Document rxqgMyjdOVBVDBXGvYEMzz1KV

(\ OLO' o o c D CONFIDENTIAL DOW CHEMICAL U.S.A T-NiTSCp *1 1 CCA J. Y. PENNINGTON REACTIVE CHEMICALS COMMITTEE BRINE PRODUCTION DEPT RT. 1, BOX 200-A BELLE ROSE. LOUISIANA 70341 604 369-6990. 6639 B04 369-7111 CC. TOM AUSTIN JIM LANDRY NORMAN MAD ILE RONNIE MILLS RESPONSE TO THE REACTIVE CHEMICALS REVIEW OF JULY 10,. 1956 1 DRILLING 0? NEW P.PINE WELL ND. 1C -I --` r*j*TT*-*_v T* JT. i '7 CAL CONCERNS UPGRADE" AND CONVERSION Or WELL (ETHV_ENE . CONIERNS: DETERMINE OPTIMUM CONFIGURATION OR TEMPERATURE SENSOR- EBV AND DECOMP SUPPRESSOR IN THE ETHYLENE i-INE TO THE WELL. RESPONSE: THE SAL.T MINING,'STORAGE TECHNOLOGY CENTER RECOMMENDS THAT THE EBV EE PLACED ON THE WELLHEAD IMMEDIATELY AFTER THE WING VALVE WITH NO CONNECTIONS Tv BETWEEN. th: PLANNED. THE SALT MINING/37ORAGE TECHNOLOGY CENTER RECOMMENDS THAT THE DECOMPOSITION SUPPRESSOR BE PLACED BETWEEN THE WELL AND ALL ETHYLENE EQUIPMENT SUCH AS METER RUNS, SAMPLE 5VSTEMS, FIG TRAPS, COMPRESSORS, AND ETHYLENE DRYING AND PROCESSING EQUIPMENT. THE PURPOSE IS TO SNUFF OUT A DECOMPOSITION THAT MAY HAVE STARTED AT THIS EQUIPMENT BEFORE IT ENTERS THE WELL. FOR WELL ND S THERE WILL EE NO ETHYLENE EQUIPMENT BETWEEN THE BECOME SUPPRESSOR AND THE WELLHEAD. THE TECH CENTER RECOMMENDS THAT THE TEMPERATURE SENSOR BE LOCATED UPSTREAM OF THE ETHYLENE EBV FARENOUGH TO ALLOW THE EBV SUFFICIENT TIME TO CLOSE. FOR WELL NO. B TWO TEMPERATURE SENSORS ARE PLANNED. ONE WILL BE 175 FEET AWAY AND THE OTHER 1000 FEET AWAY THE TEMPERATURE SENSOR THAT IS 175 FEET AWAY IS ON THE WELL NO. S METER RUN AND IS DESIGNED TO SENSE A DECOMP THAT HAS GOTTEN TO WELL NO. B PAD OR STARTED AT WELL NO. 8 PAD. THE SENSOR 1000 FEET AWAY IS DESIGNED TO SENSE A DECOMF THAT HAS COME DOWN THE LINE FROM PLAQUEMINE OR HAS ORIGINATED IN THE MASTER ETHYLENE METER RUN OR PJG TRAP AREA AT THE PIPELINE ENTRANCE TO BRINE PRODUCTION. AN ETHYLENE DECOMPO SITION MOVES AT A RATE OF 1-2 FEET/SECOND. ASSUME" PIPELINE FLOW Or S FEET/SECOND, IT WILL TAKE 17. * CONFIDENTIAL AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY DO 0059?? SECONDS OR ICO SECONDS FOR THE DECOMPOSITION TC MOVE FROM THE TEMPERATURE SENSORS TO THE WELLHEAD. THE EBV WHICH IS DESIGNED TO CLOSE WITHIN 10 SECONDS WILL STD? A DECOMPOSITION IF THE DECOMPOSITION SUPPRESSOR DOES NOT. THE DECOMPOSITION SUPPRESSOR IS POSITIONED BETWEEN THE TEMPERATURE SENSORS AND THE WELL AT A DISTANCE OF 110 FEET FROM THE WELLHEAD. 3. PROMIX WELL NO. 2 CONVERSION TO BRINE MINING CONCERN: ESTABLISH ADEQUATE OPERATING DISCIPLINE TO ASSURE THAT DOWNSTREAM VALVES AND EBV'S ARE BLOCKED IN PROPER SEQUENCE TO AVOID BLOCKING IN HIGH PRESSURES. RESPONSE: WELLHEAD EBV'S ARE CLOSED ON A HIGH PRESSURE TRIP SET AT 600 PSIG ON THE BRINE AND SAFETY STRINGS THE SAFETY STRING AND BRINE STRING FLOWLINES TO THE WELL ARE 300 LBS. FIFING SYSTEMS WHICH ARE GOOD FOR . 7?0 PSIG AT AMBIENT TEMPERATURE. ' 'THE TRIP AT 600 PSIG PROTECTS THESE 300 LB. FIFING SYSTEMS FROM HIGH WELLHEAD PRESSURES. EEV TRIPS ARE INVESTIGATED IMMEDIATELY, THEREBY NOT ALLOWING THE LINE TO SI AY BLOCKED IN AND TO PRESSURE UP. THE BRINE PRODUCTION AMD HYDROCARBON STORAGE PROCEDURE FOR BLOCKING IN HYDROCARBON LINES, REQUIRES THAT THE BLOCKED IN SECTION MUST BE VENTED OR FLARED TO PREVENT OVERPRESSURE DUE TO HYDRAULIC EXPANSION. CONCERN: REVIEW EBV MANUAL OVERRIDE SYSTEM CONFIGURATION AND PROCEDURES. RESPONSE: PRESENTLY, BRINE PRODUCTION USES REVERSE ACTING FIRE SAFE GATE VALVES WITH AXELSON MANUKATIC ACTUATORS. THESE VALVES ARE FAILSAFE CLOSED VALVES THAT REQUIRE AIR TO OPEN. THE VALVE STEM HAS A MANUAL OVERRIDE HANDWHEEL THAT ALLOWS THE VALVE TO EE OPERATED WHEN THE VALVE IS IN THE AUTOMATIC CLOSED POSITION. LIMIT SWITCHES MONITOR THE POSITION OF THE VALVE ACTUATOR FISTGN. THE FULLY UF OR THE FULLY DOWN POSITIONS ARE THE ONLY ONES RECOGNIZED. IN THE AUTOMATIC OPEN POSITION THE VALVE ACTUATOR PISTON IS DOWN. WHEN THE VALVE ACTUATOR PISTON IS UP THE VALVE IS IN ONE OF THREE POSITIONS, AUTOMATIC CLOSED, MANUAL OPEN OR MANUAL CLOSED. THEREFORE, ANY TIME THE VALVE DOES NOT INDICATE AUTOMATIC OPEN <ACTUATOR PISTON FULLY DOWN), THE VALVE IS NOT READY TO ACT AS AN EEV AND TO CLOSE ON EMERGENCY. THE OPERATING PROCEDURES DETAIL. THESE CONDITIONS, AND WHAT MUST EE DONE TO CHECKOUT AND READY AN EBV. GAIL BRADEN BRINE PRODUCTION AND HYDROCARBON STORAGE MC DO 005933 CONFIDENTIAL DOW CHEMICAL U.S.A. July 14, 1986 Sail Braden Bldg. 2901 -' cc: Hark Mitchell -.3701 Tom Austin 3601 Ray Gaska - 3701 Henry Bell -4701T LOUISIANA division P. O. SOX IS PLAOUSMINE. LOUISIANA 707AS-O1SO BOA 1SB-SOOO 8/25/86 PLEASE SUBMIT RESPONSES FOR CONCERNS #2 & #3. Thanks JYP REACTIVE CHEMICALS REVIEW - BRINE PRODUCTION; THREE CAPITAL PROJECTS A review was held July 10, 1986, with the following project represen tatives present: Sail Braden, Tom Austin, Norman Habile, Jim Landry, and Mark Mitchell. Bob Brady was present representing LAS&TL. Committee members present: Rex Cochran, John Monroe, David Gustafson, Jack Gathers, Gerald Wagener, Mike Nevill, Joan Pennington. 1. Drilling of New Brine Well #18 No reactive chemical concerns. 2. Upgrade and Conversion of Well #8 (Ethylene Storage Well to Brine Mining) Concerns: Determine with Process Engineering optimum configuration of temperature sensor,, EBV and decomp suppressor in the ethylene line to the well. 3. Promix Well #2 Conversion to Brine Mining Concerns: 1) Establish adequate operating discipline to assure that downstream valves and EBVs are blocked in proper sequence to avoid blocking in high pressures, 2) Review EBV manual override system configuration and procedures. Please repond in writing to the Comnlttee Chairman within two weeks as to action taken or planned in regard to these considerations. i a v/t-w Y. Pennington, Cnairmai n REACTIVE CHEMICALS COMMITTEE DO 0059?4 AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY CONFTDFNTTA1 i*r- DOW CHEMICAL U.S.A. fUJ / /2-k July 14, 1986 Gail Braden Bldg. 2901 cc: Mark Mitchell Tom Austin Ray Gaska Henry Bell - 3701 - 3601 - 3701 - 4701T LOUISIANA DIVISI N P. O. SOX ISO PLAQUEMINE. LOUISIANA 707EB-01B0 S04 BBB-8000 JfcAvO 1 OKL*. fit tvXT of 3VL-Nl ^ -- H X UKt writ. REACTIVE CHEMICALS REVIEW - BRINE PRODUCTION; THREE CAPITAL PROJECTS A review was held July 10, 1986, with the following project represen tatives present: Gail Braden, Tom Austin, Norman Mabile, Jim Landry, and Mark Mitchell. Bob Brady was present representing LA5&TL. Committee members present: Rex Cochran, John Monroe, David Gustafson, Jack Gathers, Gerald Wagener, Mike Nevill, Joan Pennington. 1. Drilling of New Brine Well #18 No reactive chemical concerns. 2. Upgrade and Conversion of Well #8 (Ethylene Storage Well to Brine Mining) Concerns: Determine with Process Engineering optimum configuration of temperature sensor, EBV and decomp suppressor in the ethylene line to the well. 3. Promix Well #2 Conversion to Brine Mining Concerns: 1) Establish adequate operating discipline to assure that downstream valves and EBV's are blocked in proper sequence to avoid blocking in high pressure* 2) Review EBV manual override system configuration and procedures. Please repond in writing to the Committee Chairman within two weeks as to action taken or planned in regard to these considerations. A**s*t*v?x-w Y. Pennington, Cnairman REACTIVE CHEMICALS COMMITTEE rcb DO 005925 AN OPERATINO UNIT OF THE DOW CHEMICAL COMPANY CONFIDBNTTAI DOW CHEMICAL U.S.A. July 14. 1986 Gail Braden Bldg. 2901 cc: Mark Mitchell - 3701 Tom Austin - 3601 Ray Gaska - 3701 Henry Bell - 4701T LOUISIANA DIVISION P. O. SOX ISO PLAQUEMINE. LOUISIANA 707SB-01B0 04 SSO-SOOO REACTIVE CHEMICALS REVIEW - BRINE PRODUCTION; THREE CAPITAL PROJECTS A review was held July 10, 1986, with the following project represen tatives present: Gail Braden, Tom Austin, Norman Mabile, Jim Landry, and Mark Mitchell. Bob Brady was present representing LAS&TL. Committee members present: Rex Cochran, John Monroe, David Gustafson, Jack Gathers, Gerald Wagener, Mike Nevill, Joan Pennington. 1. Drilling of New Brine Well #18 No reactive chemical concerns. 2. Upgrade and Conversion of Well #8 (Ethylene Storage Well to Brine Mining) Concerns: Determine with Process Engineering optimum configuration of temperature sensor, EBV and decomp suppressor in the ethylene line to the well. 3. Promix Well #2 Conversion to Brine Mining Concerns: 1) Establish adequate operating discipline to assure that downstream valves and EBV's are blocked in proper sequence to avoid blocking in high pressures 2) Review EBV manual override system configuration and procedures. Please repond in writing to the Committee Chairman within two weeks as to action taken or planned in regard to these considerations. 3. Y. Pennington, Chairman REACTIVE CHEMICALS COMMITTEE rcb AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY DO 005926 CONFIDENTIAL. DOw CHEMICAL U.S.A. July 1, 1986 Henry Bell Rex Cochran Jack Gathers John Henley Jim Shelton Mike Nevill Gerald Wagener Ken Zezulka - 4701T - 4701T 2511 - 2514 - 3301 - 3502E - 2503 - 3801 LOUISIANA DIVISION P. O. BOX ISO PLAQUIMINE. LOUISIANA 7O7SS<O1S0 BOA 3BS-S00 REACTIVE CHEMICALS COMMITEE REVIEW - BRINE PRODUCTION There will be a review meeting Thursday, July 10, 1986. The meeting will be held in 2510 Building Conference Room at 8:30 a.m. (R&D C-complex; 3rd of 3 R&D buildings facing canal. Enter from front parking lot through double red doors.) Three capital projects for the Brine Production Plant will be reviewed. If you are unable to attend, please arrange for someone to substitute for you, and advise me (6283) or Robbie Bagaley (1805) of your replacement. UJs. Yi *. rPce11n11nington, vCmhqa1ir1mwaonn REACTIVE CHEMICALS COMMITTEE rcb cc: Plant Supt: Tom Austin Plant Repr: Gail Braden Ronnie Mills Jim Landry Norman Mabile Major Mgr: Ray Gaska AS&TL Repr: John Gross/ Bob Brady AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY DO 005927 CONFIDENTIAL \Vo JUNESgT 1986 R. W. GALLANT GENERAL MANAGER APPROVED_________ R. A. GASKA C-A/P&U MANAGER AUTHORIZATION REQUEST - PROMIX NO. 2 WELL CONVERSION TO MINING THIS IS A REQUEST FOR *310 M CAPITAL TO CONVERT PROMIX NO. 2 WELL TO BRINE MINING IN ORDER TO INCREASE BRINE PRODUCTION CAPACITY BY 350 GPM. PROMIX NO. 2 IS AN IDLE HYDROCARBON STORAGE CAVERN WITH A PRESENT CAVERN SIZE OF* 64 MM BBLS. IT HAS RECOVERABLE SALT RESERVES OF 750*000 TONS OF SALT <2.5 MM BBL. CAVITY) BETWEEN 3300 FEET AND 2700 FEET. A BRINE CAPACITY OF 350 GPM CAN BE IMMEDIATELY REALIZED ON START-UP SINCE A 50 FEET DIAMETER CAVERN ALREADY EXISTS. AT 350 GPM THE CAVERN CAN BE MINED FOR TWO (2) YEARS BEFORE DEPLETING THE RESERVES. PROJECT SCOPE THE PROJECT INCLUDES VALVES* PIPING, INSTRUMENTATION AND CONTROLS FOR A MINING WATER LINE* A BRINE LINE AND A PROPANE LINE. THE WELL WILL USE PROPANE AS A HYDROCARBON PAD AND IT WILL BE INSTRU MENTED WITH TRIPS AND EMERGENCY BLOCK VALVES AS IF IT WERE A STORAGE WELL DUE TO THE PROPANE PAD. A WELLHEAD SPOOL WILL BE PURCHASED AND INSTALLED SINCE THE PRESENT WELLHEAD IS INCOMPLETE. BENEFITS AND JUSTIFICATION THE DEMAND FOR BRINE ON THE BRINE PRODUCTION PLANT IS 5720 GPM. THIS DEMAND IS BASED ON THE CHLORINE PLANTS AT CAPACITY <6.4 MM LBS/DAY CHLORINE) AND THE HYDROCARBON STORAGE WELLS <PROMIX AND HYDROCARBONS) BRINE REQUIREMENTS. BRINE PRODUCTION PRESENTLY HAS A CAPACITY OF 4500 GPM. THIS 1220 GPM SHORTFALL BETWEEN BRINE CAPACITY AND DEMAND IS THE JUSTIFICATION FOR THE IMMEDIATE CONVERSION OF PROMIX NO. 2 TO MINING. D 005928 CONF.TDFNTTA! THE BRINE CAPACITY OF BRINE PRODUCTION WAS UNEXPECTEDLY REDUCED BY 400 GPM DURING THE SECOND HALF OF 1985 BY 400 CPM DUE TO A CASING LEAK IN WELL NO. 4 AND A POTASH SEAM IN WELL NO. 16. DOW NO. 12 WITH 425 GPM BRINE CAPACITY IS SCHEDULED TO BE TAKEN OUT OF MINING IN JULY. 1986 AND CONVERTED TO HYDROCARBON STORAGE (LPG BACK-UP). BRINE WELL NO. IS CAPITAL WAS DELAYED FROM 1984 TD 1985. THIS DELAY MEANS THAT WELL NO. 18 WILL NOT BE UP TO ITS 850 GPM BRINE CAPACITY UNTIL SECOND QUARTER 1987 RATHER THAN SECOND QUARTER 1986. WHEN THE CHLORINE PLANTS RUN AT CAPACITY. BRINE PRODUCTION CAPACITY IS EQUAL TO THE CHLORINE CELL DEMAND. THIS LEAVES NO SUPPLEMENTAL BRINE CAPACITY FOR HYDROCARBON STORAGE WELLS. WELL WORK OVERS, BRINE POWER CURTAILMENTS, OR CHLORINE CELL START-UPS. PRESENT BRINE DEMAND IS SUMMARIZED AS FOLLOWS: CHLORINE MANUFACTURE <6.4 MM LBS/DAY) 27% SUPPLEMENTAL DEMAND 4445 GPM BRINE 1275 GPM BRINE TOTAL DEMAND 5720 GPM SUPPLEMENTAL BRINE DEMAND AND CAPACITY ARE AS FOLLOWS: SUPPLEMENTAL DEMAND WELL WORK OVERS (CLIFTON 1 AND CLIFTON 6 CAVERN) HYDROCARBON STORAGE WELLS BRINE MAKE-UP, POWER CURTAILMENT CHLORINE CELL START-UPS 1700 GPM 1500 GPM 750 GPM 750 GPM TOTAL SUPPLEMENTAL DEMAND 4700 GPM SUPPLEMENTAL CAPACITY <27% OF DEMAND) 1275 GPM IT IS FELT THAT A SUPPLEMENTAL CAPACITY OF ONLY 27% OF THE TOTAL SUPPLEMENTAL DEMAND IS NEEDED DUE TO THE SURGE CAPACITY OF THE NORTH AND SOUTH BRINE PONDS. PROMIX NO. 2 CONVERSION TO MINING IS NEEDED AS SOON AS POSSIBLE IN 1986 TO BOOST PRESENT BRINE CAPACITY AND TO ALLOW DOW NO. 12 TO BE TAKEN OUT OF MINING AND CONVERTED TO STORAGE. DO 005929 C.ONFTDFNTTAl SAFETY AND LOSS PREVENTION AND TECHNOLOGY PROMIX NO. 2 WILL BE SET UP WITH HIGH PRESSURE TRIPS ON ALL THREE STRINGS (BRINE. MINING WATER. AND PROPANE). THE PROPANE STRING WILL ALSO HAVE A LOW PRESSURE TRIP. EACH STRING WILL HAVE A WELLHEAD WING VALVE (MANUAL) AND AN EBV (AUTOMATIC). ALL EBVS WILL CLOSE IF ANY OF THE TRIP SETPOINTS ARE EXCEEDED. PROMIX NO. 2 IS COMMUNICATED WITH GRACE NO. 1. PROPANE WAS CHOSEN AS THE PAD FOR PROMIX NO. 2 SINCE GRACE NO. 1 STORES PROPANE. GRACE NO. 1 HAS BEEN IN PROPANE STORAGE FOR 3-1/2 YEARS. THERE HAS NEVER BEEN A PROBLEM WITH PROPANE MOVING FROM GRACE NO. 1 TO PROMIX NO. 2. PROMIX NO. 2 WILL BE MINED USING THE 3/4 POINT TECHNIQUE AS A SAFETY PRECAUTION. WITH THIS MINING TECHNIQUE THE BRINE WITHDRAWAL POINT WILL BE AT 3300 FEET. DEEPER THAN ANY PART OF GRACE NO. 1 CAVERN. THIS WILL INSURE PROPANE WILL NOT EXIT WITH THE BRINE. AN ELECTRICAL CLASSIFICATION OF CLASS I. DIVISION II WILL BE ESTABLISHED WITHIN 25 FEET OF THE WELLHEAD IN COMPLIANCE WITH SAFETY AND LOSS PREVENTION GUIDELINES. THE WELL WILL HAVE A F&E INDEX OF 90 WITH A MAXIMUM PROBABLE LOSS OF *567 M BASED ON A MAXIMUM PROPANE INVENTORY OF 50,000 BBLS. THIS PROJECT HAS BEEN REVIEWED WITy^HE SAFETY DEPARTMENT. WBACTIV GIIDIICALCT-pejIllirT I LBatKB- THE SALT MINING/STORAGE TECH CENTER. ABfc. GROUPS SUPPORT THIS PROJECT. ENVIRONMENTAL THERE WILL BE NO NEW SOURCES OF HYDROCARBON EMISSIONS TO TM^^ ATMOSPHERE AS A RESULT OF THIS INSTALLATION OTHER THAN Ft&ATIVC EMISSIONS IF EQUIPMENT FAILURE WERE TO RESULT. ALL BRINE THAT LEAVES THE WELL WILL NORMALLY PASS THROUGH THE SOUTHMD STACK AM=saaa308 SYSTEM. THE BRINE CAN ALSO BE ROUTED TO THE NORTH FLARE STACK.H. BOTH OF THESE SYSTEMS HAVE BSft RECENTLY J UPGRADED AND BOTH MEET \&LP GUIDELINES. THE PAD AROUND PROMIX NO. 2 WILL BE DIKED, WITN THE COLLECTED WATER BEING RETURNED TO THE MINING WATER SYSTEM. \THIS PROJECT HAS BEEN NBSMft WITH ENVIRONMENTAL GOH*ROL AND VhEY SUPPORT IT. INDUSTRIAL HYGIENE THERE WILL BE NO NEW CHEMICALS INTRODUCED TO BRINE PRODUCTION AS A RESULT OF THIS OPERATION. THERE WILL BE NO INDUSTRIAL HYGIENE PROBLEMS AS A RESULT OF THIS PROJECT. THIS PROJECT HAS BEEN REVIEWED WITH LOUISIANA DIVISION INDUSTRIAL HYGIENE AND THEY SUPPORT IT. DONFTDFNTT Al DO 005930 PROJECT TEAM AND MANPOWER MANUFACTURING REPRESENTATIVE - GAIL E. BRADEN PROJECT ENGINEER - GERARD J. BECNEL INSTRUMENT ENGINEER - JOHN HOLLIDAY NO ADDITIONAL MANPOWER WILL BE REQUIRED AT BRINE PRODUCTION TO OPERATE/MAINTAIN THIS FACILITY. SPENDING SCHEDULE, ACCOUNTING AND RELATED EXPENSES THIS CAPITAL WILL BE DEPRECIATED AGAINST ACCOUNT 20. THERE WILL BE RELATED EXPENSES OF *50,000 FOR WORK OVER (CAVITY SONAR) OF PROMIX NO. 2 AND *15,000 FOR STORAGE OF PROPANE FROM GRACE NO. 1 IN PROMIX NO. 4 DURING THE WORK OVER TIME. THE COMMUNICATION OF GRACE NO. 1 AND PROMIX NO. 2 REQUIRES THAT GRACE NO. 1 BE EMPTIED AND DEPRESSURIZED IN ORDER TO SONAR PROMIX NO. 2. SPENDING SCHEDULE: R-T-0 DATE: COMPLETION DATE: 3RD QUARTER, 4TH QUARTER, 4TH QUARTER, 4TH QUARTER, 1986 1986 1986 1986 *200 M *110 M GAIL BRADEN MANUFACTURING REPRESENTATIVE MG TIM HOLDER BRINE PRODUCTION SUPERINTENDENT CNFTDFNTTAt DO 005931 &Ru>e visetc w. (.io IX) 1o* * USlCHSAO/^OO * V4tN*6 VAlVCS Iajsx^ ) U *4 IVV . fc40 6*146 *<* *676,6 VAtrtG MAUMt. ass fR^TtCT UATVUAt GAS. nrn urifi } 1 StA*`6S SACT 1 X ST6S ?A*ttinSp ?A6 5) (tU(b 0\l (* PiAo't V46I.OS to*l* V-* AT F*STt NAWC Off S%cST WCCOCfc (g) GAtNS GtS TO SotfTM PlT ok NoATM fVT. GAS SCPAftATO* r fLAAC STACK* Q) fLAAC ?i*TS 04 AU. 3 STRINGS 0 6AS*"*(660\6Nri*i'G PAoGAAm. ) CfrtUiQtc PATCTOf4 PAOGAAOA 00^32 OO fftotM* NO. Z Goku - Commit to imwim & f RESENT - tOLt STORRGE WtLL *3?S<8 ril/liA HJtUtU xrx rti/tiA OOO mvofo _<N *n rtrtf* OtStGN 9ERTVLRES <3> oro fowe pro 41,!;i wing Mrlmcs on ru. U.R- NoGSLES Close cu?iei>. COM's ON RLU 3 plOUtNG STRESS CD no connection* ritwecn WiNG MM-VC RNO EftV. 0 PRESSURE TRtf* RU. 3 WRINGS 1 ! f ftotRNG - tttGV* C LOU WRIER - VMGM gring - V*\GU i1 | i <& LOROU H MR\f* ON RU. 1 STRINGS1 i (5) GKk'Uf CMUNOCft R\R CONFTDFNTTAI DO 005933 0 pRtt. cuooeo COM's OMCRRx'OG.. \AttH tARNUAl *\n. GtG fftor'U'K NO t (3) >Jn.\|C off ncfcoe* sockct VjiGlttO . () feftwte STAvrfG \G GW* SY#\J& - Hot1 -ffttxttfT ?g?*wc fMn gttng 3sa \ilTO <JA\V< r^inf*l 1I (Jo) ?Gn\* 1 tOfAttatJUAltO GlfTM fi dlkCf tit. \ 5ftGO No | STeftCt f*fAN* (2) SGfSVl VTRtNG = (Aii/tNO WWS* SlMrl G (2) &*< O'* G* To G** SSPAAATo* GNo fvMlC STftoK. NoATtt fT A S**T* P'tT ^ Witc GOO 2*LwGG GT GvitO S*Gf GCG * TAMVtS X VTKwtl fG*T T'#*G PGofGNC DO 005934 CONFIDENTIAL Ms. ues GoKU 5ftVnmwc vrt!) \ ho * ufG*m j GftM T*< S'VSYGNV SVY U* foR fWiMNfe p^oo *vgtc.r Huhs fos fuovtff MitfT*t. * o<3o3<o3* yiriiA iAtOl/) _n 1 ; Q) CSV** ON fttb * STRINGS (ft) Villi MAWS ON f^U, U)UMGAO NOtSlSS(J) Sooo*|)oo* S'tSTCm <j3) 9<Uv*< TRANS "UTTC* T*f V*YU| VOCAC SACS-Mif, OH SAC* STRING. a^Ck'Vxf MR (1kiNt(lt SufflY. () GA\W* CUSCO cav's WrtH (AANUM MCaS\SG \CkG^. () OUvnfU^ttfl SoPPRCSSoR wnH TS*RWAYvi T*'** OH TV* CSV*5 C flt&LiWC) S) S|4 fwT foirflNG Y*GTW*0 WT* CT*TU.mG ffttt. D0 00S,35 (J) Wt* TO \AHOCAVf* ArfO $ivt SOvooMFrop f RObt*% - QvfcAuT'f (J) *.** fRoGRANvl CtmSJTVNG MM. G ' J\ OOU H t (0 fAitUtviiJ SUTttA. OOO <WO H r WlftfclMT* 04 W.W . lWCV V\ ?>* r'NOrMToAiU'N Otf *.W . c\ VM.TAA VW\C UMC fetTtcTo^S). ) f*kit Tfc*c!t ttooK-*f on U.W. Cift. 4)to.tt. SffttriKfft *TTetT OCOlOfttO STHHOrffc fifirffc. " OAtWC fifiwO Vtu. ftewvf vivren. o) ncmcr awlv> utu t fiu S>\TA tTWIltrfC t) U<noo 6tM *T 04WSJv*t . Os StfftAAToft ftlSiGwCO FtA HSoLkOL* HT6AAftftOMS" ONLY -WOT PWAS a\ V^TORO<Anew To AfttK'Vf V*kt. frovl**) co^dpN11AI *AV Tice- l k OETCCTOe. S ?yiL.. L 1 2 3 4 5 / IA I /V LOCATE e METER- KUW FROM , -2"-6, CjO--ewe sim'iow LOCATE PAD 5r */* At" <v r ^`A/$ 2"-O)----------X-------t--*-- XI--CAl p* VTATlOkj >!- -b&OOOf M/^MUAl fZ.CtE'T ^ 1 'i ' JI //\\\ //t\\ weiOHEAD 4"^ Ii // iv\ //|A SPPIMKLtR 4 1 rCXJ 3/4" a#*#''" " "0*3--P*J" /FCv\ I \3 6-0O) : V A. J 'iBXW X (&fM40 &"-) -r^u--=--------------X3---------- (b\l &0C2 g>`-AQ GRAD6 > - 140' - -C"-A> 4 fe> / cJ - '1 ~C V41 F /RO M <-JW- 4kOl-(o"-C o &>> PS I & criiMozz. aik Ate wp supply SO PSiCs ;ji,. i 'hydbocaksow vTD/FROM 9,W*Jl Stl'OlZ -5>&o-&>{ I J^fZD-720Z-&;TT)- 4,,y-c?74 6 'HYD0OCAKSOW sffyTKgY S,W 51*072 -2>^0-*0l ~{PfZA-l2Z-&^-t)' ~Xr /4-1 VJONJ- bLOCKIKlO D[?,VlM TO M~LO'N *** FOR DRY ^PKiNKLER. MAsDR.- 3A' T?,U y4':^ * 6WAvGs. /4n TU>|klj< 6TRMKJ WITH H5AYY DUTY >C.R6M FOR 41P- 3^0 PSI&. ' A RgV. DWG, MAK COOftO. REVISION Qv r*Y APP, REV. DWG. mark coono, sr^ ^G FVSLC ^<3 0V&' CKSO 6<9'X4" 6Y-914 : u. --DSC-- 4"V-(?74 [?6> l3/*' \w JW y4 REVS SION BY DATE K i- i ;i.'i . -i.1. .['ll; f 2# f' l.L _ vent "T(T 1 V 3/4*mS"i 'ffiffl A v-*4o .*. i* :mmv -X--_r**uir-ji HOSE ^CONNECTION ^_40 W'JM.f',M- j ! v.r /< r - l- Tif** ,vl" *i ;-j ?;u| Xtt1 M', -1' iii^l.f f`iSj - ^4k-1^1,1 >! i) i f- i ; m V\i iVIII-^- 1 '* '' t ***', i jj/ *~- '"S/iJ':'- ,,r^ 4/ - . .\ 'r. ; > 1^ ? ,r liKk- ' ~'sN: IS )l!| i-SisiM li. ./ f ; y` : yf^'i'1'-- 'Xf-^ir v "'jt-Jfk >"t' n''r5j*i'r 1 |V n^H. jr 1= it `J'i,#Slvt ' :4't vM-'- .. VP-i VENT 3/4* V-882 IX- * OIOC FT 4410 (4F4E10J DRAIN -x3"--10*#! V-93 > ''n|r" tifrix i, ; 1 !#V ' = ; i'.iir.N ; .Sltyi;# iV1..' 900*f 4* V;- `it, 6* 6* RQ V-374 H 10*x8, e* :^.4o:2nt8o . Wk* 16* ^RC ||i-'- " B3* i'f.-- f-ii ', , )? ,l' , r , - i -ip, in t it't i^-\Y,T`i>. i v1 '-itr. T .f J4'1 !`;H , ' ;FIj' / ` ** BR-8701- 1Q -ft > J* V-882 ' H^EWr'K'l ' ,^ii,,ii. 1 'i'l *|j!Jr F ; 1 it!\ ,'iijf: , ' jt -l i ^Ku *&\ /Cl \ V ', / "*" 1 \v / OIOC . ,' j*rj|i?H' \-\\yf-\ ' , 4* , |j , p.. '; [,-jf Ji 4, i 1 i'l! \ l-'W!:/ -882 4)^ FLARE `POp IiNUT-], 3/4* 4 feyg----.-'Mafe1; BR-8701--T 10* T)- '*$'' W-. ' ' W:-f4w1-,1s 0* ^*!Vt33 v-882 V-83 s^f-' / ^iL--11 i*;^- 1 -' ti&iis-'1-' Jx j 0* ! ;#?'V-882 llFi(- 'm:- I-' 1* V-367 10* V-83 -><3" i#' I; -i;,Ap. V-367 hvfe.akts:- Sip *5*r=Li1'L: 1 LOW PRESSURE WATER Bi-088 950-001 INSTRUMENT AIR Bl-006 B60-001 * $ ^L\p iM< ;M> - Vi-W; ,, |p' :f: 1i r Ji!?: %?>; IflYUf d-.-N h} r \t Vj1 iv WM*r JS1^ < LPH-8802- 4* - y VENTT7 3/4*X -XH '3X V-S6 x 2* `.X ; V"5. ipr '* > C4/24*T0 <}! o * 1 'l`;l ' hose STATI0H|||^t ^, fcpp. 'fiS ft' r *;&: Pi !Wi -, < Ifl-6218- 2* -Q V-40 ^'. i* ' ~ j; r> i* '4^., Tp y 'T5-21 A/s 'rfsw - 'Uv.^, <' f p., ,, 4 HOSE '^CONNECTION $Wno ' ife'Mi:- 0-,' ftv .ti rf! r * $#&&:. ''4-WT^v't' ' r >1 . .vittetji'-'i-'j t'.-t; ! <- * v iI ^ : J `,;L-f. -&,- '-i'i t 1I If: `l ' '? .- . H yi<Sf --I* 900*X 4* :V*Sif Hy--!, 1,rt'i- , 5 -!$! > 'dtflWTip'i '.Mp'ttvif1' ^^s. J : 1 A f S'sH - , it4- :lll 6* aju;-!fSis'i" [U *$ K&431-048 ^kjs:. i7 TO AM3 FROM OIL HEATER #X Si-053 980-001 8 -j gO-S3QQ~ 2* -3 > V-882; * JLL DIOC 2" V-116 -C 80-5308- 2g -B )-|--[X 3/4* V-882 LOCATED AT CLIFTON #6 ! J-'wl S2* ,Yr*n6. '!%P 'dK;| '?*w ^ ' " i It^ORftlN 3/4*k ^882 ' "r1 ife - h< & FROM MINIMS HATER HEADER 1 Bl-006 060-001 < HH-4506- 10* -C > :V'':/ - ;*V`' 1 ,JU'r J- V* if; - ftfr ,y * -I -?*$&)*-v METER RUN SPEC - SEE SPEC SHEET PRESSURE SPZSOT rsv. cmo. mm coom. REVISION I ";J ^ '^lJ}|! 'v . f. lylit 4!% .',il v ,'kj* 8R-07O1-: FQR^CORftO^ -i ;> j- ^h jM. .k HiflHi : CATHODIC PROTECTION *Si' tuft* #v\ pCO--O'R-Dji".' " DIOC i3+, ASV*~ DIOC pi: 1H 'Vill-I': , 6* - ' f';) 2*!'. * CM DIOC tlr'f'S'j ,, VENT AYy-3i*82 ^Hl-- SLOCK VALVE AT TIE POINT DRAINS - it ' 1' - SEE PIPINO OEJAILS FOR EXACT;, LOCATION f/asL"'1.' - rap) 'J ' l[t :`-rk iW. ' f,1'' -fw C'fjii REVISION 'tfjMj* J'! . afiNu' (wfci ijjpitl Y DATIjWP. M7 BMi*' HJUOt OOOM b#pM' -i!` :D. v \"t 4^' wi .twiwea s 1 ,1^ - - v . . , ";''',|,]l;"'? REVISION wsatcM s''1'''' ' ' ''i !'< j =*: i >jr (: - :ifif . .1 -? Pt'W,jL(.' . 4Mi C'SSjii MMC COORD. US! ri. Milter:* n1 :f riSSEfrltilrV1- iSs'r.! 0E8IWED Mr U;i -stji-y K r:ls rjt1" .....AVoflte TONViZUMO CHECKED APPROVED ^y^; "' APP, MF8. REP, , vTHJi>T. T H ** tees , 'iEj'.w'X. i' M'- ,1 'fa"& c. i(v "!T 1F" re* uofuranMt i< :>l jUft PW CawnwiiTlpM?^! ?; FOR NOTNBCE X<M.Y t'&y *jFF*p !; `A M I S'5 %'! J l.i L f fcvY H w/ j*i.. Ijjjf A1'1" ION r i--*: itfilitl: ! Jills' i.'.jjjJiiVt 1 isfjjjFsiW' **|WS r:^ "''%! $ -4'#J ECOUOOY#XTii* -1 rlSftrl^'^ SUMP WATER PUHP > 1 *iJ$'*. 'Lf.. ' 'V :<!!((]: P iL' ^/;v 1^ Oil.; 1 nF^; ' V -!*;%? >;! fSiL 1 vent XI- 2' V-93 M' j.-i'*" . - IOC i ^ T^m;,Xrs! DIOC' :'f -'** ^1 *7.-I K f\'JV",, \Vtf,\. ri * PC, Hij Sf. `H . ' '-4>4 ! r^'ii i#f ri. '..!.i- M f'-1;TMSV8>4 y ',. :,i > $***!- ' ^1^;:' ^ mite: W.ftt-1 1 lufe 11 < MH-4506- 10- -C > -` '.4t!:. :r 11 : ,,'I: :i 1 i.iciV- >; -. ' r "i V > ' . x: ' w ira# rfjij v v^ijill'' Jjfl.H r :. *i S-' HI ' V 3;P ,, ,, H> k-h . -' i4Vii,:^ ' t* V'' !:6 #|i M }&4l '1 Hi! nity^i; ' ' I " \ .';4$ 'i-fpmWft' r, , K3jliSM ' DOUi 0*% PM9,HWWD WITH i>;,; Brahn '. TONY^ZUMO Checked . t , , APPROVED | ' ^ ^2/85 r. '' -- -i \ -------------- --- V'C , ( e, fefr $F* BRINE PRODUCTION w*. , H0Tit^i . 4 i j fei ,,tiV 'i'jKis'..' OATS 1 APP. MF8. REP. ; ------------------- 7" Hfilrf-;.!- m.WVutoijaur i :i: ? 4i'i PW,OOWm^WK^i -.rt-l^ k JOB NUMBER FOt a. *> 80020-70918 H 'Pf , t-i . ^ <- i Hi j' I ;rV`S-i', 1 :J 'i . !'(....., 1 fH 1 'j \ INST. HO.'Si ,4400-4449 M'. 4419 fiif.,-- V LAST LINE NO. USEOi , 8702 ALL REMOTE INSTRUMENTATION TIED TO PROCESS COMPUTER SYSTEM. . , ;,Vm. ... iK'i,;U;:.^?;n-; fy1l. Hrffriv^j.. . y^y^r^Vj/ v<i H*hi- !* Y>. ^ !f s,; mm UNLESS OTHERWISE NOTED* ALL ITEMS ON THIS QRAWXNS ftREi NEW ! ;: UNLESS OTHERWISE NOTED* ALL BRANCH CONNECTIONS ON THIS DRAWING AREi I'^jr*-,. Z " i 1 DOW,CHEMICAL U.S.A LOUISIANA DIVISION PLAQUEMINE.' LATM :-`rW, 'HELL; IS :,s . SCALE: Bl-087-B60rOOlH!H -AijjaK,:.>. .gi . : I PRINTED; gga^QS/MS/BB DO 005938