Document rxjjjaVQnpom1aYj3y0vVzGMe

ERIE LAKE PLANT REVISED ASBESTOS SURVEY NO. 1 Asbestos levels at the Erie Lake plant were surveyed on March 3, 1972. The samples were evaluated by the USPHS-developed procedure. The results are summarized here: Sample No. A-1 C-l C-2 Area Roofing Mill Saturator Paint Dept. - Mixer Paint Dept. - Area Fiber/cc 1. 2 7.6 1.8 The level measured during asbestos charging in the Paint Department exceeds the 5 fiber/cc OSHA limit. Revision Date March 22, 1972 NUCH07705