Document v1Or9kVJ1Ee74NKNOjm0XxL5q

UNION CARBIDE P091 120 517 CERTIFIED MAIL RETORT RECEIPT REQUESTED CORPORATION P.0- BOX 1 SO, SlSTERSVIULE, WEST VIRGINIA 2G1 "75 Address of Owner - P. O. Box 180, Sistersville, W.V. 26175 (2) Description of facility Identification - Water tank for No. 1 Boiler Size - 13 feet diameter x 50 feet "high Age - Approximate ly 35 years Prior Use - Water storage (3) Estimate of amount of friable asbestos material Linear feet of pipe - Surface area (for other components) - 280 sq. meters (3000 sq feet) (4) Location of facility - Energy Systems, above address (5) Scheduled starting date - October, 4, 1986 Scheduled completion date - October 10, 1986 (6) , (7) Nature of planned work and method employed - Demolition or renovation: Renovation Deteriorated asbestos containing insulation will be wetted, in accordance with 40 CFR 61.147, and removed. It will then be replaced with non-asbestos containing insulation. It will then be disposed of, in accordance with 40 CFR 61.152. UCC 022442 (8) Name and location of waste disposal site - Same as above. I hope this provides the information required. If you have any questions, please call me at (304) 652-3211, Extension 512. AJVislc cc: D. L. Archer F. E. Dailey ^ R. L. Foster E. D. Southard W. V. Summers Sincerely, Staff Environmental Engineer UCC 022443