R. W. Peterson General Offices
May 28, 1968
cc:
CEA 1430 - EXPAND AROCLOR AT ANNISTON REVISED BIPHENYL TEMPERATURE CONTROL SCHEME
RWP to WFT, 5/23/68, Same Subject
W. F. Taffee Anniston
`
R. G. Corley
B. D. Das
L. L. Faulkner- Anniston
R. A. Haydel - Anniston
R. C. Herman/R. H. Henning
W. H. Howa rd
R. M. Kountz
V. T. Langdon - Anniston
P. K. Ward
- Anniston
H. L. Williams - Anniston
Van Langdon has called to my attention ghat the biphenyl is available from storage day tanks at 100 C, not 85 C as in my memo. Thus, we may as well plan on transferring batches to the flaker feed tank at 100C with 3-5 PSIG steam on the
jacket. (This control would be bypassed for 100 PSIG steam to transfer Santowax.)
In reviewing the desired biphenyl flaking temperature, I find that the Goslin Birmingham tests were run from 190-210UF and all successful. The 85C (185F) came from Department 221
WGK biphenyl flaking. Thus, the desired temperature is a balance of safety factor ig freeze-ups versus safe handling below the flash pgint. 50 F below the 123C open cup flash
point would be 95 C.
My plan is to transfer batches0in the evening, and with heat
losses, we should be at 90-95 C by morning for flaking. If
necessary, we can later add water to the plate coil intended
for steam heating Santowax batches. A 35 ft^ plate coil will
give 10C cooling to a 3,600 gallon batch in around three
hours.
`
We agree with Van's request to provide a level actuated cut off valve for safety against overfilling.
Design will proceed on this basis.
R. W. Peterson Project Manager is