Document rpypKoYN3obON19amnnKaXZd0

BIBLEfREylEW - November 8, 1966 In'our review of 1966 performance, and plans for 1967, we will include the principal Profit Improvement projects, but not necessarily all of them. Some of our objectives, for instance Safety, and in some departments Anti-Pollution programs, are not part of our Profit Improvement Program but we believe they are an important part of our objectives. The acetylene complex this year is operating under a dif ferent situation because of the serious decrease in AN demand. This situation has affected not only the Texas City AN plant, but because of C2H2 distribution has had an effect on all the C2H2 users and so has influenced our plans. Our two vinyl monomer plants which we are going to cover first, are each having a record year in 1966, but each has its own special problems. Vinyl acetate is a sold out plant and we expect to buy 40-50 M pounds of vinyl acetate this year in order to meet the demand. Since our incre mental manufacturing cost for vinyl acetate is about 6^ per pound, and we are paying about ll*yf per pound for purchased VAM we have a big incentive to produce more pounds of vinyl acetate. So this is the direction of our objectives. CSY 1110662 The vinyl acetate plant has also been a victim of the AN de mand cut because of the new acetylene distribution that has re sulted. We no longer expect to be purchasing acetylene from Carbide and we will be operating the vinyl chloride reaction step at maximum rates. Both of these operating changes result in RSV0032739 k t i '\ l 2- - a lower available acetylene pressure in the inlet to the vinyl ^ acetate plant. This decreases the amount of acetylene that we can get into the vinyl acetate plant and decreases our vinyl acetate make. Unless we can do something about increasing the amount of acetylene that we can get to vinyl acetate, our production in 1967 will only be about 56 M pounds versus a 60 M pound budget. So we do have plans to correct this situation. We expect to produce about 155 M pounds of VCM and this will just about balance the VCM demand as we now understand it. To do this we plan to operate HCI-C2H2 route to VCM at maximum rates and shut down our oxidative process. Because of reduced refrigera tion demand with oxidative shutdown, we believe we can produce about 5 M pounds more VCM and reduce our manufacturing costs. This also results in some problems since we have not run the test on the oxidative process with the higher oxygen concentration, and this process, once proved, is believed to have some commercial value. The alternate of operating versus not operating the oxidative unit has to be evaluated and a decision made as to which direction we want to go. Meanwhile, our plans and numbers you see are based on shutting down the oxidative unit. Ray Rosenberg will discuss operating objectives first, then Tom Shirley will go over the PT&E objectives, and finally Carl Duhon will cover maintenance goals and objectives. CBY 1118663 RSV0032740 %b A We will now hear from the rest of our acetylene complex. The two products, AN and methanol, are operating under opposite situations. The AN plant, of course, is cut way back so we must look at reducing costs in any way we can. This situation has been a prime influence on our objectives for 1967. The methanol plant, however, is another sold out plant and even though we expect to pick up an additional 12.5 M gallons of methanol as a result of becoming sole owners of the methanol plant in March, we still expect to purchase at least 10 m gallons in order to meet demand as we now know it. Methanol plant's main goals, because of their very low incremental manufacturing cost and be cause of high demand, are therefore aimed at producing more gallons of methanol. Oxygen and acetylene, the mother and father of our entire acetylene complex, although they did not fully achieve their goals in 1966, did achieve substantial savings and I believe over the years have shown more dollar improvement and cost re duction than any other of our plants, and 1967 will be no exception t0 thlS' CBY 1118664 In order of their appearance, but not necessarily their importance, we will cover the oxygen-acetylene plants first, then the methanol plant, and finally the AN plant. In each case we will first discuss operations objectives and then PT&E objectives, and finally, Andy Kuehl will cover maintenance goals and objectives for the whole group of plants. Art Simons will start with the oxygen-acetylene plant. RSV0032741 VCM / % C PF/yFormance 1167 GOALS CBY ma665 T}SV0(m742 i Safety /? ' ft 7 GOAL AcrCfl**Otf) goal A4/A/CJf IA/J, /?ATt TWSSmM A4AUU0VPJ /G S~ A/f/AYOX /SsXtOUS Pa770 *A 3/7 V/ 2TC> 8/, D/SABI/A/ -Z*sj u/r y E'/A&j S Pi Ld~J o/ o a (3 o /O RiAivr Ma.*j //ousstSSTsa/g jDusp. AA AA PX>6*AA* _Z/VrLUOS S+rSTY /v ^oS P*Aa/*S/as& f' sntSCvT/o*/ Aa/AlVZS /#C/*f*TS TO 0TTT*A#orJF /T P*TTT*as SXtrT** PpPAfAL SAF~Ty J*f<r7?'A'&X QViPMA*7~ /A ?A HJSP7~/oass SAT* tv WtSMSasT CtffCtrS Quality all oPmsatosb cat a aS/a/wu** t>y 3 ucas UPOA T~ OPfJfAT/A'YL ASajVUAL. AA CBY 1118666 RSV0032743 CAPACrry : MM LBS / rac Dspt- Djtpt- 2.3 7~t?u- Z VCM F&oMt C* M- /><?>*/ 3 DC Total ity & 30 /to / fo 'fY Ac.7~ 20 /to /<BO 27 / /tr 37 / 03 /*-S~ cay 1118667 RSV0032744 Cost Raw Materials Other Direct XwOlRECTS Total , *VLe 6109A66L 3.35 01..23.3+ 5+2 nAecet. +.// 01..3233 S'. 67 Resume, of 1166 Cost Sav/a/gs /, Lower CU cost rsiq ooo z. Lowe* CzH* cost / 32, OOO 3. +. 5. 6. Lowe* Deer 26 catalyst- cost Reddeep Lab costs SRteadbu/lc/ezdat/Toaa/r oMe RaRroed. cpoAL/ry /HS,G,(OoOo (,0,600 ys.ooo 2 ^ ooo / 62, 060 so, ooo / 2^000 ! 2,00 0 Ef, 60 6 7 RuMP/ATE MaO# scrub / REDUCE SO. USAGE' 38. OOO ) 7, too a 9 Reduce Ae/o Mare ToRttAaClTtOUSaCaut/.a/UoSsAGE _* 48 96, 6 00 / 5477, oooooo *744, 060 * Ver iw ome/f/At. J944 goal. 1118668 RSV0032745 VCM 1967 GOALS CAPACITY 4 COS7S V C A f P/?oi>ucr/oA/, m m U s /v * U /s /r CosT; ^ / u Voi UM, MMU, 89 Cost, */u 6.72 y EAR ff /36 6.S2 .9/ /J? 6.49 /24 C.so /34 e./z /+$ (/JS-) ~.67 (**) CBY 1118669 RSV0032746 P/tObuce /SS-MMU* VCM F/t*M CfrAc*-/#o /?*** /?r*cTs**/ 93 S7 .A c /. ? y/ &y : '> A/7"/> C> <T~i //. /) -/*?' 7^A"' Costs /w*" Mattr/au O TMMK bt/rs* Tj- -ZTVa/^-ffVTV 7* 7***. /f ^ ^ A C T. A, / / /. 23 0. 23 67 / fc 7 <3 CAU j, 30 O. *5" Q.2LST *57 O O CAY 1118670 RSV0032747 COST GOAL TO BE ACCOMPl/Se/eD BV TM 0110 U//NO SAV/M6S I1L7 Goal. COST SAVING ITMS TNUOPEfiSN goal OS S'*/LB ~' ' ''W WMIMLW I --- /. Lo\A/ER Ctl M- COST 2. Lower C./x Cost' 3. Lower Cx. tff cost f. Lowe* Ma/a/t: COST Uru.iZAT/0# c>t CU ^ S 7,006 2 f&, Goo / 2-/y qco / 72,000 / Co ooo ` & OS oo- COST SAV///G ITEMS NOT IN OoAL 6 OPTIMIZE DC C.RAtPtA/6 OiAKCtd * 25,000 7 Opt/mizs catalyst i/sa&e'Uove) so, ooo 8. TMPAovS VCM y/Lt> (JUt/E) 40,000 T t >51 OOO Total sav/hos * 9^3 ooo CBV U18671 RSV0032748 Quality Duplicate HGC peffohmamce os ^8% SPEC. GRADE PPOQUCTloH Accomplish by / Close opsfat/ohs comtpol C. PT*TT srvotes on ahal-YT/oal Methods- sop cohtpol CB* *118672 RSV0032749 VAM /psppopma/c^- ' H7 <3>op^s CBy 1118673 RSV0032750 Safety / & O AL C AltCWU OCT) / to 7 Mt*o* T/VJ RATE' JtJJS/MM HAwvPS / /> /SEP/coj /?AT/0 8/, 23-? 'V, / /a a// D/SABAJM& JTASJt/Xy f/RE* Spyu-e O > O Plavt M&*j //0(,ssArdrY/A> J5*r AA- E * AA/A/UAi. Htt/SStreep/AS*. A*/A*a ID O O K E -O C O E~ PffO&fiAAf JTA/Ct-tsOE~ SAFETY X/iS AU. JOE PLAA/A/fA/<i / EKSCU TfOA/ A A/AL YZ JTA'C/edTA'T* T~0 OETEGPf/VE /F pATTEpA/ EX/S7-J PmtHAL / Z#s?o*//Ai. Safety Meet/a/as Vpi>ArE- Orseat/as& Y/aa/fal. UP&4TC "Oa/ Oku. ' /*Saasi/al. S A FTy STpvtPAtsAsr CAYEctes CBY U18674 RSV0032751 Capacity ' mm lbs /9 Lt 6b>Al S7.6 /t&6 4ct C+,0 COSTS f?A* MaT8/AS J-A/&/JPSCT* if* C . &e> At- 6,33 /. /*-- . 7/ <s. /? J?L C Act .* /. 30 <6? 2+7 CBV 1L18675 RSV0032752 VAM Capacity ^EPNO S UPON AcETY.A/^ >/STRfMOT/o^/ AcbtY^n- D/str/bvrtt>*r Purchases VCA/7 Osaojt / 9 Co > Max M/a/ /7 O O A/1A* VAM Equivalent b/?OM /-/&ADRR Prom VC/W ArrA Total VAM SO M ISM 65 M "t-SOM / 1.2 M S>2M CBY 1118676 RSV0032753 Capacity Goals A Produce 63.6 MM Lbs in /9&7 2. INCREASE CAPABILITIES EEOasJ SB. 2 to 7S MM Lb/yr rate- Accompl/s/y by /. Cap/taL ADD/T/oa/s --*36^ Ooo O. Sc Seoul e SB. 2 T& B2-0 Mfi* L&SYR RATE ( JAM. 'B7) RTSS Pit E. GZO TO e+.O MM LB AYR RATE (APRIL '4 7) P.T.7z Rlt: E~_ GilO TP 7SA MR L4/YR RATE < JAtY. '>&) C.E.D. b. Results 0). Reduce cost op vaai pppchas&s *3 7si 00 o //V /fB7. *tM /# /fcs (2)- ReovcE COST OP AAAAttfPAert/RtS/O TO &O0*/ls ZA/ /?B8, 2. Decrease uacoord/a/a teo d o u//v ts/we B SO, 000 LBS VAM CBY 1118677 3. REDUCE~ 72Zt TO CHAA/QE Ot/T CATALYST BY / SR/ET I ZS,OOQ LBS VAM RSV0032754 V A M P fto duc t/ oa/^ M A I Los / y n U a j t Co s t , u b/ * / VAlW /9>7 GOALS CAPAC/7Y / COSTS BO 63 '66 *67 YA* Vott/*f~ MM13J 28.7 V Cd>57"y A3./S +32 />.>+ ss./ 8.7+ ( 636) 8+7 C 8.2^) 13 U // /* f 3 7 CBY 1118678 RSV0032755 CoST-5 Raw Ma O DtRsSC7~S Sa/0//?'C7~'S Total , ^/lB /?< A c^ - 6. 1.3 0 .6 ? <5.4 7 !Jt>7 Goal. 4. 2_ 2 J.3 2. 7/ 3.2S~ Cost Savjass Stems Snclvoeo 7/v Goal Above' /. Lower Acet/c Act* Cost 2.. Lower Acetv^e/ve Cost 3. Lower Mai/vt. Cos~r ?! it, 200 SSyC>oO 33, OOP / 9 9,800 Cost Savia/g Stem A/ot Sw Coal. 4. Optimize catalyst usaoe CApril) ZS^OOO Total. Sav/a/g s ?zz*,aoo CBY 1118679 RSV0032756 Quality DuPL/CATE P&/?E0RMAASC I- Mo ope spec.. Material s#/ppej> 2 Mo CUST0ASE/? CO MPL At/V7~^ C8Y 1118680 RSV0032757 19 66 VCM tf VAM MAINTENANCE GOALS CBY 1118681 RSV0032758 Maintain VCM Plant for $660,000 540,000 Below 1966 5f4 66 Goal 9 Mo. Cost 66 Est. $660,000 $561,000 $736,000 Why Goal Was Not Met 1. Upgrading of HCL Plant $30,000 2. Excessive Catalyst Charges $2 2,000 3. Corrosion $ 2 0,000 4.22C3-2 Overspeed 3$12,000 CBY 1118682 RSV0032759 Year CBY 1118683 RSV0032760 Maintain VAM Plant for $ 138,000 <512,000 Below 1966 Std. 66 G oa 1 9 Mo. Cost G6 Est. 1138,000 $138,000 $186,000 Why Goal Was Not Met 1. Foul iny Problems $ 18,000 Z. Corrosion $ 13,000 3. Electrical Problems $ 9,000 4. Debottle-necking Cost $ 8,000 CBY 1118684 RSV0032761 RSV0032762 I%7 \/CM t VAM Maintenance Goals I. Maintenance Cost Dept. 66 Est. 67 Gaul $ Gain VCM $736000 $56^000 $172000 / VAM (186000 $153,000 $ 33,000 PLAN 1. Improve preventitive maintenance program 2. Monitor equipment with I.R.D. CBy U1868S 3.Improve catalyst unloading equipment 4.Improve catalyst unloading procedures 5. Coupling improvement program 6. Low maintenance cost in dept. 26 RSV0032763 I. Increase Maintenance Productivity Dept. 66 Actual 67 Goal VCM 56 % 64 % VAM 65% 67% PLAN 1. Stabilization of manpower 2. Afternoon line-up of leadman 3. Backlog of fill-in work 4. Job clean-up CBv 1118687 RSV0032764 Decrease Maintenance Overtime Dept. 66Actual 67Goal VCM I2> 9.62 VAM 11.45* 6.0> PLAN 1. Better analysis of overtime 2. Reduction of mechanical failures 3. Improved workmanship CBY 1118688 RSV0032765 PT&E PROGRAMS FOR VAM & VCM 1966-1967 VAM-1 VAM COST - 1966 Stopped purification fouling Value - 65 M lb/yr rate Demonstrated new catalyst Harshaw (78^) Calsicat (75^) Value - $40,000/yr. plus -VAM.-2 VAM TECHNOLOGY - 1966 Reactor system fouling: Methyl-acetylene Other higher acetylenes Quality upsets: Bi-acetylene Divinylsulfide Benzene "VAM-1 VAM QUALITY STATUS Monsanto equal to or better: Borden, Shawinigan, Niacet, and National Starch. Monsanto much better than: Celanese (P), Air Reduction, and Du Pont. ACETYLENE Distribution Purchases VCM Usage 1966 @ Max @ Min VAM-5 ------- \ 1967 Zero @ Max VAM Equivalent From Header From VCM Area 50 M 15 M 45.0 M 11.2 M TOTAL VAM 65 M 56.2 M ACETYLENE SUPPLY Purchased Acetylene Plant Dept 18 H2S04 Acetylene Purifications H3PO4 To VAM To VCM To AN V55T5Z REDUCE VAM PURCHASES Itl A Cost Value Opera tior 1 $24,000 $208,000 2 25,000 106,000 3 15,000 131,000 Exp . 300.000 880.000 1-1-67 1-1-67 4-1-67 1-1-68 $364,000 $1,300,000 1968 y CBY 1118689 RSV0032766 VCM-1 VCM-2 VCM QUALITY - 1966 All specifications met Polymer problems at Spfld. Trouble shooting Help on analytical work Chloride/Acidity test Being evaluated VCM COST - 1966 Successess Control product column Control EDC cracking New catalyst in oxidative VALUE $226,000/yr Failure Ion-exchange for HC1 removal from VCM could have been $50,000/yr Ji VCM-3 VCM TECHNOLOGY - 1966 ^ PLANT Oxidative chlorination with 12.57. 02 in feed. To 40 M from 27.5 M EDC/yi Fenwal Protection installed LAB 157. 0, feed tested KA 101 catalyst tested Potential 50 M EDC/yr & 25% lower catalyst cost r VCM-4 VCM QUALITY STATUS Dow has least impurities Monsanto has most impurities Goodrich, Monochem, Tenneco, and Union Carbide (TC) do not meet our specifications. Methyl chloride is the only impurity above 5 ppm in our VCM. VCM- 5 VCM QUALITY - 1967 Assist Spfld. on problems Improve analytical methods Set up a new specification based on the Chloride/Acidity test to replace the present HC1 test. YClfcfi. VCM COSTS - 1967 Catalyst in Hydration and VCM reactors VCM loss from product column EDC cracking system optimum VALUE $115,000 in 1967 JA ./ CBV 1118690 RSV0032767 VCM- 7 ^ VCM - 1967 Firm up the justification for oxidative chlorination plant demonstration of 15% oxygen feed and KA 101 catalyst. Cost - $ 300,000 r CEV PROJECT Studies completed. Decided to buy. Glass-1 1 Value - $1,500,000 J ______ / Glass- C WEST PLANT EVALUATIONS Continuing: 1. What to do with O2-C2H2 2. Alternate routes to VAM 3. New methanol plant 4. Possible combinations NH,-Me0H-Ac0H-VAM ^_____ > PERSONNEL J/ Glass-3 > Beginning of Yr. '66 *67 2_c2h2 Methanol 3-112 3-1/2 2-1/2 5-1/2 VCM 41 VCM-Oxidative 4 1-1/2 VAM 3 4-1/2 TOTAL 18 15 _________ J/ V _ JA Gla ss-4 f PERSONNEL CHANGES '66 f Transfers to Mfg Transfers to other PT&E Resigned TOTAL LOSSES New hires 4 4 _2 10 _7 NET CHANGE DOWN L 3 l____ / yy C0Y H18691 RSV0032768 OXYGEN ACETYLENE 1966 PERFORMANCE 1967 GOALS PROGRAMS CSV 1118692 RSV0032769 MINOR INJ RATE IMIS/MM MANHOURS COAL 2 00 ACTUAL 205" MINOR/SiiRIOD-S RATIO S/f 7fl DISABLING INJ. o o TIRES Oo SPILLS oo PLANT MGR'S. HLSP INSP. Ah AO Ah OVERTIME 5"7oS 7 L9G7 PROGRAMS PROCESS HAZARD REVIEWS Equipment and area inspections operating manual review and upgrade OPERATOR TRAINING FORMAL AND INFORMAL SAFETY Concentration on Personnel Tf?AIbllblG Relations %7 -GOAL 2 00 S/I O o o AA S7dg7 CBY 1118693 RSV0032770 !<? PERTORMANrr SAFETY - minor intuRizs O &ISA8LI N II O pj^ES O 5PUIS RETRAINING of Ope&fi-To&s TRAINING nF ^UDeRYlSPRS Rewrite, operating manuals Oi/E^T)Mp (TotlL ftCMit VELJ) ftc Hl^tCl=-2> ftcH/E/E D Achieve 25 ftcrt IE V(b> ftcH/eZEL ft eft/e za D tt 81. ACTUAI 77. OXYC EM VOLUME. RJ.P Total MF& Cost Acetylfnf volume R2.R TOTAL M re. COST 22 0 M To^5 203N\ 77a/s rZ.70 M * I CD fz\ *5723/77/7 *6.+D/7oh 102 MM Z,g ?ljO0 7 m. <o.DCEm/8 77lss. CBY 1118694 RSV0032771 \%7 goals SAFETY - ^zswinor injuries O 0>/5 fl oUNG 11 o fires o SP/LLS Pollution- tighten controls TRfUN Supervisors train Hourly Mid new capital Capital s-pending- /U/d/d .Expelsa spending- Ai/oid Permanent or Long Term RPRSonnlL - Train Key Superi/isidn To operate Plant Condition People For plant phase-out PIP OYYGEh/ Acetylene ^I55jooo *G07j0oo v'olumf OXYGEN Acetylene. Hqst~ oxygbn Acetylene 2-4-D,000 Tons 104- MM LBS. X ET&O/T^N Co.OG C ents/LB. CflY U18695 RSV0032772 11 -p, 9 *o to h~ ~f. O^ | OXYGEN 1967 GOf\L v.* '***.., VOLUME (Tons) Cost t/ko(V VOLUME (t.ni) Cost */isON GOAL 220 M ACTUAL 20 3 M 6. 232 m 6.25~ 2fOM C8y 1Z18696 *SV32773 11] 4 o oo m 5 OXYGEN 1967 GOAI S -------------**.. TONS COST &TON STEAD UTILITIES HANPOUER REPAIRS OTHERS IIMDIRECTS CREDITS NITROGEN AIR OXYGEN STD GOAL ACTUAL. STD ACT1JAI 18J00 18,340 18,180 19,79019; q 89 5 83 6|40 6 25 5 60 002 766 647 675 c11 1374083676 002 a1 10 41 67 34 27 176 02 00 d 1 85 53 68 80 35 95 002a11 664623175436 2 39 0 0 58 64 0al 95 33 44 00 0 333 335 058 0 0 Cl 33 33 06 0 0 0 30 37 05 0 0 0 30 37 05 CBY 1118697 RSV0032774 OXYGEN P.l.R 1 B. MAIN AIR COMPRESSOR TURBINE EFFICIENCY 1 CONTROL CHARTS 2 TURBINE DESALTING 3 CONDENSER CLEANING C MATH MODEL OF 0- PLT. GAIN OPER./* 2 2 500 1 OPER. 47,000 PT.+E. 28,500 2. REPAIR COSTS A.REVERSING EXCHANGER B.MAIN AIR COMPRESSORS 1 PM PROGRAM 2 THRUST BEARINGS C. AIR DRIER PM. PROGRAM OPER 15.000 40.000 MAIN! MECH.S. OPER. . 2.000 TOTAL & 155,000 1968 REALIZATION 1. RAISE 0 RECOVERY TO 90 % RT+E. ^16,800 2. USE WASTE LPN AS PURGE PT+E 48.000 GAS IQTAIr r 64.800 CBY 1118698 RSV0032775 RED-COST $/|O O LB S BLACK-AVG. MONTHLY PROD M LBS ACETYLENE GOALS 196 7 VOLUME (wm LBS) 196,6 ^TANLARD GOAL. qs:2 102.0 COST (cenTS/LB.) 6.9+ G.00 VOLUME (mmlBs) 13EJL 100 104- Cost (cents/lb') (&>GB (o.O(o acti/ai <17.0 6. S'? CBY 1118699 RSV0032776 LO CD ACETYLENE GOALS 1 96 7 e: CBY 1118700 RSV0032777 ACETYLENE PIP 1. CONVERTER YIELDS (operate) IMPROVE CONTROL (^CONTROL CHARTS) Lower operating p-Chemical cleaning JS a.j n ^77,000 .OPE GA S TO BOILER HOUSE (operations) ^150,000 IMPROVE CONTROL OF PLANT COLLEYS I EM 3._LPWER SOLVENT(NMP) USAGE $80,000 OPTIMIZE MONOCHEM Fouling Rates-Down time- RepmRS(OPR) (so,000) CONTROL OF WATcr in Solvent (jOPRj control or Polymer FITTER' CAKe(>T-,) (D,DOOj CRACKED CAS f.OMP. STEAM (pp^; * OPTIMIZE TURBINE EFC AND DOWNTIME *48,000 5. REPLACE DIESEL WITH CARBON Bl kCK Oil Q>T-if37,000 6. REDUCE REPAIR CO.STS 15,000 BAG FILTERS" IMPROVE REPAIR EFR (m/NNt) ($0,000) optimum on-stream improve capacity (opr_j (?tL) Converters- improve repair eff. c^mr) (40,000) C HEM. CLEAN Q> VESSELS (OPR/' y cracked Sas compressors f opr.528,000) OPTIMIZE. PREVENTIVE. MfUNT Am M/UnT RUN-LENCTH, AND FOC/LIW6 V PURIfication-Optimize monochem CBY 1118701 TotAL RSV0032778 PROCESS TECHNOLOGY & ENGINEERING 1966-1967 GOALS & OBJECTIVES PERFORMANCE & PLANS - OXYGEN-ACETYLENE CBY 1118702 RSV0032779 CBY 1118703 RSV0032780 (9 6?T ^o/s-u*s CBY 111870% RSV0032781 S A FELT V ^ll NOR. Xm>Jo^iE.S Tot-/\ ---- 1^6<^------ L. A cjtuau. IS 19 o 2. IS ^.o 1^6,7 ^OA L IV o IV Pro: I. TuCLUbE. ^AFE-Ty IN ALL -JOB "PLANNlW^BoTI4 OPESACnoUS AlJb rWAlNTEWAUCE. AnALVZE. all ACCIbeiJTS AMb IWJUEIE.S ftub "TftkE. FROKHPT COK-EECT/U6- ACTIO W. 3. PeoMCITE^ sA^ETy WITH EFFECTIVE; mEAWIfJ^FL ^afet/ mEernu^i which iwctubE all PFE^OK)AJL KE^utAE.Ly AS^IAiuab -Rs ttepT, 31. CBY 1118705 RSY0032782 PEtg.FO^JV\ A I46S" PRO])UCT/6 0/ rvt ML. ICTTAL IHF^. CtfST U)IT GmT, 4/aL 2S", q 57 3,240,700 K.3C ^>AL 1466 04,442 ^3,2^30 12.23 26,7i> *3,171, Sbo 12. Z3 I, Teuio C"S/ rWoUTH-5^ BSTUJEBKJ "TOTAL t>EFT Z. H*b Cs> PARmAL E3E FRONT'S. 3. 31C.5-3 ceAkifc^HATT" failure, cm^t t(3,ooo RERM6.S FrtJb 500,000 AL. 'PTSO^OCTmDAJ. 4. ETv/AtLO ATIOIU of -Haesha^ catalyst: id CBY 1118706 RSV0032783 (c{ior7 Pf^o^Arv\ ^ pRODucnoiO, n ml. "Tcrr^L Cost- (J<U/T Cb-iT, <t/AL. >ro$s 'Fkew' PROFIT X*PROVE weAJT* K (p C> X(C'(o<\ Z ^3,24,4, 300 12.23 4 2., 074,(00 /OAL 1<T67 30,000 4 3, X77,<?oo (0,^3 4 2,72?., too 4 &48, o^o (, EumiuftTE a TcrrAU DEJFeosT Auti iaEt>ucF PactiAt-- PEFROSTS FR0Af > -* 3 . 2..QOO.OCO 6fll. "*EuiHtAJftTE. OlAJOR EGpUlPwe/UT FAlUUfcFS *UCN AS ElO^flUE. C<2*N<SMAFT5. $ 113,000 500,000 ^AL, 3. 2.S% IMC(2EASE> YlELb U)ITH tfAfcSWAUJ CATALYST 400/00 4AI 4. XmPiaoYE E-QuiPhaeut oN-stream time., 4oo,oqo 6Al 5. Shutdoujo chemical tceatmj^ By Ap?l (. ^44>,|oo . ^> , TmcEBASE. CfP-6A^ CEEfc>i*r BY |(OCEEASt^>^ 31 C4 00wP12E5so_ CA-PACiry. 8V Jao, (. ^4o.pod CBY 1116707 RSV0032784 PROCESS TECHNOLOGY A ENGINEERING 1966-1967 GOALS A OBJECTIVES PERFORMANCE A PLANS FOR METHANOL CBY 1118708 RSV0032785 ,MeOU-7 PT&E *67 Programs I. QUALITY II. CAPACITY III. COST REDUCTION IV. NEW METHANOL PLANT STUDIES V________ J f II. CAPACITY Me OH-9 A. Linde Unit Reduce downtime Improve Syn. Gas Quality. Value '67: 2 M gals. MeOH ($330,000) V Jz \MeOh-11 COST REDUCTION Commercialize resin-bed process for removing iron carbonyl. '67 Goal - $46,100 from obsoleting present chem ical treating. J QUALITY .MpQH- 8 "\ Objective: Meet division goal. Program: Identify and mini mize impurities. II. CAPACITY \MeOH-1 B. Reactor Yield Optimize Bed Temp. Profile Use 2d chg. Rarshaw Check all catalyst before use. Value 67: 400,000 gallons ($66,000) MeOH- 12 IV. NEW PLANT STUDIES Objective: Define methanol synthesis^ technology for new 100 M gal/yr metha nol plant based on steam reforming. Potential: $2-3 M/yr increased Division pro' fit. CBY 1118709 RSV0032786 AN HCN REVIEW FOR 1966 CBY 111871 RSV0032787 SAFETY GOAL* Equal or beai best previous Safety performance Operator Inj. ~.o+al Inj. Serious Inj. Lost Time Inj. Fires Spills HCN Incidents Housekeeping Goal <8 <33 <2 0 0 0 AA 1966 YTD II 27 I 0 0 0 AA CBY 111B711 RSV0032788 CAPACITY Goal: Make every lb. of AN needed fo best balance AN cosf 4 CZHZ distrSupply HCN demand most economically Budget Goal 56 YTD `66 HCN 75.4 (754) 54.1 (666) Crude AN 130.2 130.2 325 109.7 Pure AN 132.8 ([32jD 91.3 (mT) TBA 4.5 3.37 451 LN 6.45 6.45 6.54 3.02 CBY 1118712 RSV0032789 QUALITY om___________________R__E_SULT. S 1. All AN W+ AN 200 Spec. 2. No product qualify compla'm-Vs 2 " minor- 3. Resolve specs 'Tor Ac H +0 Unoff* c i a t spec mee+ Carbide needs. st on AN <0.02 Rev ise opera+ior5 4 equip, Lo AN <0.02 meet- these specs I^Qtr 66 4. Work with LA on phosphate Reduced from redaction in waste NH^CI which 1.5-2.0 7- io Comes "Prom LN. 0.5- 1.0 7 CBY 1118713 RSV0032790 RSV0032791 i COSTS HCN '65 Actual Budge! Goa 1 '66 YTD '66 Pred. Prod-, PI lbs 75.3 754 (754) 54.1 (6&6^) Ram Mf 1, Utilities, Repairs , Catalyst, t/* Ofher Dir. J Indi reefs, /* Total Cost, t/* 1.871 0.341 0.420 0.081 0.543 . 0501 (3.840) 1.683 0311 0518 0.153 0.490 fl-5// 3.666 1.644 0.311 0.455 0106 0.476 OSH 3.503 1.459 /.472 0350 0.368 0300 0.412 0.035 0.03/ 0.547 0570 0548 0.561 3.379 r3.47^ '65 Actual AN *66 Budge! *66 Goa 1 '66 YTD '66 PrU Prod., M lbs 134.4 1376 <J32^> 91.3 (joae) Raw Hail, */* 6.986 Utilities, 0.55*4 Repairs, 0410 Cafalusf, A 1.496 Other Viry $-/* 0.579 Tndirects, $/* 0776 Total Cost, t/* I(YflflOT) 6.143 0.562 0.5/3 /.284 0.643 0.7// 9.863 6.143 0.562 0446 1.525 0.639 Q0a.7/s11V) 6.266 6.270 0.579 0.57O 0.466 0.530 1526 1.460 0.666 0.650 0.761 0.76/ 10.264 dmb CBY 1118715 RSV0032792 1966 YTD VARIANCF5 *fl|ru Sepf. m Variance Off Sch Unsch Cap Total Volume + 39.273 - 70.652 - 3 J.379 Performance + 36.999 Price + 99,070 Total Wariance AN + 105.680 Variance, Off Sch l/nsch Cap Total Volu me - 8.347 - 1(7638 " 125.985 Performance Price - 248.955 CBY 1118716 ~ 45247 RSV0032793 1366 PROFIT IMPROVEMENT Project 6G Goal 66 Est HCN 1. NH3 pipeline to reduce raw materiaI cost *169,000 # 224,000 2. Optimize individual 14lager gauzes -for better yields 30,000 25,000 3. Maintenance cost reduction 15,000 59,000 4. Optimize gauze ihicKness Iota 1 _20.000 0 *234,000 *308,000 AM 1. Improve reactor control *60,000 67[000 tor better HCN C^H* fields 2. Catalyst usage reduction 227,000 220,000 3. Maintenance cost reduction 50,000 91,000 4 Improved recovery tram 20029 OH recycle Iota 1 -- 4$000 4 337,000 *422^000 CBY 1118717 RSV0032794 1967 GOALS For AN i HCN CBY 1118718 RSV0032795 SAFFTY Goal: Equal or beat best previous performance Besf Perf 1967 Goal. Operator Xnj. Tofu I rnj. Serious Xr\jLost Time Xnj. Fires Spiffs HCN XncidenTs Housekeeping 7 32 f 0 0 0 AA 7 or less 32 or less I or less 0 0 0 AA Projects i. Upgrade NH3 pipeline system instrument's -to greater reliability sa-Fe /y. 2. Evaluate neu) level indicator probe in HCfSl Storage $ adopt it proved superior-. 3. M aintai n department# / satety f ho uze.keepi n index programs. CBV 1118719 RSV0032796 1 * capacity GOALS'- AN - Produce (juanfil^ of AN (up to 140 RtJfjr rate) as determined by marketing demands 4 economic optimisation of West Plant C.B. Pad !i tie HCN- Produce quantity adequate for A N> TBA, 4 LN requirements up -bo plant- capability (90 TBA- Expand TBA Capacity from 4,5" "fro 5.4 Meffective 4-1-G71 Produce TBA required within Capability, LN - Meet all Lactic Acid re^uiremenfs tor LN in manner so as to not limit Lactic Acid operations. CBY 1118720 RSV0032797 QUA! ITY GOALS: I. All AM to meet AN 200 specs. 2 No product quality complaints. 3. Work u/iih P774 E and Laboratory to better define MVK analytical and quality control technology. CBY 1118721 RSV0032798 HCN COST Prod, M |bs 1966 - Est. 66.6 Raw Mafl, fy* UfilifiSj /* Repairs, $/* Caialysi, t/* Other D\r^A Indirec+s^ $/* 1.472 0.368 0.412 0.091 0.S7O 0.561 Total Cost, 3.474 196 7 Budqeh 63.94- 1.52 0.37 0.49 0./2 0.62 0.59 3.71 1967 Goa 1 63.9+ 1.50 0.37 0.43 0.12 0.62 0.53 3.63 CBY 1118722 RSV0032799 AN COST Prod., PI lbs. 066 E s+. 108 6 Raw Plafl, $/* U'f i I tis, Repairs, $/* Catalys+'tA Other Dir, /# Indirect^, /# .270 0.570 0.530 l.40 0.650 0.761 Total Cost, 10.241 1967 Budge! 107.10 1967 Goa 1 107.10 590 0.640.54 1.27 0.87 0.86 5.79 0.640.51 1.27 0.85 0.86 10.08 9.92 CBY 1118723 RSV0032800 1967 PROFIT IMPROVEMENT Project 'J/ VJUML HCN 1. Misc. equip, improvements *17,000 2. Evaluate IS layer gauze 3. Reduced maint. costs Total 15,000 22000 * 54,000 AhL I- Catalyst usage reduction 2 Reduced maint. costs 3. Improve CzHziHCN yields t Increased AcH production 4 safes 51 Reduce sample load +o Control Lab Totci | CBY m72* 230,000 33,000 85000 33,000 20,000 * 401 non RSV0032801 P0I1UT1QN f.ONTROl Goals = I. Establish mechanism to prsvenh Dept, 19-20 SUrnp overt low -to -the. Sewer. 2 Main+ain do se control ov,?r Te<?-d (waste s) 'to D*pf. 4 4o ai/c>id sluq s cyanicfe polymer- and b.tah cirr.monio ! l<. G>. >*n<dy and implement it f :;> Ttiirfher means of re.duc-jrr> :iir n n d h a >/ po I Inti on. CBy 1118 725 RSV0032802 PFRSQNNFI GOALS: 1. Counsel all supervisors in 1967 2. Counsel hourly personnel as necessity for msfrucfi'on, correction, commendation> guidance^ etc. 3 Stimulate Communications ujith a) Weekly supervisory meetings. b) Chief Operator meeting at least Once per quarter. 4: Train all operators to qualify for all Jobs in their respective depart ments. by J-l-68. 5. Obtain adequate hourly sta ff i ng 4o maintain overtime between S' 3 Vi with critical monitoring of absenteeism C0Y 1I1Q7?& RSV0032803 1966 TECHNICAL RESULTS car 111B727 RSV0032804 $ SUMMARY OR 1966 PROGRAM GROSS probab SAVINGS POTENTIAL ility ^ TIMES SAVINGS AREA (*Ar) of SUCCESS WW HCN 30M 80% *I8M * 2ff1 AN R* IH0M(y|elds) 15011 (catalyst) izsnResidue Recovery 60% 60% 99%' `42H `84M '90t1 `6on '!2r>n LN 7511 TOTAL 520M 70% '25n '52M % l45M`375r 1 Assuming project approved CSV 1118728 RSV0032805 RAW MATERIAL USAGE 1965 VS 1966 Ibs.HCN /I00 lbs.AN lbs. Cu -- 57- -- 56* ss- - - *tio- lO xO 53' 2 52* - - ---- 51- 1966 RSV003280* SIGNIFICANT DATES AUGUST65 - REACTORS AGAIN IN GOOD MECHANICAL REPAIR MARCH 66 -SWITCH TO HCN CONTROL FROM "MVA CONTROL JULY `66 - REVISED CONTROLLERS INSTALLED CBY 1118730 RSV0032807 POUNDS OF C,H RSV0032808 *. HCN/ 100 lbs. AN HCN USAGE RSV0032809 lbs. C u / 100 IU. AN CATALYST USAGE x CBY 1118733 RSV0032810 o 196? GENERAL TECHNICAL SUPPORT FOR BOTH AN AND HCN EMPHASIS ON a. Reactor studies to reduce raw MATERIAL 4CATALYST USAGE "TARGET : 62 IbsGtVL/lOO IbsAN <5.9lbs.Cu /100 lbs.AN -PROBABILITY OF SUCCESS 60% 'VALUE -RM" $90M/sfR.(CH.') 1$ IOOMAr. (cktaiyst) b.Optimum low rate operation C.SURVEY TO DEFINE LOSSES UNDER PRESENT CONDITIONS AND REDUCTION OF LOSSES AS NECESSARY CBY 1118734 RSV0032811 COM PLEX AND METHANOL CBY m735 RSV0032812 c SAFETY FOR 19GG goal: REDUCE 5ERI0U5 injuries TO TOTAL INJURIES BY 1-5 RATIO. NO LOSS TIME INJURIES. MfTHOD'lB/isrF DISCUS5 ION ON SAFETY WITH LEAD- MAN ON EACH JOB LI HE-UP. Z.HOIO SAFETY MferMOS WITH CRAFTSMAN PRIOR TQ AND DURING SHUTDOWNS STRESSING INCREASED HAZAADS DUE TO HEAVy WORKLOAD AMD IMCPfasFD numbers of craftsman assigned. 3. Hake a safsty meftia4 w/fm /ill our?,pe JtPFAV/sapS PALOM JV SHuTDOWp. 4 (0MCFM7~AP7EP EFFoPTS Ta ST/MfLA rzr SAFery awaffmfss amp att/tvofs of All zomf afs/swfc* Pfjc s<ja^a/fl. s CoNr/Nue 70 pfimfim with PpaPUcr/M ANY PorFMT/ML PXACFSS AA^FPDS. 4 TOOL BOX IIYSPECTIOAI OvFPrFPLY OF All Ma>wisy/amcf 7*l &a* s rMF Z.OMF. CBY 1118736 RSV0032813 SAFETY RECORD FOR DEPT Ofc C,. ^CONVERSION I9U 9JM0.ACI %L IIMBIM INJUR ES INJURIES (MINOR/(Ml NaK/$Ffc*Ms) 9/1 GH* PURIFICATION WASTE DISPOSAL 7/e 9jfL H. C.N. T. B. A. 9/0 % AN LN l/o Vo Me OH total J/L *s/l GOAL 1967.' MAINTAIN THE RATIO OF SERIOUS INJURIES TO TOTAL INJURIES WHICH IS 1-8. 1118737 RSV0032814 c PRODUCTIVITY FOR 1964 - L967 AREA GOAL ACTUAL EST GOAL I9U I9U I9U 1947 0t CvHt COKVERSION 70Z G3.Z7. 452 70% ClUl PURIFICATION WASTE DISPOSAL 45% C-4|t- BAG FILTER L5% 6&3Z 6/.# 40% 65% >5Z H.C.N. T.B.A. AN LN MtfOH TOTAL !o5% 10.8% 10% 70% Q.UT. jOZ (o57o 70%\ 65.5% i3Z 70% 47% 63./% 43.6% 67.8a CBY 111B738 RSV0032815 It/IETHOD: 1 CLOSER SUPERVISION IN ALL AREAS DURING TIMES OF LOW PRODUCTIVITY Z. AFTERNOON MEETINGS WILL BE HELD FOR THE NEXT DAY LINE-UP ON SCHEDULE WORK. A. CHECK AVAILABILITY OF MATERIAL B PERSONNEL GO TO WORK AT 0800 WITHOUT JOB LINEUP IN THE MORNING 3 MAINTAIN ADEQUATE LOW PRIORITY OR BACKLOG JOBS IN EACH AREA FOR FILL-IN ON EACH DAILY SCHEDULE. 4- PERFORM MORE CLEAN- UP Gt: A DAILY BASIS. 5. CHECK MAINTENANCE PERSONNEL DURING REDUCED RATE AND TOTAL SHUTDOWN TO ACQUIRE MORE SAMPLES. CBY 1118739 RSV0032816 OVERTIME 1366- 1967 AREA AOk CONVERSION C H* PURIFICATION WASTE DISPOSAL Ci Hr-BAG F/LTER H.CN. TRA. AN LN Me OH TOTALS GOAL 13GG 707. ACTUAL ESI GOAL ixi 1344 1347 68% /o.7% 702 8.07. 8.07, 55% 53% <95% 6.02 442 45% 6.5% 4IZ 4.2% 502 8.0Z 3.07, 1M7o 5.SZ 12 CZ 6 0% 02 I4-.07. 8.07c 737, 6.4? CBY 1118740 0 f * RSV0032817 METHOD :i. CLOSER SUPERVISION OF i CRITICAL JOBS. ^ BETTER UTILIZATION OF STABLE MAN POWER IN THE ZONE 3 PERFORM PREVENTATIVE MAINTENANCE ON CRITICAL EQUIPMENT DURING REDUCED PATE PERlOD.fNO LOSS OP PRODUCTS.) +. ADEQUATE SUPERVISION ON OFF SHIFT BASIS TO UTILIZE SHIFT PERSONNEL. IMPROVE COST ON OFF SHIFT. 5. MORE REALISTIC 5TAFFING OF CRITICAL JOBS ON DAT SHIFT. (TO REDUCE CALL OUT AND OVER TIME ON DAT SHIFT.) CBY 111B741 *<" * a RSV0032818 AN COMPLEX AND METHANOL AREA 9mACT l2tno.EST. STP. 1966 7966 /97 GOAL 1967 O* C*H* HC.M AN WASTE ^b.a. lN MeOH *131,046 * 4-8,595 * 37, 993 t /L6&9 J 77,36/ * 3,343 120,48/ ZZ47,046 # 10? 4 9/, 4-49 \ Zo.OQO * % 668 t 4,X,/f * /Z.9S4- *14/200 *133,196 * *70,000 f 469,000 i 3* 700 * 49.100 *L 24,000 *378.000 *142200 * 761,796 *\2S3,600 *435,000 4 s/.ozo 4 49,zoo # 7.4,006 Z8t>. OOC TorAL- *2/4,080 *374,4-^4 *ZJ67,Z% *Z,OaU/6 iZWST-/9U J/963,436 GOOl /967*z,oo3,z/6 11187^2 CB* A *Ojz tf A 06 RSV0032819 ' AN COMPLEX AND METHANOL S.D.R. ACCURAL 1365-13U '-*1,836,480 5.D.R. EXPENDED EXTRAPOLATED - /, 786,833 TOTAL E.PR. CREDIT-* i!0,677 Sp.R.ACCURAL 1367 -*78SSZ S. 0. R. EXPENDED EXTRtfDUTEK, /967 *360,000 /967SDR CREDIT ^23 8j9Z CBY 1118743 RSV0032820 / IMPROVE MENT OVER 1146 SAFETY: 19t>4>-REDUCE THE RATIO OF SERIOUS IN Tunis's To MINOR INJURIES TO 1-8. 134.7-SAME AS 1966QR BETTER PRODUCTIVITY: 1966-GOAL 67% 196,7- INCREASE TO 67857. OVERTIME: 1964- GOAL 767. 19 67-DECREASE Goal TO 6.<4-% MAI NT. STD- 1966- COfi L *2/42.000 19 4.7- 6OftL^O0S,Z/b l9UrEST&`Mb.+36 /H7-6crE-Z,O03: ZJ6 CBV ill 8744 RSV0032821