Document rxGVVpqE1x2grwN0BkLZGe1dJ
TENNECO POLYMERS, INC
(COMPANY)
TO: FOR: FROM: RE:
F. Koslosky R. R. Neugold HIGHLIGHTS OF MARCH - 1985
INTEROFFICE COMMUNICATION
DATE: April 2, 1985
CC: H. R. Bowers G. E. Disch D. M. Hersh W. Miringoff C, Tabata
I. SAFETY
Month
Y-T-D
Goal Total Year
Incidence Rate Y-T-D
Incidence Goal
First Aids
0 4 24 6.3
Minor
00
20
RWA
23
4 4.7
Lost Time
00
10
Total Recordables
2
3
7 4.7
9.3 .8
1.6 0.4 2.7
Goals are based on: Total man-hours for March, 1985 Total man-hours YTD: Last lost time injury occurred on: Total man-hours since last lost time injury: Total days since last lost time injury:
516,000 man-hours in 1985 41,649
126,978 3/2/84
519,869 394
1. The Compound Area suffered a RWA accident when a mixer operator slipped on a plasticizer wet spot on the floor and struck his head,
2. The Resin Dispersion Area suffered a RWA accident when a GSO twisted his ankle when descending from the palletizing area to the bagging area.
3. The Plant Safety Council met on 3/20/85.
4. The monthly safety topics were: the Lead Standard 1910,1025 in the Compound Area and auto seat belt safety in the Resin Area.
5. The Labor/Management safety tours were conducted on 3/7/85 in Resin and 3/28/85 in Compound.
TEN-FLEM 20010
F. Koslosky
Page 2 April 2, 1985
II. STATISTICS
A. Burlington Site - Attachment I B. Burlington Site Production Loss Report - Attachment II C. Burlington Site Quality - Attachment III D. Burlington Site Headcount - Attachment IV
III. PERSONNEL
1. A third step grievance and communications meeting was held with Compound on 3/8/85, with no unusual developments.
2. The Union President for Compound resigned his office effective 3/29/85, and Mr. R. Smigocki was appointed to replace him.
3. A third step Resin Union Committee meeting was held on 3/14/85. A total of five (5) grievances relating to overtime assignment, overtime pay, and vacation work schedules were heard.
4. A total of 42 employees volunteered for the 1985 Tenneco Polymers Red Cross Blood Drive.
5. Discussions were held with both Union Committees to update overtime procedures.
6. Mr. Harris visited the Houston office to discuss salaried and-hourly benefit plans.
7. GRIEVANCES
Month
Year-To-Date
Resin Compound
37 47
IV. COSTS
The March costs were impacted by self-imposed production restrictions to adjust downward Dispersion and Compound inventories.
1. Suspension resin had a variable cost of $0.0012/lb. less than the budget at $0.0515 Fixed costs were $30M above budget at $519M,
2. Dispersion resin had a variable cost of $0.0053/lb. above budget at $0.0937/lb. Fixed costs were $36M above budget at $539M.
3. Compound variable cost was $0.0028/lb. more than budget at $0.1848/lb. Fixed costs were $1M under budget at $422M.
TEN 4711
F. Koslosky Page 3 April 2, 1985
V. MAJOR PROJECTS AND ON-GOING PROGRAMS
1. A Homopolymer reactor replacement start-up planning meeting was held on 3/21/85 to indoctrinate supervision on the equipment modification and the operating plan.
2. An initial meeting with PSE&G was held to determine PSE&G costs to deliver gas purchased outside of New Jersey to the Burlington Plant. Their proposed tariff is being evaluated.
3. The 10MM lb. slurry magnet operation was improved by enlarging the drain line size to lh" with a resultant improvement in the visual contamination.
4. A failure in the phenol add system to the copolymer final condensers #1 and #2 resulted in pluggage due to lack of inhibitor. Now back to normal,
5. Dispersion ran "B" Plant only the last seven (7) days of March to limit inventory and minimize overtime for absentee coverage.
6. Experienced four (4) seal failures on blending resin reactors.
7. A reduction in batch size of Methocel copolymer has been successful in eliminating rupture disk port pluggage problems.
VI. CAPITAL PROJECTS
1. The reactor replacement pipe and electrical work is proceeding. The three (3) specially inspected reactors should arrive in April. Looking for completion of project late in June.
2. The sludge dewatering piping and electrical work is well underway. Looking for early May start-up.
3. Spill containment and well water project now anticipating April completion for use on both.
4. The tower top entry cleaning is being tested. Looking for final completion in April.
VII. ENVIRONMENTAL
1. R. F. Weston completed the treatability study for ammonia. Anticipate receipt of final report in April.
2. The VCM spill alarm was activated on 3/7/85 when pluggage in the "A" homo system caused a minor discharge from the pipeline to the tower being charged. There was no personnel exposure.
3. The VCM spill alarm sounded on 3/8/85 when a rupture disk and relief valve operated at an apparently normal operating condition. There was no exposure. NJDEP was advised.
TEN 4712
F. Koslosky Page 4 April 2, 1985
4. Effluent treatment water data available indicates full compliance. 5. The landfill operation of sludge and dragout was terminated on
3/15/85. Still searching for landfill or incinerator capability for solids being generated. 6. All NESHAP sampling was in compliance. 7. Mr. Kanzler inspected the Keystone Cement operation in Bethlehem, Pa., to review their equipment and practice for thermal destruction of flammable hazardous waste. 8. A NJDEP Hazardous Waste inspector contacted the plant on 3/29/85 in response to a neighbor's complaint re two drums. They were empty and near well #10. VIII. OPPORTUNITIES 1. The Compound Plant continues to operate at better than standard production volume throughput levels. 2. American Metal Moulding, a Compound customer, entertained key plant staff to display their pleasure with our attention to their business. 3. The Quality Strategy workshop should benefit the plant with better customer acceptance where needed at better cost performance. IX. VULNERABILITIES 1. The plant is still searching for a disposal site for our waste treatment plant sludge. 2. The Conrail performance is still below par with weekly missed cars and missed drills. 3. The plant is still experiencing more than historical long-term absences in the Resin Area. The trend appears to be improving, however. X. INDUSTRY TRENDS 1. CBS is relatively unchanged.
TEN 4713
F. Koslosky
Page 5 April 2, 1985
XI. GENERAL
1. On 3/25/85, the writer gave initial pretrial deposition in the Ferrara vs Tenneco Chemicals suit.
2. The plant was designated by the N.J. State Safety Council for an Industry Award for its 1984 performance.
3. Mr. Wunder and the writer met with Mr. Walt Corter, Burlington Township Public Safety Director, and Mr. Bob Ent, Deputy Fire Chief, as required by RCRA. We plan to have a fire department familiarization plant tour in May.
RRN:pjd Attchs.
R. R. Neugold
TEN 4714
HIGHLIGHTS OF MARCH, 1985
II. STATISTICS
PRODUCTION (M LBS.)
MONTH
ACTUAL
BUDGET
YEAR-TO-DATE
ACTUAL
BUDGET
Combined Suspension *Variable Cost Est. Fixed Cost Est. Conversion Cost Est.
M Lbs.
($/lb.) ( $M ) ($ / lb.)
4.925 0.0515 519.0 0.1465
4.700 0.0527 489.0 0.1499
13.951 0.0529
1425.0 0.1428
13.400 0.0527
1466.0 0.1499
Copolymer *Variable Cost Est. Fixed Cost Est. Conversion Cost Est.
M Lbs.
($/lb.) ( $M ) ($/lb.)
3.791 0.0486 383.0 0.1383
3.100 0.0504 332.0 0.1430
11.120 0.0499
1078.0 0.1348
9.200 0.0504 995.0 0.1430
Blending Resin ^Variable Cost Est. Fixed Cost Est. Conversion Cost Est.
M Lbs. ($/lb.) ( $M ) (S/lb.)
1.134 0.0638 136.0 0.1815
1.600 0.0586 157.0
0.1678
2.831 0.0655 347.0 0.1769
4.200 0.0586 471.0 0.1678
Dispersion *Variable Cost Est. Fixed Cost Est. Conversion Cost Est.
M Lbs. ($/lb.) ( $M ) (S/lb.)
3.312 0.0937
539.0 0.2279
3.250 0.0884 503.2 0.2068
9.779 0.0916 1531.0 0.2167
9.750 0.0884 1509.5 0.2068
Compound *Variable Cost Est. Fixed Cost Est. Conversion Cost Est.
M Lbs. ($/lb.) ( $M ) (S/lb.)
9.147 0.1848 422.0 0.0559
8.333 0.1820 423.0 0.0623
28.286 0.1758
1183.0 0.0521
24.999 0.1820
1269.0 0.0623
EFFICIENCY (%) (Std. Product)
Copolymer Blending Resin Dispersion Compound
98.0 96.8 97.9 97.8
97.9 96.8 97.6 97.6
97.9 96.8 97.5 97.8
97.9 96.8 97.6 97.6
RFT & NON-OFFGRADE (% Total Production)
NEXT MONTH EST.
4.700 0.048( 519.0 0.147:
3.700 0.045^ 385.0 0.139(
1.000 o.06i: 134.0 0.182`
2.200 0.108( 495.0 0.300
8.800 0.184 419.0 0.056
97.9 96.8 97.5 97.7
Copolymer RFT NOG
Blending Resin RFT NOG
Dispersion RFT NOG
Compound RFT NOG
97.1 100.0
100.0 100.0
95.5 99.8
99.1 99.5
96.1 100.0
99.6 99.8
92.5 99.1
99.0 99.2
95.0 100.0
95.0 100.0
95.0 99.0
99.0 99.5
*Excludes VCM, VAM, and Resins
TEN 4715
HIGHLIGHTS OF MARCH, 1985
MONTH
ACTUAL
BUDGET
YEAR--TO-DATE
ACTUAL
BUDGET
NEXT MONTH EST.
SITE OVERTIME (%)
Total Overtime (%) Controllable O.T. (%)
8.6 10.8
8.3 10.0
9.8 10.0
9.0
REACTOR UTILIZATION (%) Suspension Area Dispersion Area
CM UTILIZATION (%)
Compound Area Line #1 Line #2
SHIPMENTS (M LBS.)
Copolymer Blending Resin Dispersion Compound
86.2 75.1
84.0 79.8
85.3 71.7
84.0 79.8
85.0 74.0
92.3 92.0
2.272 1.308 3.659 9.245
82.0 84.0
3.083 1.250 3.250 8.333
89.8 88.5
8.462 2.818 9.408 28.260
82.0 84.0
88.0 86.0 -
TAILINGS/SWEEPS SHIPMENTS (M LBS.)
Copolymer Blending Resin Dispersion Compound
0.022 0.053 0 0
0.066 0.102 0.038 0
ENDING INVENTORY (M LBS.)
Copolymer Blending Resin Dispersion Compound
3.525 0.963
1.989 5.962
CHANGE +1.519 -0.159 -0.311 +0.255
TEN 4716
HIGHLIGHTS OF MARCH, 1985
II. STATISTICS - SUSPENSION Reactor Capacity (100% fastest product, 100% stream time) Product Mix Penalty Reactor Capacity at Actual Mix Actual Monthly Production Reactor Capacity Efficiency (Actual Mix)
Reasons for Production Losses Lost 4 blending resin seals
ATTACHMENT II M LBS,
5.390 0.436 4.954 4.925 99.4%
'
0.029
STATISTICS - DISPERSION
Reactor Capacity (100% fastest product, 100% stream time) Product Mix Penalty Reactor Capacity at Actual Mix Actual Monthly Production Reactor Capacity Efficiency (Actual Mix)
Reasons for Production Losses Intentional production curtailment to adjust high finished product inventories
STATISTICS - COMPOUND
CM Capacity (100% fastest product, 100% stream time) Product Mix Penalty CM Capacity at Actual Mix Actual Monthly Production CM Capacity Efficiency (Actual Mix)
Reasons for Production Losses
3.714 0.068 3.646 3.312 90.8%
0.387
8.911 0.419 8.492 9.147 107.7%
N/A
TEN 4717
HIGHLIGHTS OF MARCH, 1985
ATTACHMENT III
STATISTICS
Area Suspension
Copolymer Blending Resin
M Lbs E-Grade
110.50
110.50
0.00
QUALITY
M Lbs Off-Grade
% RFT
0.00
97.74
0.00
97.06
0.00
100.00
% NOG
100.00
100.00
100.00
Dispersion
148.50
6.75
95.52
99.80
Compound Rigids Flexibles Records
77.64 32.99 15.85 28.80
51.76 35.91
1.85 14.00
99.14 98.90 99.61 98.54
99.46 98.82 99.96 99.38
Reasons for Off-Grade: Resin: Dispersion: high Severs
Compound:
Rigids
- Color, haze, contamination.
Flexibles - Color
Record
Purge,, Melt Index
TEN 4718
HIGHLIGHTS OF MARCH, 1985
HEADCOUNT BURLINGTON SITE
1985
BUDGET
1985 APPROVED
RESIN AREA
Exempt
33 32
Non-Exempt
15 15
Hourly
112 112
Sub-Totals 160 159
COMPOUND AREA
Exemp t
99
Non-Exempt Hourly
00 66 66
Sub-Totals 75 75 PERSONNEL
Exempt Non-Exempt
11 22
Sub-Totals 3 3
ACCOUNTING Exempt Non-Exempt Sub-Totals
22 11 33
TOTALS
241
*Includes 5 employees on long-term disability of up to three months.
240
ATTACHMENT IV
ACTUAL
32 15 113* 160
9 0 65 74
1 2 3
2 1 3 240
TEN 4719