R-9 2R-7A
PER 51D OA-13 OA-11 51D FD 0-21 OA-13 2Z 0-13
B. L. Johnson D. D. Kos H. M. Lacy L. C. McCune G. T. McVay K. K. Okamoto V. P. Osburn D. Pease W. R. Rolingson J. A. Stal John Townsend W. H. Triplett Leroy Vornkahl
44D OA-9 0-6 OA-1 ED OA-11 SS-14 AB-3 1R-16 OA-11 50D 51D 35PD
NOTE: Notify Dorothy Bibby (3069) of any changes to the above mail codes.
SC 13787
STG 2430593
LAM015536