Document rxeyrQkXywBGzkXwOzem0Xx4G
American-e>>tai?dand
H EATING
PLUMBING
Erecting Directions Operating Instructions
Parts List
American
Severn Boiler
COAL, OIL AND STOKER
American ^ <taitdai?d Radiator
CORPORATION
PITTSBURGH 30, PA.
ARSS M60 I I 5 -M 6 -401
PLAINTIFF'S EXHIBIT
ftST- SI/
08467
SEVERN BOILER
by
American - c^tattdaud
Installation-Operation
and
Maintenance Manual
-- FOR COAL, OIL AND STOKER
AMiRiCAN-<^taftdatd[
First la hunting ... flnf in plumbing
08468
i imw i il iHr'i
SECTIONS MUST BE ASSEMBLED ACCORDING TO ARRANGE MENTS LISTED BELOW TO INSURE PROPER OPERATION OF BOILER AND THAT JACKET OPENINGS MATCH WITH CONNECTING SECTIONS
CODE LETTERS
F-FRONT SECTION
CX--8" CENTER CONNECTING SECTION
C--8" CENTER SECTION
NC--T CENTER SECTION
BO--BACK SECTION
Boiiar tiumiw
17 21 25 2S 33 37
ARRANGEMENT OF SECTIONS
R#ffular
Special Oidr
; ---
F-CX-BO F-NC-CX-BO F-CX-C-BO F-NC-CX-C-BO F-C-CX-C-BO F-NC-CX-C-CX-BO
F-CXT-130
F-NC-CXT-BO F-CXTC-BO F-NC-CXT-C-BO F-C-CXT-C-BO F-NC-CX-C-CXT-BO
INCLUDES CENTER CONNECTION SECTION (CXT) WITH FLANGED CONNECTION FOR TANKLESS TYPE WATER HEATER WHICH CAN BE ASSEMBLED IN BOILER WITH HEATER OPENING ON EITHER SIDE AS DESIRED.
IMPORTANT
If water condition should be encountered in the basement, or where it has been necessary to water-proof the basement floor, boiler should be mounted on a concrete or hollow tile base, preferably to a height of at least 3".
DRAIN TAPPING
Drain tapping is located on face of back section at lowest point practical for completely draining all the water from boiler. Connect drain cock with this tapping. Do not connect drain cock to return pipe line.
CAUTION-WATER BOILERS The expansion tank should not be set in a cold or an exposed place. If the pipe leading to or from the tank freezes, senous damage may result. If valve of any description is installed in the piping leading to or from the expansion tank BE SURE THAT IT IS OPEN WHILE THE EOILER IS IN OPERATION.
5
SEVERN BOILER (1)
USE THIS BOOK
FOR REFERENCE WHEN ERECTING BOILER, ORDERING PARTS AND FOR OPERATION
ekriol Order
BO XT-BO 3-BO '(T-C-BO '-C-BO :-C-CXT-BO
FLANGED 3 CAN BE I SIDE AS
where it hould be t least 3".
}i
' ; j i |
'
_ .j
i
;
j' .
NOTICE MR. STEAMFITTER!
Use regular steel nuts and flat washers for assembling bailer. Apply oil or grease freely to tie rod threads while assembling sections to prevent stripping of threads on rod.
After drawing up boiler, remove steel tie rod nuts at front and replace with SAFETY NUTS.
Lubricate nuts well and tighten with FINGERS ONLY.
FAILURE TO OBSERVE THIS MAY RESULT IN DAMAGE TO BOILER
PROMT
BACK
practical idc with
:ce. If result, m the IS IN
I
08470
(2) SEVERN BOILER
1. Remove aihpit door with binge. Level bate in iinal position. When locating base be sure to provide at least 25" between side of base and nearest wall if large size internal water heater is to be installed. In case small heater is to be used, 13" clearance is suffi cient. Place front section on base and support with prop. Bolt section to base front. Insert bolts from firebox side of section. Make nuts finger tight and back off two threads. Attach draft pouch to rear panel.
I FRONT'SECTION IN PLACE 1 No. 1
!. w' I
\`
2. Clean nipples and nipple ports with kerosene or gasoline and apply good lubricating oil. DO NOT USE RED LEAD, PAINT OR CEMENT. Drive nipples squarely into section using block of wood and hammer or preferably an aluminum headed hammer ii available. Gauge large nipple with nipple gauge in both directions. Cutout in gouge must rest on nipple with legs of gauge touching finished face of section. Use rule for small nipples. Nipples should protect ,V' more than half their length and protect equally all around. TILTED OR COCKED NIPPLES CAUSE LEAKS.
GAUGING OF NIPPLE No. 2
V
EH--3
Sfinfu
rr-
rr-
u, ]
3
A
ASSEMBLING v
3. From arrang Lag to code letter on .
Paint ground jo-. ASSEMBLE MORE Tr is assembled without rods through lugs cn
For No. 21 and L tie rods through 1" !a: 10" block at top. Thu On center section usr nipple openings.
Drive sections in p over nipple ports. DR. TIE RODS. Tighten nu OIL TO TIE ROD TKRE.
Back section is era and short rods through evenly on all 4 rods, firebox. On oil burning
After boiler is asse: replace with safety nut cate safety nuts and me boiler.
Tighten nuts which : and subject to not less tha for leakage to insure aga gauge supplied with boi. Connect supply and retur-. between bottom of sections Portland Cement and thre-
i
08471
<@
SEVERN BOILER (3)
jige. Level eng base be rween side of t size internal In case small ranee is suffile and support e front. Insert on. Make nuts reads. Attach
j \
--.V.
i J i
tr
t
i
i i
ASSEMBLING CENTER SECTIONS No. 3
(OIL BOILERS ONLY! No. 4
3. From arrangement o( section (See table inside front cover) select next section accord* ing to code letter on section.
Paint ground joint of each section with red lead before adding nert section. NEVER ASSEMBLE MORE THAN ONE SECTION AT A TIME, except in case of No. 17 botier which is assembled without draw-up blocks. Sections for No. 17 boiler are drawn up by use of tie rods through lugs on Front and Back sections.
For No. 21 and larger boilers, insert long tie rod through 1" tapping near top and short tie rods through 1" taopings near bottom of front section. Use flat steel washers at bottom and 10" block ot top. This block should be in a horizontal position in recess provided on section. On center section use 10" assembly block across upper and large washers across lower nipple openings.
Drive sections in place with heavy block cf wood, striking blows as squarely as possible over nipple ports. DRAW UP EVENLY ON ALL TIE ROD NUTS STARTING WITH LOWER TIE RODS. Tighten nuts alternately until sections make contact at gTuund jointj. APPLY OIL TO TE ROD THREADS WHILE ASSEMBLING.
Back section is drawn up by running long tie rods through lower lugs on side of boiler and short rods through lugs on top of boiler. Place regular washers under nuts and draw up evenly on all 4 rods. Attach coil hole covers to back section if water heater is not used in firebox. On oil burning boilers 17, 21, 25 attach combustion chamber baffle as shown in Fig. 4.
After boiler is asembled and drawn up tightly, remove tie rod nut* in front and replace with safety nuts, as directed in "Mr. Steamfitter'' notice on page one. Lubri cate safety nuts and make hand tight only. Failure to do so may result in damage to boiler.
Tighten nats which hold front section ta hue front. Plug tappings, fill boiler with water and subject to not less than 10 or more than 30 lbs. pressure. Inspect boiler inside and outside for leakage to insure against breakage in handling and shipping. To safeguard accuracy of gauge supplied with boiler DO NOT INSTALL GAUGE UNTIL AFTER TEST OF BOILER. Connect supply ond return piping. '"Putty outside of sections at joint with boiler putty. Grout between bottom of sections and base and between base and door with a mixture of one part of Portland Cement and three parts of Asbestos Cement.
08472
(4) STVEBH BOILXB
fL"
ASSEMBLED BOILER (STEAM) No. 5
COAL BOILER (STEAM) No. 6
4. Attach gauge to boiler. Attach water
for turning
oolamn trim to (team boiler and install gauge
glass reflector at rear oi water glass by
snapping over hexagon nuts. Nuts must be
adjusted so that hexagon corners are paral
T lel with side oi jacket Plug unused tappings
on steam or water boiler. Paint ground seat
on bach section with red lead and attach
6
smokehood or collar. Match grind oi smokehood with grind of back section when tight
2. Insert regul screw in "Steam''
3. Attach cle hood. Us
4. Place weii short rod For water
ening smokehood bolts. Attach water heater
5. Insert thre.
ii used.
Attach front jacket panel hut do not tighten jacket screws. Screw jacket studs into tap
below eye hood with cotter pin.
pings at upper comers at back section and at
6. Move rear
tach back jacket, starting with R.H. hall (seen
regulator
from front of boder), then lower center strip and
drait door
then L.H. hall. Insert jacket screws but do not
tighten. Place side jacket panels in position and then top panel. Before attaching jacket panele remote knockouts opposite used tappings.
Stoker Boilers--Installer must provide cutout in jacket side panel ii side fired in
7. Release res check door
8. Counterwe: starting hr< requires on.
stallation is required. Attach dear hinges and eatchee but
tighten bolts only moderately. Lock doors into position with hinge pins. Doors should lilt easily over catches and close tightly. Adjust doors by tapping hinge and catch lightly. Alter adjustment tighten hinge and catch plate bolts and jacket screws.
Alter fire is boilers as indica pressure on sten closing draft doo open cold air chi
To obtain
Oil Boilers--Attach the iront base plate to the base with the three machine screws pro vided. To install Oil Burner, remove and discard the sheet steel cover plate which is
To obtain 1<
attached to the Front Base Plate. Attach the mounting bracket in the upper holes oi the Front
REAR WEIl
Bose Plate, using the screws provided. Install burner as per instructions accompanying same.
while regulator
Attach saiety valve on steam boilers and damper regulator on hondiired boilers. Adjust regulator as per instructions on Page S.
On water rystems locate expansion tank so as not to be exposed to iressing. Fill system up to V} oi erpansion tank. On closed system fill until relief valve relieves. This must be at
Ii higher tem front of regulator cases it may he
less than 30 lbs. Ii necessary adjust valve setting. Remove rim and glass from gauge and set
movable pointer under automatic pointer. Replace rim and glass.
08473
cJ
0
SEVERN BOILER (S)
INSTRUCTIONS FOR ASSEMBLING AND OPERATING AUTOMATIC DRAFT CONTROL
:
<3
ILEfl d)
machine screw* procover plate which is 3r holes of the Front lccompanying same. Lied boilers. Adjust
freezing. Fill system re*. This must be at i from gauge and set
( 1
1. Face regulator with rocker arm to rear of boiler. Note: Use wrench on hexagon end for turning or adjusting regulator. Never use regulator lever.
2. Insert regulator lever so that notches are on top and hole in lever points to rear. Tighten screw in rocker arm so that it engages with notch. The notch nearest the rear is for "Steam" and the other notch for "Water".
3. Attach clevis to rear end of regulator lever so that threaded part points towards the smokehood. Use Sat headed pin with Sat head pointing towards smokehood.
4. Place weight on front end of regulator lever so that this end is held down. Screw upper short rod into clevis so that it projects above clevis approximately ?i" on steam boilers. For water regulator it should project 3".
5. Insert threaded end of lower (long) red through eye in draft door lever, place ball collar below eye and screw nuts on rod. Attach flat end of rods to intermediate lever on smokehood with long rod next to cold air check door as shown. Lock rivet in position with cotter pm. Turn regulator until upper rod is approximately vertical.
6. Move rear end of regulator lever down until cold air check door opens -ft". Then, with regulator lever in this position, adjust lower ball collar and nuts at draft door so that the draft door is just cracked open (about thickness of knife edge.) Tighten lock nuts on rod.
7. Release rear end of regulator lever so that front end drops to its lowest position. Draft check door must be closed now and draft door in base must be open.
8. Counterweights are adjusted on regulator lever to suit temperature requirements. Before starting fire in boiler set weights so that front end of regulator lever is held down but requires only slight effort to raise.
After fire is started in boiler and temperature rises to approximately 180 degrees on water boilers as indicated by combination altitude gauge and thermometer or approximately 2 lbs. pressure on steam boilers as indicated by steam gauge, regulator lever should raise, thereby closing draft door. Further rise in temperature will cause regulator lever to raise higher and open cold air check door on smokehood.
To obtain more heat, move FRONT WEIGHT further from regulator.
To obtain less heat, move FRONT WEIGHT closer to regulator.
REAR WEIGHT acts as a counter balance and after setting does not require changing while regulator is operating within the ordinary temperature range.
If higher temperatures are desired than can be obtained by shifting front weight to extreme front of regulator lever, then rear weight should be shifted closer to regulator and in extreme cases it may be removed and placed on front with other counter weight.
08474
(6) SEVERN BOILER
Vi ' '
BLOWING OFF STEAM BOILERS
Oil, grease or grit in new systems may cause steam boilers to foam. In such a case, blow off boiler under pressure. Repeat blowing off until boiler water and water column glass are clean.
To blow off, connect 1 J/o" pip* with valve to blow off tapping on back of boiler (upper L.H. side seen from front) and run pipe to suitable drain. Close flow and return valves if available cr all radiator valves. Fill boiler with water to top of gauge glass. Build hot fire in boiler or start burner and when steam pressure is over 10 lbs. but below 15 lbs. open blow off valve and regulate valve to maintain pressure in boiler. Feed in water as required to maintain full gauge level in boiler. Continue for about 2 hours. Then drain water to proper level and remove blow off piping.
If water supply has not sufficient pressure proceed as above but open blow off valve fully and let pressure drop to zero. Then close valve, fill up water and repeat several times. At end of blow off build up 10 lb. pressure, shut off burner or quickly draw fire and blow water out through bottom drain opening. Refill to proper level, AFTER BOILER HAS COOLED. Do not use soda, alkali, vinegar or any acid for cleansing the boiler. In severe cases, the use of ' 'Vinco" is recommended (sold by all branches of American Radiator 5 Standard Sanitary Corpo ration). Use 3 lbs. of Vinco for 350 sq. ft. radiation or less and 1 lb. more for eacb additional 150 sq. ft.
i r t4
3
*
H
Keep *
Keep v even with s PRESSURE ' AND THE SURE MAY
Clean
Do not tion, do net
On St? try SAFET. of valve a:
At enc fuel from c oil using g
Leave remove sc
With column ar U at this t to presen:
On in advisable
IF BC INSIDE C
General . 1. G
under ruil 2. C
firing in c
3. V\ base clas.
4. D adjustme:
Whe at tbe ae: sure or te
I
08475
cP
SEVERN BOILER (7)
ATTENTION TO BOILER WHILE IN OPERATION
Keep water in steam boiler up to center of water gauge glass.
iILERS
Keep water systems filled to V3 of expansion tank (as indicated by moving band being even with stationary hand on altitude gauge). ON A CLOSED HOT WATER SYSTEM THE PRESSURE MUST NOT EXCEED 30 LBS. IF IT DOES IT MUST BE RELIEVED IMMEDIATELY AND THE CAUSE OF FAILURE INVESTIGATED AND CORRECTED, OTHERWISE PRES SURE MAY BUILD UP AND CAUSE DAMAGE TO HEATING SYSTEM.
Clean boiler surfaces at regular intervals.
i Do not draw water from boiler while in use. When adding water while boiler is in opera-
tn#such a case, blow
r
lion, do not open supply valve fully but add water slowly.
water column glass are
V
On Steam Boilers -- at the start of each heating season and once or twice during season
try SAFETY VALVE to be sure it is m working condition. To do this fasten wire or cord to lever
:k o? boiler (upper L.H.
of valve end pull lever -- standing safe distance away from valve.
turn valves if available Id hot (ire in boiler or oec blow off valve and to maintain full gauge per level and remove
ATTENTION TO BOILER WHILE NOT IN OPERATION
At end of heating season clean boiler surfaces thoroughly and remove ash and unburned fuel from grate and ash pit. Spray Hue and firebox surfaces with light lubricating or crankcase oil using gun with extended stem so as to reach all corners.
n blow off valve fully
*at several times. At
' fire and blow water
HAS COOLED. Do
ere ewes, the use of iarri Sanitary Corpos for each additional
Leave boiler doors and dampers open to permit air circulation thru boiler. Clean and remove smokepipe where feasible and oil door hinges.
With steam boilers, at end of season, add sufficient water to fill bailer to top of wafer column and leave it that way until fall, when water should be drained again to proper level. If at this tune boiler water is dirty, drain water, flush out boiler, and refill with clean water to prescribed water level.
On water boilers keep system filled with water.- In other words, leave water alone. It is advisable m fall to drain a little water to remove sludge but not more than necessary.
IF BOILER IS NOT USED DURING WINTER TIME IT MUST BE FULLY DRAINED (SEE INSIDE OF FRONT COVER).
ATTENTION TO FIRE ON HANDFIRED BOILERS
General Rules:
1. Give boiler regular attention especially in severe weather when boiler is operating under full load.
2. Observe bring instructions. Do not disturb lire by unnecessary frequent poking and firing in driblets.
3. When attending to fire, open choke damper in smokehood and keep draft damper in base closed. Close ash doar when opening fire door and vice versa.
4. Do not leave fire door or ashpit door open in order to check or increase fire. Correct adjustment of the dampers will regulate fire to supply the amount of heat desired.
Where provided, move weights on regulator arm so that the draft door will open or close at the desired pressure or temperature. Moving weights toward front of boiler increases pressure or temperature.
]
08476
(8) SEVERN BOILER
o
5. Do not lat qih*t accumulate under tbe grate is ashpit, otherwise burned out grates and corroded base may result. Remove ashes daily.
6. If lire does not burn evenly over the entire grate and seems sluggish in starting up after grates have been well shaken, cleaning of the firebed is required. This is best done by allowing the fire to burn down until a thin layer of fuel is left on the gTOte. Shake well and remove slate and clinkers with poker and scraper.
7. If tire was neglected for some time and grate becomes covered with slate and clinkers massed together, the quickest way to get active fixe is ta break up the mass, dump through grate and build an entirely new fire.
8. If hard clinkers lodq# between the grate bars do not force the shaking mechanism too hard. Dislodge the obstruction with poker and avoid breakage of parts. The possibility of material lodging between grates is greatly reduced ii grates are not shaken to the dump posi tion or limit of their movement. Ordinary shaking of fire can be accomplished by partial move ment of the shaker handle.
Firing Instructions: To start fire, open choke and draft damper, place kindling over entire grate and light.
Add fuel in small quantities until lire is burning well. Then fill with fuel to a level about half way up to fire door and bank up in rear. When this fuel is thoroughly ignited or coked, the fire is ready ior lull charging. When firing bard coal, shake gently, bank up slightly in rear and till us fuel up to about level a! tire door. When firing soft coal, break up fire if required, bank steeply in rear leaving only a thin layer In front. Fire fresh fuel only in the front part and leave glowing coke in rear exposed.
After firing, open air slots m fire door slightly when using hard coal and more when using soil coal. The slots can be closed again when charge has thoroughly ignited or turned into coke. Best sitting is lound by experience. Caking soft coal should be broken up by stoking about 1 hr. or more alter firing, the time depending on operating conditions.
In miid weather, keep about 2 to 3 inches of ash on grate. As more heat is required, reduce thickness of ash layer. Always tire up to level of fire door or more. Shallow fires give poor combustion. The choke damper in the smokehood can be used to check fire. Do not close choke damper fully immediately after firing, particularly with soft coal.
Shake gTotes only as required, unnecessary shaking wastes fuel. Grate can be locked in level position by catch on base front.
Fuel Size: The size best suited for this boiler is stove size. Larger sues can be used particularly with
soft coal. Nut sire fuel will be found generally satisfactory bui still smaller sizes should only be used if a strong draft u available. The thickness of the fuel bed with such small sizes should be kept at about 6". When firing small size fuel, always leave glowing coal exposed in rear cf boiler to ignite combustion gases.
L
9'SMOKIEE
\JbPPE
Pi
J____ I SECTIC (OIL F
3 PIPE
(HAM
DIMEN
Boiler Assemblage
Number 17 21 25 29 33 37
08477
out grates
m starting up j best done by ihake well and
slate and clinkers ass, dump through
ang mechanism too The possibility oi
a to the dump post 'd by partial move-
e grate cad light, a level abo.it half* d cr coked, the lire aghtiy is rear asa j li required, bank oat part and leave
i more when using ted or turned into icen up by stoking s. s required, reduce 3w fires give poor ire. Oo not close
i can be locked in
particularly with sues should only such small rues mg cool exposed
VJ SEVERN BOILER (9)
[OH FIRED BOILERS)
{STOKER FIRED BOILER)
3IDE VIEW (STOKER FIRED BOILER)
DIMENSIONS FOR COAL. OIL AND STOKER BOILERS
}
i
b
Boiler Assemblage
Number
Number and Size oi
Tappings
Flow Return
A
Boiler Dimensions-- (Steam and Water)
B CD E
L
t
17
1.3" 1-*"
2-3"
1154
754
--
17
454 2354
21
1-3" 1-4"
2-3"
15 54
754
--
21
654 2754
1
25
1-3" 1*4"
2-3"
1154
1554
--
25
854 3U4
29
1-3" 1-4"
2-3"
1554
1554
--
29
1054
3554
33
1 2-3" 1-4 |
1954
1554
--
33
1254
3954
i
37
1-3" 2-4"
2-3"
1554
2354
16
37
1454
4354
08478