PRESENT:
L. T. PREELAND - CHAIRMAN - PID - VICTCRIA H. L. ADA*M - SMP. PEL. - WILMINGTON S. E. BYE - rID - SENECA K. A. CHEN - ORCKEM - CHAMBERS WORKS - 3IDG. 1094 D. T. LEFFERTS - CR&DD - HASKELL LABORATORY R. M. SHEPHERD - PP&RD - WILMINGTON C. H. COLLIER. Ill (ALT FOR D. J. STICIER - DESIGN) G. J. SZUF.LEY - PHOTO PRODUCTS - FARLIN *
C. E. MARSH - STANDARDS SECTION 77/^
ABSENT:
R. E. BUCHER - PHOTO PRODUCTS - CONCORD PLAZA
J. G. HAVERTY - ICD - REPAUNO A. M. HAYES - ESD R. G. HIRSCH - ER&D - EPL D. N. LOW - PIGMENTS - EDGE MOOR
VISITORS:
W. DARNELL - EMFLOYEE RELATIONS - VTLM. - N-12452 C. Y . HCRN5ERGER - CRLDD.- HAS}---LL LA.PIr.nl R. E. WHEELER - SS>--
STANDARDS SECTION - (AIR QUALITY SUBCOMMITTEE
MINUTES FOR THE MEETING HELD THURSDAY, SEPJE)-
AT S: 30 A.M. IN ROOM
NTTMn!m.cL_JS?fTTrHm
APPROVAL OF MINUTES Minutes of the meeting helding July 14, 1977 were approved.
NEW STANDARDS
1. J10M (Proposed) - Determination of Moisture. Carbon Monoxide. Carbon Dioxide, and Oxygen in Stack Gases
Copy of proposed standard in pink sheet form was previously distributed and reviewed briefly. It was approved with minor
changes for release to the Engineering Standards Committee for approval.
2. S11T (Proposed) - Priorities for Workspace Sampling for Exposure to Chemjnftls
The proposed reply letter to comments received under Serial Letter 4372 was approved for release. The draft of this standard,
corrected in response to the serial letter replies and previously distributed, was reviewed and a number of changes agreed upon. These will be incorporated in the standard and necessary corrections
DIP 0904159.001
Air Quality Subcommittee Minutes
September 19, 1977
. T'ne rev' sicn v,* i2.2. her. be submitted to the subcommittee, The standard will be rel sea for issue following a two week review oeriod.
3. 512T /Proposed' - Strategy for Workspace Testing for Exposure to Chemicals
Draft of standard in pink sheet finished form previously distributed was reviewed and a number of changes agreed upon including the addition of the nomenclature. Corrections will be made and the standard released to the Engineering Standards Committee for acprcval.
.4 Si~.T 'Proposed' ~ Hardware for Workspace Ss-.clir.c:
The proposed typing copy previously distributed to the subcommittee was reviewed and miner changes requested. These will be incorporat in the pink sheet finished form draft, following a ten-day subcommittee review of the latter, it will be released to Engineering standards Committee.
REVISED STANDARDS
5. J-M - Stack Sampling Forts and Associated Facilities C. H. Collier reviewed current Design Division experience with sampling ports and sampling platforms on stacks. He reviewed with the subcommittee, comments on proposed revision draft prepared by C. E. Marsh based on input from D. J. Stitmer and C. H. Collier. Standard was approved with corrections as recommended plus miner changes .
6. T?M - Continuous ."tack Samel: ng_ f or C:.: Revised draft as prepared by f.. E. Sucher is attacned to these minutes. Standard will be released for November issue subject to any comments received from subcommittee review and response by September 30, 1977.
ADJOURNMENT
The meeting was adjourned at 4:20 p.m.
NEXT MEETING
The next meeting of the Air Quality Subcommittee has been scheduled for Thursday October 27, 1977 at 8:30 a.m. in PID Conference Room N-6501.