Recommended Code of Practice for the
Handling and Disposal of Asbestos Waste Materials
Introduction
When the new Asbestos Regulations come into force in May 1970 the protection of
ae workers from industrial disease which might arise from the inhalation of asbestos dust will become a statutory obligation wherever asbestos materials are used in such a way as to give rise to the emission of dust dangerous to the health of employees It is also important that the general public should not inadvertently be exposed to risk such as might anse through the indiscriminate or uncontrolled dumping of asbestos waste materials
The Asbestosis Research Council has given careful consideration to the problems of the collection of waste asbestos material in accordance with the requirements of the new Regulations and its disposal in such a manner that it will not constitute a zisk to the health of the general public This Code of Practice has been drawn up as a result and is recommended in the belief that it will assist those concerned with satisfying both of these requirements
I Types of Asbestos
Generally speaking asbestos waste falls into the following categories 1 Fine dust
2 Loose fibre swarf small cuts floor sweepings etc.
3 Waste material from fixing or stripping of insulating materials
-
-
containing asbestos
4 Offcuts broken pieces and reject material from friable
materials
oe RARES
s
5 Offcuts broken pieces and reject material from high density
products such as asbestos cement moulded plastic materials
_ING
.ctc
#
6 Empty sacks or bags which have contained loose asbestos fibre or mixtures containing loose asbestos fibre
PART I
2 Collection of Waste
2.1 Fine dust
Fine dust is normally produced by sanding or machining operations and the dust is collected by fixed extraction systems The air is filtered and the dust collected in hoppers which are normally fitted with bagging outlets These outlets should be designed to make bag changing changing easy and dust leakage minunal A useful design is a
beaded circular outlet fitted with a strong circular rubber
ring A bag is fitted to the outlet and the ring rolled down to secure the neck of the bag No damper is used thus eliminating one of the most comnion sources of leakage Polyethylene bags of adequate
strength for good handling are recommended so that the dust level
can be seen and the bag changed before it is filled
When filled the bags should be sealed so as to prevent the escape of dust during subsequent handling Polyethylene sacks should be twisted tightly folded over and the neck secured in the folded position by wire tie adhesive tape or other equally effective method Paper sacks should be folded over twice and stapled along the folded edge
Approved respirators and suitable protective clothing must be worn
when changing bags on a dust collector In some cases the dust is removed by wet collectors The resultant slurry is dealt with as detailed in g.1 below
2.2 Loose fibre swarf small offcuts floor sweepings etc.
Loose fibre is often handled by fixed extraction systems and filter units in the same way as fine dust It however more usual for
swarf to accumulate around and under machines and on floors
Cleaning around machines and the collection of swarf should be carried out in accordance with the requirements of Part III of the Asbestos Regulations 1969
Where vacuum cleaners are used they should be fitted with disposable paper bags rather than fabric dust bags which would require emptying Information and recommendations concerning machines conforming to these requirements can be provided on request Loose material collected by other incans should be placed in impermeable bags and sealed as in 2.1
200 gauge polyethylene dauble at bottom has been found satisfactory
2.3 2.3 Waste materials from fixing or stripping of insulating 2.3 materials containing asbestos Waste material from fixing orstripping operations can be conveniently collected on polyethylene sheeting which is subsequently folded to form a sealed container Where such material has been allowed to
fall on floors it should be thoroughly damped before sweeping up and the damped material should be placed in impermeable bags or other disposable receptacles and sealed as in 2.1
Offcuts broken peices and rejects offriable material The variety of shapes and sizes of offcuts rejects etc. encountered in different factories calls for collection and disposal methods designed to suit individual situations Wherever possible provision should be made in the design of machines for the automatic removal of offcuts cte and their collection in disposable receptacles which can be
removed and scaled as described in 2.1
When automatic removal and collection is impracticable suitable receptacles must be provided Attention should be given to the following requirements
a Receptacles must be capable of being closed so as to prevent
the escape of dust
b If during use dust arises from the mouth of the receptacle a dust extraction hood should be provided to prevent the uncontrolled escape of dust into the work place
c The supply of receptacles should be sufficient to prevent filling and to be conveniently available to the work
place
,
i
\
d Regular removal of full receptacles and replacement by
empty ones should be arranged
Offcuts and rejects may sometinies need to be broken down to a more convenient size for collection Wherever possible this should be
done mechanically with adequately ventilated equipment When this is not possible methuds should be devised to reduce the creation of dust as far as possible for example by weung the work should be performed in an arca from which asbestos dust cannot escape to other working areas and employees engaged in the work must be
issued with approved respirators and protective clothing
3
2.5 Offcuts broken pieces and rejects from high density materials such as asbestos cement moulded plastic materials vic Waste material of this kind does not normally normally give rise to the emission of dangerous dust and in such cases need not be placed in special receptacles Where such material is kept separate from other
asbestos waste it may be stored in a suitable area to await uansport
and disposal as detailed in section 3 of this code
Empty sacks or bags
Sacks or bags which have contained loose asbestos fibre or mixtures including loose asbestos fibre should be deposited in a suitable receptacle sec 2.4 above immediately after being emptied For disposal the sacks or bags should be bundled under a dust extraction hood and then sealed in an impermeable bag as in 2.1 above
PART
oT
This part of the code which deals with the final disposal of asbestos waste has been agreed with the Government Departments having general responsibilities for environmental health in England Wales Scotland and Northern Ireland Copies of the code have been sent to all local
authorities
3 Disposal of Tipping Practice
3.1 Asbestos waste whether loose or in scaled bags or other sealed receptacles should be disposed of in such a way that no dust is emitted into the air during mansport or in the act of tipping or
subsequently Where the waste is derived from blue asbestos the receptacles containing it should be clearly marked to show this
Waste which is adequately contained in impermeable bags or other suitably sealed receptacles does not require special transport
Special containers can be obtained which when filled are removed by specially fitted road vehicles direct to a disposal tip Whatever
type of container is used steps should be taken to prevent emission of dust from containers when in use
Wet waste should be transported to the disposal area in sludge
tankers or similar vehicles After use all vehicles and containcis
should be cleared of loose fibre or dust by vacuum cleaning or other
dustless method
3.2 In the event of accidental spillage for example as the result aof road
accident during transport to the tipping site the action to be taken will depend on the type of waste involved and the extent of the spillage Where the amount of spilled material is small the waste should be collected into its original receptacle and reloaded by the vehicle driver without delay
In the event of substantial spillage it may be necessary to seek assistance and certain precantions will need to be taken Should the material be dusty it should be contained as quickly as possible by covering covering De wetting both The spilled material should be removed as quickly as possible safety precautions being observed according to the nature of the waste and only those persons directly concerned with the removal permitted in the working area The local authority public health inspector's office should be promptly notified of the
occurrence and of the measures taken for recovery
5
Written instructions on the action to be taken in the event of acci-
dental spillage should be issued to drivers of vehicles used for canying
asbestos waste
3.3 3.3 The waste should be deposited at a tipping site where as is normal for the controlled tipping of solid waste there is vehicular access to the tipping face so that the waste can be deposited at the face itself To avoid the risk of receptacles breaking and dust dispersal velueles used for transporting the waste should have a low discharge point in relation to the ground
Whenever practicable the waste should be deposted at the foot of the tip face itself so as to minimise the need for fitlur disturbance of the waste the tip is formed and so as to facilitate coverage with other suitable dry waste if such is also tipped see 3 5 below Where this is not practicable and the waste has to be deposited over the tip have that and any subsequent further movement of the waste in formation of the tip should be done with care to avoid spillage from receptacles The depth of the tip face should not exceed six feet
All waste deposited should be covered with at least 9 ins of consolidated earth or other suitable material capable of forming a seal to prevent subsequent interference and dispersal of dust Where other dry wastes are disposed of at the same site those wastes may well include materials which can be used to provide the required cover Covering should be done promptly immediately in the case of waste derived from blue asbestos and no waste should be left uncovered at the end of a working day
3.6 The disposal of wet waste on a dry waste tip is acceptable provided that the quantities are not excessive It should be remembered that even if waste is wet when tipped it must still be covered so that dust
cannot escape from the dried out material material Where there is a lage
quantity of wet waste for disposal it may be necessary to make special arrangements in consultation with the local authority
Exceptional local circumstances may make it acceptable to dispose of ashesto waste at He where the parcations given in paragraphs 3.3-3.6 above are not applicable applicable such cavas the detailed detailed an ungements disposal should be agreed with appropriate local authority authority see 5.3 below those anangements must of course be such as to avoid the emission of dust into the air during the act of tipping and subsequently Special considerations which apply only to the disposal
6
ene of waste from high density materials such as asbestos cement are set
out in paragraph 3.8 which follows
Whilst it is accepted that waste from high density materials such as asbestos cement moulded plastic materials etc. is not likely to produce a dust hazard when tipped a hazard may arise subsequently if the waste is subjected to pounding by veindes passing over it In general therefore the methods of disposal described above should also be adopted for this type of waste although the requirement for
daily covering may be unsp issed with Nevertheless the waste should always be covered as soon as practicable practicable High density density waste of dus kind may be disposed of also in wet pits so long as at all times there is sullicient water to cover any waste deposited
Note Disposal into wet pits is NOT generally suitable for other forms of asbestos waste although exceptional circumstances might make this method acceptable 3.7 above
4 Waste Disposal Contractors
4.1 Where a firm itself disposes of its asbestos waste written instructions based on this code of practice should be issued to the staff concerned If waste disposal contractor is employed employed the relevant terms of this code of practice should be incorporated in the contract with the disposal contractor
4.2 As all contractors do not have direct management of the tips they use for disposal of wastes it is important that the firm's contract should cover responsibility of the contractor for ensuring that the recommended precautions at the tip are observed Additionally the firm
that
should cany out periodic checks to ensure that the recommended system of disposal is being followed
5 Contact with Local Authorities 5.1 Except where the waste is collected by a local authority all firms producing asbestos waste should notify the appropriate local authority see paragraph 5/5 below of their exiding aitangements for disposing of the waste Notification should be in writing and should state the location of the site on sites being used the type of waste being tipped and the name and address of any waste disposal contractor employed
-
-
The firm should arrange consultation with the appropriate local
5.2
whenever it is proposed to change any arrangements for
authority
have been settled settled the
the disposal of waste When new arrangements
local
firm should send a written notification to the appropriate
authority as paragraph 5.1 above
than Greater London in Wales and in Northern
In England other
in this matter will be the
Ireland the appropriate local authority
county borough council borough council urban idsisdtiriscptosceoduncoifl Ionr
rural district council in whose area the waste
Greater London the appropriate authority will be a London borough
Council of the City of London In Scotland
council or the Common
council
the appropriate authority will be a town council or a county
to a London borough council
Note A copy of any notification sent
since that
should be sent to the Greater London Council
Council is responsible for refuse disposal in London
September 1969 1969
The Asbestosis Research Council
Secretary to the Council Dr. S. Holmes
P.O. Box 10
Rochdale Lancashire Tel 0706 47422
Environmental Control Committee
Secretary 114 Park Street
London WTY 4AB Tel 01 499 6022