Document rxoDXr2x1qn68KVew1KmOX8LV
r rr\
at*
Interoffice Communication
To From
Reactor Foremen (4) R. VJ. SeyTOOUT
Date 3/8/74 Subject Operating Procedures
Please follow the procedures listed below starting immediately in V-10, V-ll and V-12 Buildings.
,
1. REACTOR DIET PROCEDURE
Reactors are to be dumped with the manhaads closed. Break
vacuum using the manual vent (disconnect bolts on steam valve).
When reactor is empty, pul] air thru dump valve for 15 min. with steam
jet. Then open the reactor with vent tube inserted immediately.
Run vent tube exhaust on open reactor for several minutes before
rinsing or water blasting to prevent forcing VC vapors out the
manhead. This procedure is to be done to reduce operator VCM
exposure, BUT you ''.rust enforce the use of vent tubes in the reactor
manheads immediately after opening to be effective.
If you get a reactor that won't dump, pull a vacuum on that reactor for thirty (30) minutes with steam jet. Then open the manhead and immediately insert the vent tube. Exhaust for several minutes before working at reactor manhead.
2. USE OF BEUZO-TRIAZOLE
Begin use of Benzo-triazole in PVA solutions today to aid reactor cleanliness. Enter reactors only as necessary and water blast as effectively as possible to aid in reducing entries.
The first three shifts of usage of Benzo-triazole will be followed by Process Engineers.
Safety in use of this material requires that you not consume this material, so have the men was their hands immediately after use to prevent getting into their mouths or their food.
The reactor dump procedure is temporary and will be revised, but this procedure is to be followed now and vent tubes put in reactors immediately upon opening or disciplinary measures must be taken.
/{f/ ^ y
R. W. Seymour
RWS/lpb
cc. DFG, BJH, 15 FH, JWP, RJF
7*3 C3
<53 "ST r^> <s?
C53
o>
<53
LEAD OPERATOR SHIFT REPORT
LEAD OPERATOR BUILDING ' ______________________
DATE_____________________
SHIFT
3W
<55
<3} <55 1-0
<35
1. Ventilation Fans All Operating
2. List Any Fans Not Operating
Properly.
.
3. Vent Tube Exhaust Blowers Operating Properly.
4. List Any Maintenance Needed On Vent Tube System.
5. Maximum Vacuum Pulled. By No.Recovery System
6. Maximum Vacuum Pulled By No.Recovery System.
1ST CHECK CM SHIFT
.1.
2 3. 4.
2ND CHECK ON SHIFT
.1.
2 3. 4.
__________ ; In. Hg.
________________________ In. Hg.