Document rx6rxgMOeNOO1mm8qXZ362GEV

DownloadRandom document
Message From: Sent: To: Subject: AirAction [/O=EXCHANGELABS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBO HF23SPDLT)/CN =RECIPIENTS/CN -FA78B98923384078995E04A73D258D83-AlRACTION] 4/1/2025 9:05:41 PM Tillotson, Elizabeth [Elizabeth.Tillotson@graniteshorepower.com] CORRECTION: Updated email address for CBI related to the Presidential Exemption In the previous email, an incorrect email address was provided for the submission of electronic Confidential Business Information (CBI). The email address should be: f-} '` Thank you. From: AirAction Sent: Tuesday, April 1, 2025 9:42 AM To: Tillotson, Elizabeth <Elizabeth.Tillotson@graniteshorepower.com> Subject: RE: Presidential Exemption: National Emission Standards for Hazardous Air Pollutants [MATS RTR]: Merrimack Staton EIA Plant Code #2364 Thank you for emailing the AirAction mailbox to request a Presidential Exemption under section 1 12(i)(4) of the Clean Air Act and for engaging with EPA in advancing President Trump's Executive Orders and Powering the Great American Comeback. We have received your email and will be in contact soon. If you have Confidential Business Information (CBI) that you'd like to submit, please submit it in electronic version to the 131 inbox or in hardcopy to: USEPA, OAQPS CORE CBI Office 4930 Old Page Road Durham, SIC 27703 From: Tillotson, Elizabeth <1 I I, Sent: Monday, March 31, 2025 7:13 PM To: AirAction Subject: Presidential Exemption: National Emission Standards for Hazardous Air Pollutants [MATS RTR]: Merrimack Staton EIA Plant Code #2364 Caution: This email originated from outside EPA, please exercise additional caution when deciding whether to open attachments or click on provided links. I Please accept the attached letter on behalf of GSP Merrimack LLC ("GSP") requesting a Presidential exemption under Section 1 12(i)(4) of the Clean Air Act ("CAA") from compliance with the revised filterable particulate matter ("1PM") surrogate emission standard for non-mercury metal hazardous air pollutants ("HAP") and the requirement to install and use a particulate matter continuous emissions monitoring system ("GEMS" or "PM GEMS") promulgated in the rule, commonly referred to as the MATS RTR, for the two coal-fired electric generating units ("EGUs") at Merrimack Station in Bow, New Hampshire. If you have any questions regarding this submittal, please contact Elizabeth Tillotson at Thank you. Sierra Club FOIA 2025-EPA-04883 ED_018388_00005584-00001 SC_EVERSPLIT0020796 Fli7aboth Tillotson Vice President Granite Shorc Power 431 River Road Bou. Nfl 03304 Officc 603.230.7%8 Sierra Club FOIA 2025-EPA-04883 ED_018388_00005584-00002 SC_EVERSPLIT0020797