Document rpj8Eyq85YYJO8nJ0ydRoegGq
TIMING Jan. 1976
ACTIONS
DECISIONS/APPROVALS
DSW 185257
Feb. 1976
1/31 Research geared to 40M pounds/month production
1/31 AR approval of WGK blending project (site may change de pending on 2/9 decision).
2/5 Presentation completed on medical/environmental pkg.
2/2 Decision on location for interim MIPB & TXS.
2/9
2/10 Complete pricing study for both short and long term* based on replacement capital.
Decision on sites for inhouse manufacture of MIPB & TXS and companion blending facility.
2/17 Visit to GE on pricing.
,
2/18 2/20
Recommendation to Management on potential inhouse manu facture of TXS (assumes low capital.)
Potential visit to Westinghouse
on transformer blend grade
2/28
change to facilitate interim
blending (if WGK is selected).
Revised AR approval (if Everett is selected for blending),
TIMING March 1976
ACTIONS
3/1 Present test data and protocol to Federal agencies.
DECISIONS/APPROVALS
3/1 Decision from GE. Need favor able response.
3/15 Complete contract signing for toll manufacture if required (MIPB & TXS).
3/15 PED (draft) for MIPB from Research to CED.
3/15 Complete business/economic review for go/no go recommen dation to CAC.
3/22 Favorable CAC decision.
April 1976
4/9 PED (draft) for TXS by the TSC1 route to CED.
4/15 Approved PED for MIPB to CED.
4/15 Results of various acute toxicity tests.
1
DSW 185258
TIMING May 1976
ACTIONS 5/1 Final shipments of 100-42 to
Westinghouse (if WGK chosen).
DECISIONS/APPROVALS
5/15 Approved PED for TXS to CED.
June 1976
6/1 Determine need to debottle neck blending.
6/15
Decontamination of used equipment for MCS 1238 blending complete (if WGK chosen).
DSW 185259
TIMING July 1976
7/1 7/1
ACTIONS
Results of various feeding studies.
Complete AR to debottleneck blending (if needed).
DECISIONS/APPROVALS
7/15 AR approval for debottlenecking of blending system (if needed).
Aug. 1976
8/1 Start up toll manufacture of TXS and flashed MIPB.
8/15
Release tank cars from Aroclor 1016 service for decontamination and con version to MCS 1238 service.
1
STLCOPCB4051506
TIMING Sept. 1976
9/1 9/1 9/1
9/1
ACTIONS
Start up WGK blending.
90 day feeding test results on MIPB and TXS.
Industry committee completes definition of parameters for selection of replacements and issues timetable.
-DEC IS IONS/APPROVALS
9/15
Demonstration of rate and quality at WGK.
Oct. 1976
10/1 Begin shipments from WGK.
o
C/3
00
0t0o1)
STLCOPCB4051507
STLCOPCB4051508
T IM IN G
________ ACTIONS
jDECISIONS/APPROVALS
TIMING 1st Qtr '77
ACTIONS
DECISIONS/APPROVALS
1/22 Demonstrate debottlenecked blending rate at WGK.
2nd Qtr '77
6/77 Final shipments of Aroclor 1016.
Begin decontamination of equipment and tank cars.
5/77 Customer long-term commitment to 1238.
6/77 PIR approval on project for in-house manufacture of MIPB and TXS.
6/77 90-day results from chronic feeding study.
DSW 185263
TIMING 3rd Qtr '77
ACTIONS 7/77 Decontamination work complete.
DECISIONS/APPROVALS
4th Qtr '77
10/77 ARDT from CED to Roger Beal.
AR grade sales forecast to Roger Beal.
11/77 Final draft AR complete.
12/77 CED begin Project Definition Report.
12/77 AR approval for in-house manufacture of MIPB and TXS.
TIMING 1st Qtr '78
. ACTIONS
DECISIONS/APPROVALS 1/78 6-month inhalation study results.
--*
2nd Qtr '78
3rd Qtr '78
4/78 Results of 2 year chronic studies on MIPB & TXS.
j
8/78 Begin field construction of MIPB and TXS facility.
4th Qtr *78
DSW 185265
TIMING 1st Qtr *79
ACTIONS
DECISIONS/APPROVALS
2nd Qtr '79
6/79 Startup in-house manufacture of MIPB & TXS.
3rd Qtr '79 4th Qtr '79
8/79 Demonstrate rate and quality.
DSW 185266
TIMING 1st Qtr '76
EVENTS CHART - MCS 1839
2/76
ACTION
Solicit customer information on materials compatibility.
DECISIONS/APPROVALS
3/76
Identify site and rough economics of interim manu
facture.
3/1 Price/performance must exceed
silicone at acceptable profitability.
2nd Qtr *76
4/76
,Define approach to TCB problem:
seek acceptance of problem by customers find alternate diluent.
V76 Management acceptance of approach.
5/76 Conclusion on patenability.
6/76 Begin 90-day feeding studies.
s w 185267
TIMING 1st Qtr '77
1/77
ACTIONS
DECISIONS/APPROVALS
Complete site study for economic 1/77 Site selected. evaluation for long-term manu facture.
2nd Qtr '77
6/77
PIR submission for permanent facilities.
3rd Qtr '77
4th Qtr '77
o
CO S
00 arO0o0t)
10/77 Begin interim manufacture.
11/77 1-year results of 2-year feed ing studies.
12/77 AR submission for permanent facility.
STLCOPCB4051514
TIMING 3rd Qtr *76
7/76
ACTIONS
AR grade estimate prepared for interim manufacture.
'decisions/approvals
4th Qtr `76
9/7 6 9/76 9/76
Check 1839 blends against emergency fire safety stan dard.
Results for 90-day feeding studies.
AR grade forecast to R.E. Beal
9/76 Approval of EC 202 including resolution of TCB issue.
9/76 Customer commitment to interim manufacture.
.
10/76 AR for interim manufacture completed.
10/76 Begin 2-year feeding studies.
10/1 AR approval for interim manufacture.
10/76 AR approval for interim manufacture.
!
coo
12/76 Alternate diluent found or search abandoned.
5
<ort0oo>0