TIMING Jan. 1976 ACTIONS DECISIONS/APPROVALS DSW 185257 Feb. 1976 1/31 Research geared to 40M pounds/month production 1/31 AR approval of WGK blending project (site may change de pending on 2/9 decision). 2/5 Presentation completed on medical/environmental pkg. 2/2 Decision on location for interim MIPB & TXS. 2/9 2/10 Complete pricing study for both short and long term* based on replacement capital. Decision on sites for inhouse manufacture of MIPB & TXS and companion blending facility. 2/17 Visit to GE on pricing. , 2/18 2/20 Recommendation to Management on potential inhouse manu facture of TXS (assumes low capital.) Potential visit to Westinghouse on transformer blend grade 2/28 change to facilitate interim blending (if WGK is selected). Revised AR approval (if Everett is selected for blending), TIMING March 1976 ACTIONS 3/1 Present test data and protocol to Federal agencies. DECISIONS/APPROVALS 3/1 Decision from GE. Need favor able response. 3/15 Complete contract signing for toll manufacture if required (MIPB & TXS). 3/15 PED (draft) for MIPB from Research to CED. 3/15 Complete business/economic review for go/no go recommen dation to CAC. 3/22 Favorable CAC decision. April 1976 4/9 PED (draft) for TXS by the TSC1 route to CED. 4/15 Approved PED for MIPB to CED. 4/15 Results of various acute toxicity tests. 1 DSW 185258 TIMING May 1976 ACTIONS 5/1 Final shipments of 100-42 to Westinghouse (if WGK chosen). DECISIONS/APPROVALS 5/15 Approved PED for TXS to CED. June 1976 6/1 Determine need to debottle neck blending. 6/15 Decontamination of used equipment for MCS 1238 blending complete (if WGK chosen). DSW 185259 TIMING July 1976 7/1 7/1 ACTIONS Results of various feeding studies. Complete AR to debottleneck blending (if needed). DECISIONS/APPROVALS 7/15 AR approval for debottlenecking of blending system (if needed). Aug. 1976 8/1 Start up toll manufacture of TXS and flashed MIPB. 8/15 Release tank cars from Aroclor 1016 service for decontamination and con version to MCS 1238 service. 1 STLCOPCB4051506 TIMING Sept. 1976 9/1 9/1 9/1 9/1 ACTIONS Start up WGK blending. 90 day feeding test results on MIPB and TXS. Industry committee completes definition of parameters for selection of replacements and issues timetable. -DEC IS IONS/APPROVALS 9/15 Demonstration of rate and quality at WGK. Oct. 1976 10/1 Begin shipments from WGK. o C/3 00 0t0o1) STLCOPCB4051507 STLCOPCB4051508 T IM IN G ________ ACTIONS jDECISIONS/APPROVALS TIMING 1st Qtr '77 ACTIONS DECISIONS/APPROVALS 1/22 Demonstrate debottlenecked blending rate at WGK. 2nd Qtr '77 6/77 Final shipments of Aroclor 1016. Begin decontamination of equipment and tank cars. 5/77 Customer long-term commitment to 1238. 6/77 PIR approval on project for in-house manufacture of MIPB and TXS. 6/77 90-day results from chronic feeding study. DSW 185263 TIMING 3rd Qtr '77 ACTIONS 7/77 Decontamination work complete. DECISIONS/APPROVALS 4th Qtr '77 10/77 ARDT from CED to Roger Beal. AR grade sales forecast to Roger Beal. 11/77 Final draft AR complete. 12/77 CED begin Project Definition Report. 12/77 AR approval for in-house manufacture of MIPB and TXS. TIMING 1st Qtr '78 . ACTIONS DECISIONS/APPROVALS 1/78 6-month inhalation study results. --* 2nd Qtr '78 3rd Qtr '78 4/78 Results of 2 year chronic studies on MIPB & TXS. j 8/78 Begin field construction of MIPB and TXS facility. 4th Qtr *78 DSW 185265 TIMING 1st Qtr *79 ACTIONS DECISIONS/APPROVALS 2nd Qtr '79 6/79 Startup in-house manufacture of MIPB & TXS. 3rd Qtr '79 4th Qtr '79 8/79 Demonstrate rate and quality. DSW 185266 TIMING 1st Qtr '76 EVENTS CHART - MCS 1839 2/76 ACTION Solicit customer information on materials compatibility. DECISIONS/APPROVALS 3/76 Identify site and rough economics of interim manu facture. 3/1 Price/performance must exceed silicone at acceptable profitability. 2nd Qtr *76 4/76 ,Define approach to TCB problem: seek acceptance of problem by customers find alternate diluent. V76 Management acceptance of approach. 5/76 Conclusion on patenability. 6/76 Begin 90-day feeding studies. s w 185267 TIMING 1st Qtr '77 1/77 ACTIONS DECISIONS/APPROVALS Complete site study for economic 1/77 Site selected. evaluation for long-term manu facture. 2nd Qtr '77 6/77 PIR submission for permanent facilities. 3rd Qtr '77 4th Qtr '77 o CO S 00 arO0o0t) 10/77 Begin interim manufacture. 11/77 1-year results of 2-year feed ing studies. 12/77 AR submission for permanent facility. STLCOPCB4051514 TIMING 3rd Qtr *76 7/76 ACTIONS AR grade estimate prepared for interim manufacture. 'decisions/approvals 4th Qtr `76 9/7 6 9/76 9/76 Check 1839 blends against emergency fire safety stan dard. Results for 90-day feeding studies. AR grade forecast to R.E. Beal 9/76 Approval of EC 202 including resolution of TCB issue. 9/76 Customer commitment to interim manufacture. . 10/76 AR for interim manufacture completed. 10/76 Begin 2-year feeding studies. 10/1 AR approval for interim manufacture. 10/76 AR approval for interim manufacture. ! coo 12/76 Alternate diluent found or search abandoned. 5 <ort0oo>0