Document rpvBR30rDNoNqGQGxon4J5qv0

Monsanto b I/I-- OU ,MM( ft LOCATION I 5, McWilliams, W. g, Krummrlch,Plant - Sauget. Illinois OATI OUBjCT NIKRIMCI June 20, 1972 cc COMPANY CONFIDENTIAL TO Messrs. Do C. Armstrong - WGK F. J. Holzapfel - B3NA W. W. Ban - WGK' D. B. Hosmer - E1SF E. R. Billen - WGK R. E. Howard - F4WA R. M. Blowers - WGK W. K. Johnson - R2E J. W. Boehm - WGK R. J. Kozacka - F4WA G. L, Bratsch - WGK W. A. Kuhn - B3NA A. R. Brown - N1A A. E. Leisy - WGK C. F. Buckley - WGK R. E. Lischer - F4WA A. J. Burns - N1A D. K. Lynch - WGK H. C. Carder - B3NH G. B. Maurer - WGK G. R. Davis - WGK R. M. McCutchan - WGK P. 0. DeGarmo - T3B R. L0 Nettesheim - WGK G. K. Dimkoff - WGK R. Perry - N1A F. M. Elliott - WGK W. B. Papageorge - B2NK W. C. Engman - WGK R. W. Peterson - F4WC R. L. Fields - WGK J. E. Smith , - B3NH J. A. Hayes - B3NH R. R. Sorrell - WGK Po E. Heisler Go A. Hippe - WGK - WGK E. E. Stewart G. C. Vincent - WGK - WGK P. B. Hodges - E1SF D. L. Weber - WGK H. G. Yapp - WGK Enclosed is a copy of the presentation given on June 9, 1972 concerning Wo Go Kfrummrich Plant HC1 recovery plans. /tm att. PAUL HODGES DEPOSITION May 31 - June 1, 1994 EXHIBIT NO. 39 S. McWilliams Technical Services Department CER 099648 CONFIDENTIAL 92-CV-204-WDS HARTOLDMONOOQ7325 Page 1 6/20/72 BACKGROUND The increasing need to supply a consistent amount of HC1 gas to Dept. 217 (Chlorosulfonlc Acid), the uncertainty of the Aroclor business and emphasis on the ecology has stressed the importance of the HC1 situation at W. G. Krummrich Plant. In answer to these concerns, several projects have been initiated by TSD and Research. These projects Include 1) the adiabatic absorption of the excess HC1, now being sewered, for sales as commercial grade muriatic acid, 2) vapor phase carbon adsorption of Dept. 235 (Chlorobenzene) HC1 for use in Dept. 217, and 3) a group of projects to reduce the organic content of the HC1 produced in Depts. 246 (Aroclor), 248 (Phosphate Esters), 236/7 (Chlorophenol) and 239 (S&ntophen I). The latter projects are lumped together and referred to as HC1 gas clean-up projects. PROJECT OBJECTIVES Each project has its own specific objective, however, there is one objective common to all three projects and that is compliance with State and Federal pollution laws. More specifically, the plant has the following pollution objectives: 3) Reduce phenolics to ^15 lbs/day 4) Reduce dissolved solids to 750 ppm above background. At the present time Dept. 233 HC1 produces a colored chlorosul fonic acid which does not meet color specifications. Previous work has shown that vapor phase carbon treatment of this HC1 will remove the color producer. However, such questions as what would be the carbon loading, is steam regeneration practical, can the carbon bed be dried sufficiently to prevent a serious corrosion problem, had to be answered with an experimental program. An experimental program was also needed for the adiabatic absorption . of HC1 to determine the acid quality and carbon usage to meet commercial grade acid specifications. - RESULTS TO DATE Results to date in all three areas have been encouraging. These results are summarized in Table I. Based on these results it is felt that enough Information is available to propose a possible HCl distribution system that would meet most If not all the stated project objectives. This proposed distribution system is shown In Figure 1 and Includes the following features: CER 099649 CONFIDENTIAL 92-CV-204-WDS HARTOLDMONOOQ7326 Page 2 6/20/72 WGK RESULTS TO DATE (cont'd) ij Vapor phase carbon treatment of all Dept. 233 HC1. Adiabatic absorption of the excess HCl gas. . Use of product scrubbers in Dept. 246 and 248. Use'of an existing or improved sulfuric acid scrubber on Depts. 236/7 and 239 HCl. Centralized sewering of HCl. . Preferential use of Dept. 246 and 233 (continuous suppliers) HCl in Dept. 217- 7) Isolation of Dept. 246 HCl to Dept. 217 and the adiabatic absorber, no sewering possible of Dept. 246 HCl* 8) Isolation of Dept. 21o (Food grade muriatic acid) from all Depts. except 233. ENVIRONMENTAL EFFECTS AND COST The estimated effects on the environment and the estimated economics of the total distribution system are shown in Tables II and III. Table II shows reduction of over 95# in both air and stream pollution. The estimated cost of the total system is $1.1 M, with an ROI of 6.4# B.T. Including pollution related savings the ROI would be 29.0# B.T. This shows that pollution related savings and considerations play a major role in the Justification of the entire project. For this reason these projects are considered an integral part of the W. G. Krummrich Plant's water reduction and pollution program. FUTURE WORK AND TIMING The vapor phase carbon treatment and adiabatic absorber projects v are experimental projects which are nearing completion. A tenta tive process for vapor phase treatment should be completed by July 15, 1972. The adiabatic absorber tentative process and scope for an AR grade cost estimate by CED should be completed by July 1, 1972. A decision on the use of Haveg as an acceptable material of construction should also be made by then. The HCl gas clean-up projects still require much laboratory work primarily in Depts. 248, 236/7 and 239. This work should be completed in early fall (September or October) 1972. CER 099650 CONFIDENTIAL 82-CV-204-WDS HARTOLDMONOOQ7327 TABLE I PROJECT RESULTS TO DATE HC1 -Gas Clean-up Projects Scrubbing Tests Dept. 246 (PCB) 248 (Phenolics) (Phosphorus) HC1 Gas Composition Leaving Scrubber Present Max. Proposed 125-140 ppm 1 ppm^1) 6-12 ppm^2)* 1200 ppm 5-10 ppm^ 15-20 ppiJ4) 800 ppm 25-50 ppm^ 100-180 ppm^ 256/7 - no results to date 239 - no results to date (1) Using chlorosulfonlc acid as the scrubbing liquor (2) Using Aroclor 1016 as the scrubbing liquor (3) Using 66 Be sulfuric acid as the scrubbing liquor (4) Using TCP as the scrubbing liquor Vapor Phase Carbon Treatment Carbon loading (lb org/lb carbon) Steam Regeneration Cycles/bed Carbon Usage lb carbon/cwt HC1 Bed Drying Expect Actual 0.2-0.3 0.22 3-5 0.5 " 9 - ? (i) ? - 0.36 (1) results inconclusive to date (1) Tests stopped after 9 cycles with no noticeable degrada tion of the carbon bed or its efficiency to absorb. Lower limit on carbon usage unknown. . CER 099651 CONFIDENTIAL 92-CV-204-WDS HARTOLDMON0007328 TABLE I (cont'd) . Page 4 6/20/72 WGK III. Adiabatic Absorber Dept. Muriatic Acid Produced Organic removed Color 246 (PCB) . 70# Clear 248 (Phenollcs) 70% Clear (Phosphorus) 0% 255 (Benzene) 100% Clear 256/7 (Phenolts) 10%. Orange (1) 259 (Phenollcs) Not tested (1) Orange color a result of chlorophenol attack on the Haveg resin. This may pose a serious corrosion problem. Target Actual Carbon Usage (lb carbon/cwt HC1) 0.5 7-0.2 Quality Appearance: Colorless Colorless HCl content 20.0-20.6Be 20.0-21.5Be Sulfates 40 ppm, max 5-10 ppm Chlorophenols <5 ppm 5 ppm Phenol. Benzene/Chlorobenzene < 5 ppm c 20 ppm (2) .. 0 ppm Cresol, CDP, TPP <10 ppm 5-10 ppm (5) Phosphorus <10 ppm 20 ppm (5) PCB <10 ppb 10 ppb (1) Except for chlorophenol gas (2) Measured tfith chlorophenols (5) Level not firm, depends on future work in Dept. 248 scrubber studies. CONFIDENTIAL S2-CV-204-WDS HARTOLDMONOOQ7329 Proposed HU Visr/t/eur/ort 'System Pit-onA..X, \ HARTOLDMON0007330 Page 6 TABLE II ENVIRONMENTAL EFFECTS Air Pollution (lb/day) Benzene Present Proposed 250 10 % Reduction 96 Soil Pollution (lb/day) Sulfuric Acid Phenolics Carbon 6700 6600 100 0 5660 5200 60 400 16 Stream Pollution (lb/day) HC1 Phenolic8 Benzene Phosphorus Carbon 57,550 56,900 40 500 10 300 3175 3100 15 60 0 0 95 CER 099654 4 6/12/72 CONFIDENTIAL 92-CV-204-WDS HARTOLDMONOOQ7331 TABLE III ECONOMICS Estimated Capital HC1 Clean-up Projects Vapor Phase Treatment Adiabatic Absorber Estimated Income HC1 Clean-up Project Vapor Phase Treatment Adiabatic Absorber Estimated Operating Cost HC1 Clean-up Project Vapor Phase Treatment ' Adiabatic Absorber Estimated Profit Estimated ROI (B.T.) Estimated Additional Savings Treatment Plant Cost Neutralistion TOTAL . Estimated Total profit Less Capital for Flow Reduction Estimated ROI (B.T.) Page 7 ^1,100,000 4 150,000 200,000 750,000 920,000 20,000 50,000 850,000 850,000 30,000 . 120,000 700,000 70,000 6.4# 20,000 200,000 220,000 290,000 100,000 29.0# CER 099655 CONFIDENTIAL t2-CV-204-WDS HARTOLDMONOOQ7332