Document rx5eKKXNGnbQ7Vvxj0GKpJOXV
f'onsanto
"`'t
........ . TO
:
pcr> iv.-' m? --
femi g. Hodges - E1SF General Offices__________________________
June 1, 1972
EPA POLICY ON PCB's PBH, 4/28/72 "PCB's Allowable Discharge Prom Pro duclng/Uslng Plants"
D. B. Hosmer
J. R. SavageB2SL rw. B."Papageorge
R. J. Kozacka
E1SP F4WA
O. L. Bratsch
A. E. Leisy P. E. Heisler O. A. Hlppe R. M. Blowers C. P. Buckley
W. C. Engman E. E. Stewart
R. M. McCutchan P. J. Holzapfel
In conjunction with the report "Polychlorinated Biphenyls and the Environment" recently released by the federal "Task Force on PCB's", EPA has sent guidelines to the regional offices stating policy on discharges of PCB's from manufacturers/users. Bill Papageorge obtained a copy of these guidelines and they are attached for your use. Please use them with discretion as they are not documents for the general public.
In general, these guidelines fit our expectations from the conference in Washington 4/13/72 (see reference minutes of that conference). Critical points:
(1) Water quality limit of 0.01 ppb - not to be monitored directly, but to be based on fish studies if water is less than 0.01 ppb, fish will not exceed 5 ppm.
(2) Allowable discharges - policy is stepwise re duction to no "knowing" discharge. From a more practical standpoint, discharges will be limited to that amount which will not result in more than 0.01 ppb in the stream at mean annual flow, assuming complete mixing. Effects of background levels relative to this discharge limit are not discussed, so we don't know whether or not we can discharge the full allowance for the Mississippi River (9.7#/day @ 180,000 cu ft/scc). In the 4/13/72 Washington meeting, EPA had indi cated that about 2-4#/day appeared reasonable from us.
MONS 098255
-2-
(3) Effects of previous discharges of PCB's to the environment are recognized along with acknow ledgment that considerable time will be Involved in the diminution of these effects.
Strategy for dealing with federal authorities in the near future (and probably Illinois authorities later) needs to be developed. We suggest that the WGK Plant arrange for a meeting at which this strategy can be discussed.
/ms Att.
Paul B. Hodges
NONS 093256