MINUTES
of the
TECHNICAL 8c RESEARCH COMMITTEE MEETING
NATIONAL INSULATION MANUFACTURERS ASSOCIATION
Lake Placid, N. Y
September 19, 1963
Glass Section
The meeting was called to order at 9:IS A, M. with the following in attendance:
V. L. Miller, Chairman W. Acker
D. Davis H. P. Eoopos F. Kaxklin A. Kevlin R. S. Miller J. M. Barnhart
Pittsburgh Corning Cor?.
JohnsI.lanville Sales Corp. The Ruberoid Company Fibreboard Paper Products Co. Muadet-Cork Corp. Owens Coming Fiberglas Corp. The Ruberoid Company NXMA
STANDARD METHODSCOfFTESTS
The list dated 6/1/63 was discussed and several minor changes were noted.
INDEPENDENT LAB TESTING
Mr. R. M. Lander*s letter ci May 24, 1963, to Mr. V. L. Miller r41ating to pipe testing was discussed. A copy at this letter will be seat to all Committee members for perusal.
PROPOSED REVISION TO HH-I-523
Tlie draft of this specification dated 7/1/63 was discussed.
Various government agencies seem to bo in favor of writing product specie firatirais wherein classes of pipe insulation are based on various jackets or systems at Jackets, ft was the consensus the Molded Section that they wore definitely opposed to this philosophy of classifying pipe insulation.
/4 motion was made and unanimously passed that a group of individuals moot with A. Graul of the Bureau of Yards and Docks and attempt to change his mind pertaining to this philosophy.
2
With respect to the sampling, packaging, assurance quality provision* and inspection levels in all specifications, it was deemed necessary that the industry select proper levels of inspection, etc., that it feels is equitable to all concerned. Letters from M. Streepy and K. P. Hoopos to the Bureau of Ships an this subject will be circulated to the Committee.
This subject will be placed on the Ager. la of the ncsS Committee Meeting and a definite conclusion will be reached on this subject at that time.
A letter ballot will be sent to the Comr littee pertaining to the following specification changes.
MIL-1-2 73 ID
Change par.- 4. 3 to read as follows: *" ampling for cuallty conformance inspection, - For purposes of sampling an inspection lent anal! coneist of all pipe insulation of the same grade, < lass and type. A bled; made from the same lot may be used to comply wi h this specification. "
Change Table XXX Physical Requirem* ots as foilowe:
(a) Change density average, Ibs/ca ft Maximum
Grads X, Class b Grade Class d Grade XXX, Class e. Type X Grade XXX, Class e. Type II
14.0 14.0 14.0 22. C
(b) Change modulus of rupture (average) lbs/*q in. rr.inimu, and
footnote.
'
Grade ^ Class b Grade XX, Class e Grade Class d Grade HI, Class , Type 1 Grade XXX, Clase e. Type IX Grade 222, Class f
40 40 40 40 60 40
MIL-1-2819
Change Table X - Physical Requirements as follows:
(a) Change density (average), pounds per cubie foot. maximum
Class 1 Class 2 Class 3 Class 4
14.0 14.0 22.0 26.0
3
(b) Change modulus <d rupture, poundo per square inch, (average) minimum, and delete footnote.
Claes 1 Class 2 Class 3 Class 4
40 40 60 65
(c) Change compressive strength at STj deformation (average) minimum psi
Tor class 1, 2, 3 and 4
73.0
KH-I-523 Change Table X Physical Requirements as follows: (a) Change density (average) lbe/eu ft maximum
14.0
(b) Change modulus of rupture (average) lbe/sq in. minimum, and delete
footnote.
40.0
(e) Change compressive strength (average) (at 57* deformation) lbs/sq in.,
minimum
75.00
standard paceics
This subject was discussed and the following conclusions reached:
1. Whatever the consumer specifies, the manufacturer will supply. 2. In specifications, when practical, the Committee recommends
facing*. 3. A standard list of facings would serve no useful purpose.
OTHER BUSINESS
Xt was suggested that the NIMA Government T & R Committee members located in Washington, D. C,, should act for the industry when discussing specifications prepared by the Committee.
ADJOURNMENT
There being no further business, the meeting was adjourned.
Respectfully submitted
J. M. Barnhart